Professional Documents
Culture Documents
E01A
I13A Electrical
Instrument
P09A Piping
M05A Mechanical
Mechanical
Fire & Gas Detectors
Mechanical
Mechanical Completions
Completions
Completion
Installation Cables
/ Inspection
Hot Oil
Metering Flushing
Pump
(Voltage)
ITRs – BITR
Sheet Discipline
Status Report : Piping
Electrical
Mechanical
Instrument
E29B
I29B
M17B
P07B Instruments
Electrical
Mechanical
Piping
Pre-VCS/PCS/ESD
PrePre-Commissioning
System
Commissioning
Commissioning
Electric
Logic
Manual & Heater
Interface
Check Test
Hoist
Installation
Construction Pre-Commissioning Commissioning Prep. for Start-Up Start-Up & Performance Operations
Testing
Example Activities: Example Activities: Example Activities: Example Activities: Example Activities:
Walk Systems Walk Systems Walk Systems Independent Project Commence Operations
Prepare Punchlist Update Punchlist Update Punchlist Review and Stabilisation
Cleaning/Draining N2/He Leak Testing
I&E Operational Readiness Field Performance Test
Flushing of Lube/Seal Oil Drying
Review (against agreed
Polarity Checks Systems Purging
acceptance criteria)
Loop Continuity Check Energising Equipment Loading Fuel Start-up Readiness
Cable Meggar Testing Motor no-load Complete Commissioning Review Correct Operational
Final Equipment Alignment Procedure Runs Deficiencies
Mechanical Fuel gas Pressurisation of
F&G, ESD Cause and Effect
Plant
Rotating Equipment Testing
MCC: Mechanical Completions Certificate
Installation and Cold Loop & Function Testing Process levels finalised PCC: Pre-Commissioning Completion Certificate
Alignment Panel/Switchgear Function PCN: Pre-Commissioning Completion Notice – TCCC
CCC: Commissioning Completion Certificate
Test CCN: Commissioning Completion Notice – TCCC
Piping and Vessels Control system Interface AC: Acceptance Certificate
AN: Acceptance Notice – TCCC
Pressure Testing Testing TCCC: Transfer of Care, Custody and Control
NDT Complete “B” Checksheets
Vessel internal Update & Complete “A” Complete “C”
Complete “B” Punchlist
Inspections Punchlist Punchlist Items
Issue CCC
Complete “A” Issue PCC
AC
Checksheets System PCC System CCC
Complete “A” Punchlist
AC
Issue MCC
Disc Sub System System System PCN System CCN
MCC MCC MCC
• Discipline Read/Only
• Clerk Certs Update status and Print
• Certification Read/Write
• Super User R/W and Update Users
• Asset Administrator Full Access
View
CCMS
GoCCMSProject
Support
MessageHome
Centre
Page
Login Screen
Message Area
Certification for Communications
and Completions from your System
Management
QEDi Focal Point
Module
CCMS Construction
- HookUp
Menu Page
Menu Selection
Main Menu Items
The
Page View List
buttons: Firstbutton
Page will show all
, Previous returned
Page tags,
, Next Page and
Last Page , the
removing or by clicking
need on thenavigation
for page page number
andin allowing
the bottomthe
left of
theuser
list table, entering
to scroll up andthe page
down. number to view, and pressing return
key.
Data Hierarchy
Gives colour
coded visual
representation of
current data held
per system and
subsystem. Also
related Parent
Tagging, Loops,
ITR & Tag
This area provides a Tree- structured overview of all systems within a project, colour
information.
coded
Basic for ease of identifying outstanding work. Green=Complete, Red=Incomplete,
changes
Blue=No
can ITRs assigned. Breakdown is viewed by sub-system, loops & parent tags. Basic
be achieved
inadmin canofbe done is this area. (Users with permissions only)
this area
Database (Admin
users only)