The document is an inspection record for static equipment for the Umm Wu'al Phosphate Project. It lists 18 items to verify for the static equipment, including verifying nameplate data, preservation integrity, foundation and bolts meet requirements, installation tolerances, grouting, internals are correctly installed, shipping devices removed, instruments are installed correctly, alignments of piping connections, coating system meets requirements, insulation meets specifications, and internal cleanliness prior to closing. The inspector signs off on verifying each item.
The document is an inspection record for static equipment for the Umm Wu'al Phosphate Project. It lists 18 items to verify for the static equipment, including verifying nameplate data, preservation integrity, foundation and bolts meet requirements, installation tolerances, grouting, internals are correctly installed, shipping devices removed, instruments are installed correctly, alignments of piping connections, coating system meets requirements, insulation meets specifications, and internal cleanliness prior to closing. The inspector signs off on verifying each item.
The document is an inspection record for static equipment for the Umm Wu'al Phosphate Project. It lists 18 items to verify for the static equipment, including verifying nameplate data, preservation integrity, foundation and bolts meet requirements, installation tolerances, grouting, internals are correctly installed, shipping devices removed, instruments are installed correctly, alignments of piping connections, coating system meets requirements, insulation meets specifications, and internal cleanliness prior to closing. The inspector signs off on verifying each item.
Tag Description: Tag No.: P. O. No.: Inspection Classification Turnover System: Contractor: GAC GAC MPC Sub – System: Work Package: PMC Other Location:
Subject GAC PMC
1. Verify nameplate data meets description. 2. Verify preservation integrity (if applicable). 3. Verify foundation and foundation bolts meet specified requirements. 4. Verify installation tolerances have been met. 5. Verify grouting meet specifications. 6. Verify all internals are correctly installed. 7. Verify all shipping devices have been removed. 8. Verify all vents, drains, and instruments con. etc. are installed in ACC. with equipment trim isometrics. 9. Verify alignments of piping connections are correct. 10. Verify coating system meets specified requirements. 11. Verify insulation meets specified equipment. 12. Verify prior to final closing for internal cleanliness. 13. Verify all ladders, platforms, stairways and walkways on correctly installed. 14. Orientation correct 15. Correct shimming installed 16. Tightness of anchor bolts nuts 17. Grouting completed 18. Sliding plate free (for horizontal vessels only ) & lubricated 19. Trays/down comers/support rings 20. Davits installed (Where applicable ) 21. Ready for closure 22. Closure certificate signed GAC PMC VENDOR MPC Name