Project Name: Umm Wu’al Phosphate Project 000 509 F02301

Contract Number: 14-KB-075


Project Location: In-Kingdom

RECEIVING INSPECTION CHECKLIST Report No.


Tag Description: Tag No.:
P. O. No.: Inspection Classification Turnover System:
PMC/
Subcontractor: GAC   Sub – System:
MPC
MMAH  Other  Location:
Supplier Date Received Project Number

Receiving Hold Tag Attached Mark No. Heat No. Material Test Reports Required
 Yes  No  Yes  No Item #'S _______
Description Of Material/Equipment

Item No. Inspection Attributes* Quantity Accept Reject Hold Tag No.

Nonconformance Report Number(s)

Storage Requirements

Remarks

* Inspection Attributes are identified an Attachment 1 for certain items

Prepared By/Date Inspector/Date