Match the terms wish the defini?on
1. Direct Conversion q. Changing from an old to a new system by termina?ng the old
when the new is introduced.
2. Conceptual design a.Requrement Specifica?ons for systems output, data storage,
specifica?ons. input, processing pro-cedures and opra?ons.
3. Scheduled Report c. Output prepared on a regular basis, with a
pre-speci?ed content and format
4. Accceptarice Test o. Output with pre-specified content and
formal DreDared in response to aonorma
5. Post implementa?on u. Review of new system after operating for a brief period to
Review ensure it meets planned objectives and to review system controls
6. processing test data n. Processing valid and erroneous transactions to see if a
program operates as designed and errors are detected and
corrected
7. pilot conversion t. Implementing a new system in one location, resolving its
problems, and then implementing it in the rest of the organization
8. program maintenance i. Updating a computer program due to changed user needs,
fixing bugs, or legal or regulatory changes
9. structured g. Modular programming approach; each module performs
programming specific function and is coordinated by a control module
10. post implementation v. Report that analyzes a new system to determine if it achieved
review its intended purpose
11. demand report f. Output with a pre-specified content and format; prepared only
conversion on request
12. parallel r. Changing from an old to a new system by operating both
simultaneously until confident the new system functions correctly
13. walk-throughs m. Step-by-step reviews of program logic to find incorrect logic,
errors, omissions, or other problems
14. physical systems j. Summarizes what was accomplished in physical design; used to
design report determine whether to proceed to implementation
15. phase-in conversion s. Gradually replacing elements in an old system with new
elements until the old system is replaced
16. triggered exception e. Output with pre-specified content and format; prepared in
report response to abnormal conditions
17. systems k. Process of installing hardware and software and getting the IS
implementation up and running
18. special-purpose d. Output with no pre-specified content, format, or schedule;
analysis report usually prepared at management request
19. implementation plan l. Written plan showing how new system will be implemented and
when the project is complete and the IS operational
20. debugging h. Process of discovering and eliminating program errors