1. Excavation cleared of foreign and loose material.
2. Slopes shored or correctly stepped.
3. Fill Material cleans and conforms to requirements.
4. Lift thickness and compaction procedures in accordance with specifications. 5. Final elevation in accordance to drawings. 6. Moisture control acceptable.