You are on page 1of 2

SAM ENGINEERING / ELECTRO MECHANICS

Material Incoming Inspection Form


Project Code: Date of Supply:
Project Location: Supplier Details:
MR Number:
Description Reason for
No. LPO.No RN.No DO No./ Date Quantity Unit Accepted Rejected
of Materials Rejection
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Please Inspect the Products Against the following attributes: Items Inspected and Accepted into Stock:
1. Physical damages; 2. Requirement for any test / batch certificate;
3. Safety & Storage Instructions; 4. Packaging along with any spares & tools; 5. Quantity of Project Engineer:
the product delivered; 6. Shelf Life & any other product specific attributes; 7. Any Customer / Date:
Consultant specified instructions.

IMS-SEEM-F145, Rev.0
Please Inspect the Products Against the following attributes:
1. Physical damages; 2. Requirement for any test / batch certificate;
3. Safety & Storage Instructions; 4. Packaging along with any spares & tools; 5. Quantity of
the product delivered; 6. Shelf Life & any other product specific attributes; 7. Any Customer /
Consultant specified instructions. Signature: