ELECTRO MECHANICS LLC

MATERIAL REQUISITION
Requisition No: EM-HSE-05 MJ √ EJ √ Project Name / No. Construction of Lulu at Al-amerat, EJ-1710; MJ-1707 Date : 8-Oct-18

Required Remarks /
SI.NO DESCRIPTION MAKE/ MODEL .NO MAS No. Quantity Unit
Before Action
Last issue:
1 Safety Shoe- High ankle- Size: 43. Delta plus- SAGA 3 SRC Pair 1 10-Oct-18
Apr-2016
2 A3 Lamination Sheet Box 1 9-Oct-18

3 A4 Lamination Sheet Box 1 9-Oct-18

4 First aid Items

a Plaster (Water proof) Box 4

b Dettol- 100 ml Bottle 3

c Panadol Box 4

d Cool Pack No 1 9-Oct-18

e Pain relief spray No 2

f Antiseptic Cream No 2

g Alcohol Pad Box 1

5 Cello Tape- 4 inch roll 2

6 Warning Tape- RED/ WHITE roll 10

To Be Delivered At: Al Sarooj Office. Contact Person: Mohammed Al Zadjali- 95599647

Requested by: Checked by: Approved by:

Mr. Mohammed Al Zadjali Mr. Abdul Rasheed- HSE Manager Mr. Edy Slim

EM-QMS-F028; Rev.1
ELECTRO MECHANICS LLC
MATERIAL REQUISITION
Requisition No: EM-HSE-MR-01 MJ √ EJ √ Project Name / No. Construction of Lulu at Al-amerat, EJ-1710; MJ-1707 Date : 22-Mar-18

Required Remarks /
SI.NO DESCRIPTION MAKE/ MODEL .NO MAS No. Quantity Unit
Before Action
Need to transfer
1 Portable fire extinguishers 5 No's
from Barka site
Available at Ghala
2 Full body harness- Double Hook 30 No's
store.
Need to transfer
3 Notice boards 2 No's
from Barka site
Need to transfer
4 Drip Tray 4 No's
from Barka site
Need to transfer
5 Skip bins 4 No's
from Barka site
Need to transfer
6 Fabricated tables/ Chair (2 Table, 4 Chairs) 2 Set
from Barka site

To Be Delivered At: Lulu Al-amerat Project Contact Person: Mr. Mohammed Al Zadjali- 9559947

Requested by: Checked by: Approved by:

Mohammed Al Zadjali- HSE Officer Abdul Rasheed- HSE Manager

EM-QMS-F028; Rev.1
ELECTRO MECHANICS LLC
MATERIAL REQUISITION
Requisition No: MJ EJ √ Project Name / No. Date : 7-Oct-18

Required Remarks /
SI.NO DESCRIPTION MAKE/ MODEL .NO MAS No. Quantity Unit
Before Action

1 Fire retardant Coverall Nomex- Dupond No 2 7-Oct-18

2 Safety Shoe- High ankle Delta plus- SAGA 3 SRC Pair 1 7-Oct-18

(For PDO Site Visit- Mr. Lloyd- Electrical Project Manager)

To Be Delivered At: Al Sarooj Office. Contact Person: Abdul Rasheed- 94249226

Requested by: Checked by: Approved by:

Mr. Llyod- Project manager Abdul Rasheed- HSE Manager

EM-QMS-F028; Rev.1