Professional Documents
Culture Documents
Acm 6
Acm 6
This is a somewhat long-winded method of saying that the control subsystem relies on criticism to accomplish its motivation
and capacity effectively, and that this feedback results from the system overall working upon and inside its current
circumstance. Notice likewise that the fascinating properties of a framework equipped for keeping up with some predictable
activity upon its current circumstance are truly communicated by that framework's control subsystem. Along these lines, it
could be feasible to overlook subtleties of a framework and manage the control subsystem when displaying the nature of its
exhibition per. [16]
The implement, execute or act' component corresponds to the control output of the control subsystem: a mechanism
designed to bring about the required outcome is activated. Finally, the evaluate component corresponds to the `measure
performance' of the control subsystem, where measures are taken in order to find out whether the intended outcome was
achieved. In particular, the development methodology of e-learning will focus upon analysis, design, production and
evaluation processes. These ideas can also be extended to provide for the specification of e-learning, and for the methods
of management of such e-learning. In particular, attention is given to ensuring the e-learning contains elements which aid
evaluation, and that the management of the e-learning involves review and reflection. [16]