You are on page 1of 11

CCMS Course - One Day Read-Only

Introduction

Safety and Housekeeping


Fire alarm and escape routes
Muster Points
Safety Moment
Toilets
Breaks
Mobile phones
Attendance sheet
Handouts

Who’s Who & Why are you here?


Course Registration

• Sign Attendance Sheet

• Complete Training Registration Form


• Uses of Registration :-
• Entry to Competency Matrix
• Tracks your progress
• Keeps you up to date with developments
• Reminder when a 3-year refresher is due
• Please write LEGIBLY
• Please notify Training Co-ordinator of changes in
contact details
GOCTraining@qed-i.com
• Any Questions?
AGENDA
• Technical Integrity
• Schematic Drawings
• ITRs – Inspection & Test Records
GoCCMS Database
• Log On Page
• System Navigation

 Module Construction

Hook-Up

Commissioning

Management Report
• Support Services
• Course Summary
OBJECTIVES

 Placing your role within the


completions process and its importance
within a Plant or Project.
 Understand the functionality and
navigation of CCMS Database
 Understand documentation and its
importance to Completions
 Achieve a level of Competency to
fulfil tasks required within your project
team
Technical Integrity (TI)

The Condition of a PLANT that Safely meets its Design


Criteria and Intended Purpose.

Where a Deviation from these exist they have been


Identified and Assessed and any Changes necessary to
ensure continued safe, efficient operation have been
implemented.
Technical Integrity
Engineering (TIE)

The condition of a PLANT that meets its Design Criteria and


Intended Purpose.
As defined in the AFC Deliverables and applied through all stages.
Demonstrated by Auditable Records,
From Inspection Test Records (ITR), Inspection & Test Procedures,
Check sheets etc, MC1, SH1 through to PP1
Where deviation from these exist
Change request raised, MOC, EQ, TQ, FCN’s etc…..

They have been Identified and Assessed and any changes necessary to
ensure continued Safe, Efficient Operation have been Implemented.
Design Authority reviews, approves and reissues for use
Technical Integrity (TI)

Technical Integrity needs to be demonstrated by


ITRs
(It is a Legal Requirement)
• Conducted to Procedure
• By Competent and Authorised people
Technical Integrity (TI)

Everyone has a Responsibility to maintain TI


(at all times)

The requirement for TI can vary with time


(A pipe may be without lagging in the summer but not in winter)
Typical Plant Layout
HP
FLARE
GAS
LIFT

GAS
EXPORT

ASC

ASC
GAS
INJ.

TEG
PLANT

HP
FLARE

ASC

HP

FLARE

LP
FLARE

LIQUID
TEST EXPORT
SEPARATOR
Main Equipment Identified into Sub-System
HP
FLARE
GAS
LIFT

GAS
EXPORT

ASC

ASC
GAS
INJ.

TEG
PLANT

HP
FLARE

ASC
HP

FLARE

LP
FLARE

LIQUID
TEST EXPORT
SEPARATOR