: MKN-QC-007
Witness Insp. of Welding / NDE - UT, PT Insulation and Lagging Final Inspection
Leak Test Blasting Inspection Packing/Pre-Shipping Inspection
Hydrostatic Test Cutting Plan Bolt torquing
Place of Inspection : Smelter Ma'aden
Location of Material : Mechanical
Ma'aden Aluminum Co. Others Electrical
Civil
Blasting Area Architectural
Painting Area Others (Specify)
Workshop Area
REQUESTED BY :
Incharge for this Inspection : Md Ashif Wahab
10
Signature:
17-May-18
Straightening
Top Coat
Time: 9am
Time:
Result of Inspection
Hold/Confirmation
Witness Insp. of Welding / NDE - UT, PT Insulation and Lagging Final Inspection
Leak Test Blasting Inspection Packing/Pre-Shipping Inspection
Hydrostatic Test Cutting Plan Bolt torquing
Place of Inspection : Smelter Ma'aden
Location of Material : Mechanical
Ma'aden Aluminum Co. Others Electrical
Civil
Blasting Area Architectural
Painting Area Others (Specify)
Workshop Area
REQUESTED BY :
Incharge for this Inspection : Md Ashif Wahab
10
Signature:
Date Inspected:
REQUESTED BY :
Incharge for this Inspection : Bolkiah Rasuman
PLAN MATERIAL SUBJECT FOR INSPECTION Plan Inspection Date: 4-Apr-19 Time: 13:00
Date Inspected : Time:
Result of Inspection
No. Description Inspection type Q'ty Proceed to Next
Step of To Be Repair Hold/Confirmation
Work
1 Light Service Walkway Platform No.1 Final Dimensional & Visual Inspection 1
10
Signature:
REQUESTED BY :
Incharge for this Inspection : Bolkiah Rasuman
PLAN MATERIAL SUBJECT FOR INSPECTION Plan Inspection Date: 4-Apr-19 Time: 13:00
Date Inspected : Time:
Result of Inspection
No. Description Inspection type Q'ty Proceed to Next
Step of To Be Repair Hold/Confirmation
Work
10
Signature:
REQUESTED BY :
Incharge for this Inspection :
10
Signature:
8-Mar-19
Straightening
Top Coat
Time:
Result of Inspection
Hold/Confirmation