Annex 10.

1
System Completion and Operation Readiness Flow
Project Planning Project Execution Operation Phase
Phase

Project Planning
Engineering & Procurement Construction Commissioning Start Up Operational Use
(Define / FEED)
Pre-Commissioning Commissioning

Commissioning : System Completion Preparation : Installation Check and Test : Individual Function Test / Powered System commissioning (Non Start-Up : Operation :
1. Prepare Commissioning Plan and 1. Prepare Commissioning Execution 1. Complete welding and NDE Up Test : Hydrocarbon) : 1. Start up facilities with introduce 1. Continue operation
strategy Plan 2. Complete painting, coating and 1. Flushing for piping 1. Piping Leak Test hydrocarbon 2. Regular Maintenance
2. Handover Plan 2. Identify System/Subsystem limits insulation 2. Lifting Equipment Load Test 2. Dynamic Commissioning
3. Startup Plan 3. Prepare check sheets and test sheet 3. Pressure test piping 3. DC System and Battery Test 2. Startup utility system Performance Test : PSR Operation :
4. Prepare Completion Database 4. Piping reinstatement and completion 4. Navigation Aid Function Test 3. Final Shutdown Test 1. Performance Test refer to PSR Operation will perform 6 – 12
Operation Readiness : 5. Prepare HCP 5. Joint integrity check 5. Power System Test 4. N2 Purging approved procedure month after Start-up and will not effect
1. Operation Readiness Philosophy 6. Develop Commissioning Procedures 6. Mechanical equipment installation 6. Switchgear and power distribution 2. Release Plant Performance project handover to operation
2. O&M Plan and strategy 7. Identify Vendor interfaces and Check Test Punchlist “B” Closing (By Project) Certificate (PP1), or resolve Non
3. Familiarization Plan prepare mobilization schedule 7. Mechanical equipment installation 7. Motor Solo Run Performance Report if plant
4. Operating Envelope Guideline 8. Prepare Commissioning Spares and Check 8. Function Test Control system Operation Readiness : performance not meet with the
consumable 8. Structural completion 9. Loop Test 1. Operation Training expectation
9. Prepare Initial and First Fill 9. HVAC Installation completion 10. Cause and Effect Test 2. Develop O&M Manual / Procedure
Task

Schedules for designated equipment 10. Pre-Installation test and calibration 3. 2 Years Operational Spares List (by
10. Prepare Risk Assessments for all check Project)
Project Document
related activities 11. PSV test and certification 4. Procure Operation Spares (By
completion for facility
11. Prepare preservation plan and 12. Cable insulation and continuity test Operation)
handover to Operation :
Procedure 13. Tubing Leak test
1. Completion of as built
14. Instrument Installation check PSSR :
documentation
FAT : 15. Electrical Installation check 1. Audit, Site survey for Start-up
2. Completion of project
1. FAT at vendor’s shop 16. Civil construction completion Readiness
documentation
2. Release IRN 17. Safety Equipment installation check 2. Follow Up Recommendation
18. Perform preservation 3. PSSR Sign off for Start-up Approval
Punchlist “C” Closing
Operation Readiness :
(By Project)
1. Identify Training Required Punchlist “A” Closing
2. Identify Operation Spares
3. Develop Operating and Maintenance
Manual

Project (Commissioning Operation Project (Commissioning and Project (Construction) : Responsible Project (Commissioning) : Project (Commissioning and Project (Commissioning) : Provide Operation : Responsible
Responsibility

Readiness) : Operation Readiness) : for all fabrication and Installation until Responsible for all Pre-commissioning Operation readiness) : startup assistance and complete for operation and
Responsible for Commissioning Responsible for all Commissioning Mechanical Completion achieved work Responsible for all commissioning performance test. With engineering, maintenance
Planning Engineering work Project QA/QC : Witness Operation : Witness and Review work commissioning shall resolve non
Responsible for Operation Readiness Responsible for Operation Readiness Project (Commissioning) : Review Responsible for Operation readiness performance if required Project : Complete
Planning preparation and execution and approve Mechanical Completion execution Operation : Responsible for startup, handover document
Project (Construction) : Responsible Operation : approve performance required for final Handover
for Mechanical Completion preparation Witness and review commissioning,
Procure Spare Part for 2 years
operation

Commissioning and startup Plan, Commissioning Execution Plan, Construction Report, Pre-Commissioning Report (“B” Check Commissioning Report, Operational Report, Complete project
Operation Readiness Plan, Commissioning Procedure, Mechanical Completion Check and test Sheet), “C” Check Sheet, Performance Test Report. documentation,
O&M Strategy Commissioning schedule, sheet (“A” Check Sheet), Equipment Operation Manual Punch list B items closeD, As-Built drawing (or Red-
HCP, Mechanical completion punchlist, HCP Compilation, line markup for as built
Document

Spare part, tools, consumable List, FAT Report, Vendor (SAT/SIT) Report, drawing),
preservation plan and procedure, HCP Compilation PSSR Check Sheet and Sign off Minutes of handover
Risk Assessment, document,
Operation and Maintenance Plan 2 Years Operation Spares List,
Operations and Maintenance Manual,
Commissioning markup drawing,
Start-up Procedure
Performance Test Procedure
Certification

System Hand Over Plant Performance Facility / Final


Mechanical Handover
for Startup (SH1) Certificate
Completion
(PP1)
Certificate (MC1)

Place In
Service (PIS)