You are on page 1of 20

carried before backfilling &

repairs and Records available?


Record of Pipeline cover
available?
2.7 Whether the pipeline has been
hydrostatically tested.
Hydrotest Pressure In Kg / Cm2
Period of Hold Details of sections
with test pressures to be provided.
Records to be made available.
2.8 Type of Sectionalizing Valves
used Page 3 of 24 on the pipeline.
2.9 Whether the pigging facility has
been installed and the pipeline is
piggable by scraper pig.
2.10 Whether the gauging pig was
passed through the pipeline to
prove its internal diameter and was
it satisfactory. Detail Records
available?
2.11 Whether EGP was carried out for
the pipeline. Details to be
provided.
Date of EGP, Findings of EGP,
Dent size and no (if any) or other
defects and date of repair and
records there to?
2.12 Whether the pipe and welding
book has been prepared and made
available
2.13 Whether anti surge devices have
been installed, if applicable and
details thereof.
2.14 Whether the pipeline has been
cleaned and swabbed.
2.15 Whether pipeline has been
preserved after hydrotesting? If so
medium of preservation?
2.16 Whether adequate water and
product is available for
commissioning.
2.17 Whether mechanical completion
report for the pipeline is available.
2.18 Whether ROU restoration is
completed and records available?
- NOC from NH / SH/ Railways
and other statutory authorities
obtained?
2.19 Whether following approvals have
been obtained for pipeline before
construction?
- PESO (CCOE) approval for
laying of pipeline / construction of
facilities( Ref no and Date.
- DGMS approval for laying of
pipeline / construction of
facilities ( Ref. no & Date)
- In case of off-shore pipeline
CRZ Clearance?
- Environmental clearance for the
project ( No & date)
- Sate Pollution control Board –
consent to establish
- Registration of establishment
from Central / State Govt. Labour
commissioner under
Contract Labour ( Regulation
and Abolition ) Act’1970.
- Permission from Irrigation /
PWD authority / NHA etc.
2.20 Whether commissioning procedure
is available and all requirement
indicated therein are available
including pig cups / mandrels.
Planning for Disposal of water
made?
2.21 Whether following Clearances
obtained before commissioning?
- Commissioning clearances from
PESO(CCOE).
- CCOE License as required.
- Consent for operation from
state pollution control board for
Air and Water.
- Clearance for frequency
allocation for operation of HF /
VHF system from Ministry of
Communication & IT Dept of
Telecom.
- Factory License as required.
2.22 Whether Line Patrol Man
Deployed?
KM of pipeline covered per
Patrolman?
2.23 Off-site DMP prepared and
submitted to respective DMs / DCs
2.24 Whether pre-tested Insurance
Stock pipes earmarked and kept
separately? Indicate Details of size
and length.
2.25 Whether leak clamps are available
at Maintenance base? No. of
Clamps, Size and Location to be
indicated?
2.26 Whether Emergency tools and
tackles identified and available at
the stations? Attach a list of tools
and tackles.
3 COATING AND CATHODIC PROTECTION DETAILS
3.1 Type of External Coating used in
the Pipeline
(CTE / 3LPE/ FBE / Other)
Thickness in mm
3.2 Frequency of pill Test carried out
at the field and at the coating
plant?
Minimum & maximum pill test
data For Plant At the Field
3.3 Whether the pipeline is adequately
protected cathodically as per the
requirements of OISD standard.
(Check availability of design
parameters). Indicate TRU details /
current capacity.
Presently protected by TCP (
Temporary Cathodic Protection) /
PCP ( Permanent Cathodic
Protection)
Expected date of Comm. Of PCP
in case the pipeline is presently
protected by TCP.
3.4 No. of TLP ( Test Lead Points /
Test stations) installed along the
pipeline Route
3.5 Post Construction Coating Survey
carried out or not?
No. of Defects detected?
No. of repairs made?
3.6 Whether Interference survey for
the pipeline has been carried out
carried out and mitigation
measures taken.
Location / Chainage/ Type of
Mitigation measures taken.
3.7 Whether IJs have been provided at
all transitions of underground
piping to aboveground piping and
whether the integrity of IJs have
been checked.
3.8 Whether electrical Surge diverter
provided across IJs?
Whether zinc grounding cell / kirk
cell / solid state device have been
provided across IJs on the
protected side?
Whether Earthing provided across
IJ on the unprotected side?
3.9 Whether corrosion coupons have
been installed for internal
corrosion monitoring?
3.10 Whether all cased crossings have
been checked and are free from
any electrical shorting. Records to
be made available?
3.11 Whether PSP readings for entire
pipeline taken?
Date of Readings PSP Profile
document to be made available.
3.12 Whether Natural PSP of the
Pipeline has been taken? Date of
reading? Record to be made
available
3.13 Whether ON PSP readings taken
after commissioning of PCP? Date
of Reading?
Record to be made available?
3.14 Whether OFF PSP readings taken
after commissioning of PCP? Date
of Reading?
Record to be made available?
4 LOCATION DETAILS: FOR EACH STATION SEPARATE CHECKLIST TO BE
FILLED. IN CASE ANY PARTICULAR ITEM IS NOT APPLICABLE PLEASE
INDICATE “NA”.
ORIGINATING PUMP / COMPRESSOR / INTERMEDIATE DELIVERY OR TAP OFF /
INTERMEDIATE PUMP OR COMPRESSOR / INTERMEDIATE PUMP OR
COMPRESSOR CUM DELIVERY / TERMINAL STATION:
4.1 Name of location and Chainage
LAND
a) Total land area in m2
b) Licensed Area in m2
c) De licensed Area in m2
4.2 NEAREST FACILITIES
a) Fire station
b) Police Station
c) Hospital / Medical Facilities
d) Major Industry (if any)
4.3 LAYOUT/POWER/ COMMUNICATION
4.3.1 Does the plant layout conform to
OISD-STD-118 / 141/ 214 / 226
and the inter-unit / intra-unit
distances are fully met? Annexure-
1 to be furnished highlighting the
inter distances vis-àvis OISD
requirements.
4.3.2 Whether proper arrangement of
roads is provided around the pump
house & manifold area for
movement of fire fighting vehicles
4.3.3 Power System Details:
i) Transformer Rating & Type
ii) HT Breaker Type & Rating
iii) DG Set’s Details
4.3.4 Details of Booster / Main Prime
movers of Pumps / Compressors
(a) Type of prime mover (
engine/ Motor / Gas Turbine)
(b) Power rating
(c) Type of Fuel for Engine/ GT
(d) VFD(if any) provided
(e) Motor / Engine / GT safety
protection system.
(f) Specific fuel / power
consumption
4.3.5 Details of PUMPs /
COMPRESSORS
(a) Diff. Head
(b) Shut off Head
(c) Flow rate - maximum
(d) Minimum Continuous flow
(e) Pump safety protection
instrumentation
(f) Power in HP / KW
4.3.6 Details of above ground and under
grounds storage capacity at the
stations product class wise.
4.3.7 Communication system details
(i) Telephones
(ii) PA/Paging
(iii) VHF
(iv) Walkie/Talkie
(v) Hot Line
(vi) VCS
(vii) CCTV
4.4 STATUTORY APPROVALS / DOCUMENTATION
4.4.1 Whether following approvals have
been obtained for Stations before
construction.
- PESO (CCOE) approval for
construction of facilities( Ref no
and Date). Copy of the approved
layout to be attached.
- DGMS approval for laying of
pipeline / construction of
facilities ( Ref. no & Date)
- Environmental clearance for the
project ( No & date)
- Sate Pollution control Board –
consent to establish
- Registration of establishment
from Central / State Govt. labour
commissioner under Contract
Labour (Regulation and Abolition)
Act’1970.
4.4.2 Whether following licenses /
approvals are available before
commissioning?
- CCOE License No. , Date,
validity.
- Is there any change in layout with
respect approved CCOE layout?
- NOC from District Magistrate /
District Collector in case CCOE
License is not applicable.
- Factory License / DGMS
approval
- Consent for Operation from State
Pollution Control Board for:-
i) Air
ii) Water
- HF / VHF license & validity
- Govt. Notification for protected
area
declaration
- Clearance from CEA / State
Electrical Inspectorate.
- DG Set Installation approval
- Any other applicable statutory
license / approval
4.4.3 Whether following Licenses
manuals / standards / documents
are available at site.
a) Copy of all Statutory Licenses
b) Copy of approved as built
CCOE
Layout clearly marking fire water
networks, monitors, hydrants etc.
c) Petroleum Acts & Rules.
d) The Petroleum pipelines
(acquisition of right of users in
land) Act 1962, amended in
1972
e) EPA 1986 and rules
f) Mines / Factory Act / Rules
g) Indian Electricity Act / Rules
h) Weights & Measure Act/Rules
i) Operation manual including
Start-up, Shut-down and
Emergency handling procedures.
j) Maintenance Manual
k) Safety manual
l) OISD Standards and other
documents as specified in
OISD STD- 141 / 214 /226
m) Codes to which the pipeline has
been designed, constructed and
maintained.
n) Equipment Manufacturer's
Manual for all equipment.
o) Calibration chart of storage
tanks
/ sump tank
p) Land ownership documents
including NA conversion.
q) Approved as built P&IDs and
facility drawings.
r) Latest approved design basis.
s) Documents related to electrical
relay setting and testing.
t) ON SITE and OFF-SITE
approved DMP.
u) Material Safety Data Sheet
4.5 FIRE PROTECTION SYSTEM/FACILITIES / PLAN
4.5.1 Whether Fire Protection System /
facility comply with OISD-STD-
117/ 141/ 214 / 226. Deviation, if
any, to be given. Attach a copy of
fire water calculation as per the
requirements of relevant OISD-
Standard as Annexure-2.
4.5.2 Whether firefighting equipments /
Personnel Protective Equipment
(PPE) are provided as per the
requirements of OISD-STD- 117 /
141/ 214 / 216. Attach a list of
such equipment available at site
vis-à-vis
OISD requirement as Annexure-3.
Please indicate area of each
facility.
4.5.3 Whether fire hydrant system has
been designed as per OISD-STD-
117. Mention no. of Monitors,
Hydrants etc.
4.5.4 Whether Clean Agent System
provided for Control Room?
If so whether the system has been
checked?
Records to be made available.
4.5.5 Whether HAZOP Risk analysis of
the facility have been carried out
& the recommendations
implemented.
4.5.6 Whether On-site Disaster
Management Plan prepared and
approved by Factory Inspector? Is
the DMP submitted to local DM /
DCs for incorporation in their
DMP?
4.5.7 Whether list of contact persons has
been displayed with telephone
nos.!
4.5.8 Indicate the details of security
arrangement of the location.
4.5.9 Check availability of Visitor /
attendance Registers at the gate.
4.5.10 Check availability of metal
detector / mirror trolley.
4.6 PUMP / COMPRESSOR / TAPP OFF/ TERMINAL AREA
4.6.1 Whether oil water separator
system and plant surface drainage
system is properly separated.
4.6.2 Whether the drains/vents/sample
points have isolation valves and
are provided with caps!
4.6.3 Whether newly installed prime
movers ( Engine / Motors / GTs)
have been run on no load test. No
of Hours run? Test report to be
made available
4.6.4 Whether newly installed pumps /
Compressors have been inspected
for
alignment, flushing, direction of
rotation, strain due to piping,
tightness of foundation bolts,
lubrication, leakage from joints,
strainer cleanliness, etc., as per
OISD-STD-119 / 120 before
commissioning and records
maintained.
4.6.5 For newly installed compressors (
for gas
pipelines ) and pumps (for liquid
pipelines), whether following have
been checked:
a) Working condition of
- Vibration Monitoring System
- Anti Surge Device
- Speed Control System
- Shut Down System
- Lubrication System
b) Working condition of various
alarms / trips and signaling
systems.
c) Cleanliness of suction lube oil
strainer
d) Depressurising & venting
system of the compressor.
e) Whether the compressor has
nitrogen inerting system. if so, is it
functional.
4.7 STATION PIPING
4.7.1 Whether station piping has been
provided as per the latest approved
P&IDs.
Indicate drawing numbers. Attach
a as built copy of drawings?
4.7.2 Whether mechanical completion
certificate for the station is
available?
4.7.3 Whether pipe supports (sliding /
spring supports) guides and
anchors are in order.
4.7.4 Does the piping slope towards
drain points/knockout pots?
4.7.5 Whether all the flange connections
has been checked for tightness and
length of bolts are adequate. All
short bolting have been checked?
4.7.6 Whether pipelines have been
painted & separate colour has been
provided for different services as
per Industry practice or colour
code of pipelines IS: 2379-
1990”.
4.7.7 Whether flow direction has been
marked on station piping and
equipment.
4.7.8 Whether proper direction for check
valves and flow meters has been
ensured.
4.7.9 Whether all equipment /valves
have been numbered? Asset
Register Prepared.
4.7.10 Whether adequate crossovers for
crossing and platforms to operate
valves have been provided with
safety hand rails?
4.7.11 Whether check for scraper signal
has been done.
4.7.12 Whether access to all operating
equipments including vessels,
valves, sump pump, and scraper
barrel is adequate.
4.7.13 Whether CI dosing facilities with
adequate stock is available for
dosing in water and product.
4.7.14 Whether proper arrangement has
been made for drainage and
disposal of the water during
commissioning.
4.7.15 Whether calibration charts for all
storage tanks / sump tank are
available. Records
to be made available ?
4.7.16 Whether hydrotest of station
piping is carried out. Indicate
following data High Pr. Section /
Low Pr section
(a) Design Pressure
(b) Operating Pressure
(c) Hydrotest pressure
(d) Period of Hold
4.7.17 Whether air cleaning / card board
cleaning is done.
4.7.18 Whether pneumatic testing / leak
test for flanges/ tapings have been
completed and record maintained.
4.7.19 Whether alignment of motor with
main pump and suction / discharge
piping is
done and acceptable to the vendor
/ owner.
4.8 ELECTRICAL SYSTEMS & SUBSTATION & CP
4.8.1 Whether all equipment including
motors, fittings, lighting etc. are as
per hazard area classification
(OISD-STD-113).
4.8.2 Whether piping and static /
rotating equipments connected
with the earth grid?
4.8.3 Whether the motors are provided
with proper double earthing in line
with Indian Electricity Rules
(IER)?
4.8.4 Do earthing system and values
conform to clause no. 4.2 of
OISD-STD-173?
4.8.5 Whether earthing grid drawing is
available?
4.8.6 Latest reading of Earthpit
resistance with or without grid
available? Date of such readings.
4.8.7 Whether separate grid for
instrumentation and
telecommunication system made?
4.8.8 Whether unused opening in
trenches and substation covered?
4.8.9 Whether clear spacing is provided
in front and rear of the main panels
in line with
IER requirements?
4.8.10 Whether Cable entry / exit conduit
properly sealed? Rodent repeller
installed below false flooring?
4.8.11 Whether proper ventilation is
provided for the room for battery
charging and whether walls and
floors are acid proof. Type of
Battery used?
4.8.12 Whether emergency lights are
provided in sub-station and switch
room, DG set room.
4.8.13 Whether tags for proper
identification of cables and
switches is provided at Sub-
Station / control room.
Whether Intermediate cable tags
have been provided? If so at what
Interval?
4.8.14 Whether the electrical siren can be
operated when AC supply is not
available
4.8.15 Whether all protective relays of
Incomer, Transformer and
PCC/MCC panels tested and
records documented.
4.8.16 Whether Station piping is
protected by CP system? If so
reading of ON / OFF
PSP value.
4.8.17 Whether the CP system has
reliable power supply.
4.8.18 Whether as built drawings for
HT/LT/Pumps etc. are available.
Indicate drawing numbers.
4.8.19 Whether smoke detectors are
installed in Elect. Sub Station?
4.8.20 Whether fire alarm system is
provided in Control room /
Substation etc. and details
available in control room.
4.8.21 Whether Electrical Jumpers have
been provided across all flanges in
LPG and ATF services?
4.9 SAFETY DEVICES
4.9.1 Whether safety inter-locks have
been provided as per OISD
requirements, tested and
documented! Major safety
interlocks be mentioned. Indicate
alarms and trip details.
4.9.2 Whether the relief valves have
been set at 10% over normal
operating pressure.
Indicate Operating Pressure and
set pressure in Kg / Cm2.
4.9.3 Whether thermal safety valves
have been installed directly on the
protecting equipments / on the
connected pipings with lock open
isolation valve. Indicate
set pressure of the thermal safety
valves?
4.9.4 Whether the thermal safety valves
have been calibrated and kept
locked open.
Calibration certificate to be made
available?
4.9.5 Whether tag nos. are displayed
clearly on thermal safety valve
body / Pressure gauges / flow
meters / PTs/ TTs etc?
4.9.6 Whether SCADA and APPS
System is available. Data of
SCADA including server details /
RTUs /APPS system / Whether
Leak detection to be provided?
If so, threshold limit of the leak
detection system to be indicated.
4.9.7 Whether leak detection has been
checked and meet the design
requirement at actual site
condition?
4.9.8 Whether indication of three phase
power is available in control room.
4.9.9 Whether factory test data for all
instrumentation system is available
4.9.10 Whether Instrumentation control
loop checking have been
completed?
4.9.11 MOVs which are on remote
operation have been functionally
checked for opening and closing
operation?
4.9.12 Whether ESD system has been
operated and checked for closure /
shut down of the facilities as
envisaged and record maintained.
4.9.13 Whether operation Logic (as
envisaged in design) has been
functionally checked ?
5 INTERMIDIATE PIGGING STATION / LOOP LINE TERMINAL
5.1 Name of location and Chainage
LAND
a) Total land area in m2
b) Licensed Area in m2
c) De licensed Area in m2
5.2 NEAREST FACILITIES
a) Fire station
b) Police Station
e) Hospital / Medical Facilities
f) Major Industry (if any)
5.3 LAYOUT/POWER/ COMMUNICATION
5.3.1 Does the plant layout conform to
OISD-STD-118 / 141/ 214 / 226
and the inter-unit/intra-unit
distances are
fully met? Annexure-1 to be
furnished highlighting the inter
distances vis-àvis OISD
requirements.
5.3.2 Whether proper arrangement of
roads is provided around the
Station for movement of fire
fighting vehicles
5.3.3 Power System Details:
iv) Transformer Rating & Type
v) HT Breaker Type & Rating
vi) DG Set’s Details
5.3.4 Details of Sump PUMPs / Thermo
Electric Generator
-Diff. Head
-Shut off Head
-Flow rate - maximum
-Minimum Continuous flow
-Pump safety protection
instrumentation
-Power in HP / KW
5.3.5 Details of above ground and under
grounds storage capacity at the
stations product class wise.
5.3.6 Communication system details
A. Telephones
B. PA/Paging
C. VHF
D. Walkie/Talkie
E. Hot Line
F. VCS
G. CCTV
5.4 STATUTORY APPROVALS / DOCUMENTATION
5.4.1 Whether following approvals have
been obtained for construction.
- PESO (CCOE) approval for
construction of facilities( Ref
no and Date).
- Copy of the approved layout to
be attached.
- Environmental clearance for the
project ( No & date)
- Sate Pollution control Board –
consent to establish
5.4.2 Whether following licenses /
approvals are available before
comissioining
- CCOE License No. , date,
validity.
- Is there any change with respect
to approved CCOE layout?
- NOC from District Magistrate /
District Collector in case CCOE
License is not applicable
- Govt. Notification for protected
area declaration
- Clearance from CEA / State
Electrical Inspectorate.
- DG Set Installation approval
- Any other applicable statutory
license / approval
5.5 FIRE PROTECTION SYSTEM/FACILITIES / PLAN
5.5.1 Whether firefighting equipment
are provided as per the
requirements of
OISD-STD-117 / 141/ 214 / 216.
Attach a list of such equipment
available at site vis-à-vis OISD
requirement as Annexure-3.
Indicate area of each facility.
5.5.2 Whether list of contact persons has
been displayed with telephone nos.
5.5.3 Indicate the details of security
arrangement of the location.
5.5.4 Check availability of Visitor /
attendance Registers at the gate.
5.6 STATION PIPING
5.6.1 Whether station piping has been
provided as per the latest approved
P&IDs. Indicate drawing numbers.
Attach as built copy of drawings
5.6.2 Whether mechanical completion
certificate for the station is
available?
5.6.3 Whether pipe supports (sliding /
spring supports) guides and
anchors are in order.
5.6.4 Does the piping slope towards
drain points/knockout pots?
5.6.5 Whether all the flange connections
has been checked for tightness and
length of bolts are adequate. All
short bolting have been checked?
5.6.6 Whether flow direction has been
marked on station piping and
equipment.
5.6.7 Whether proper direction for check
valves and flow meters has been
ensured.
5.6.8 Whether all equipment /valves
have been numbered? Asset
Register Prepared.
5.6.9 Whether adequate crossovers for
crossing and platforms to operate
valves have been provided with
safety hand rails?
5.6.10 Whether check for scraper signal
has been done.
5.6.11 Whether access to all operating
equipments including vessels,
valves, sump pump, scraper barrel
is adequate.
5.6.12 Whether CI dosing facilities with
adequate stock is available for
dosing in water and product.
5.6.13 Whether calibration charts for
sump tank are available. Records
to be made available?
5.6.14 Whether hydrotest of station
piping is carried out. Indicate
following data
High Pr. Section / Low Pr section
(e) Design Pressure
(f) Operating Pressure
(g) Hydrotest pressure
(h) Period of Hold
5.6.15 Whether air cleaning is done.
5.6.16 Whether pneumatic testing / leak
test for flanges/ tapings have been
completed and record maintained.
5.7 ELECTRICAL SYSTEMS & SUBSTATION & CP
5.7.1 Whether all equipment including
motors, fittings, lighting etc. are as
per hazard area classification
(OISD-STD-113).
5.7.2 Whether piping and static /
rotating equipments connected
with the earth grid?
5.7.3 Whether the motors are provided
with proper double earthing in line
with Indian
Electricity Rules (IER)?
5.7.4 Do earthing system and values
conform to clause no. 4.2 of
OISD-STD-173?
5.7.5 Whether earthing grid drawing is
available?
5.7.6 Latest reading of Earth pit
resistance with or without grid
available? Date of such readings.
5.7.7 Whether separate grid for
instrumentation and
telecommunication system made?
5.7.8 Whether unused opening in
trenches and substation covered?
5.7.9 Whether clear spacing is provided
in front and rear of the main panels
in line with IER requirements?
5.7.10 Whether Cable entry / exit conduit
properly sealed? Rodent repeller
installed below false flooring?
5.7.11 Whether proper ventilation is
provided for the room for battery
charging and whether walls and
floors are acid proof.
5.7.12 Whether emergency lights are
provided in sub-station and switch
room, DG set room.
5.7.13 Whether tags for proper
identification of cables and
switches is provided at Sub-
Station / control room.
Whether Intermediate cable tags
have been provided? If so at what
Interval?
5.7.14 Whether all protective relays of
Incomer, Transformer and
PCC/MCC panels tested and
documented.
5.7.15 Whether Station piping is
protected by CP system? If so
reading of ON / OFF PSP
5.7.16 Whether the CP system has
reliable power supply.
5.7.17 Whether as built drawings for
HT/LT/Pumps etc. are available.
Indicate drawing numbers.
5.7.18 Whether smoke detectors are
placed in cable trench and
substation?
5.7.19 Whether fire alarm system is
provided in Control room /
Substation etc. and details
available in control room.
5.7.20 Whether Electrical Jumpers have
been provided across all flanges?
5.8 SAFETY DEVICES
5.8.1 Whether thermal safety valves
have been installed directly on the
protecting
equipments / on the connected
pipings with lock open isolation
valve. Indicate set pressure of the
thermal safety valves?
5.8.2 Whether the thermal safety valves
have been calibrated and kept
locked open.
Calibration certificate to be made
available?
5.8.3 Whether tag nos. are displayed
clearly on thermal safety valve
body / Pressure gauges / flow
meters / PTs/ TTs etc?
5.8.4 Whether indication of three phase
power is available in control room.
5.8.5 Whether factory test data for all
instrumentation system is available
5.8.6 Whether Instrumentation control
loop checking have been
completed?
5.8.7 MOVs which are on remote
operation have been functionally
tested for opening and closing
operation?
5.8.8 Whether Vent lines have been
provided as per clause7.3 of
OISDSTD-
226 in case of NG pipeline
station
6 SECTIONALISING VALAVE STATIONS AND OR CP – REPEATER STATIONS
6.1 Name of location & Chainage
LAND
a) Total land area
6.2 NEAREST FACILITIES
a) Fire station
b) Police Station
6.3 LAYOUT/POWER/ COMMUNICATION
6.3.1 Power System Details:
i) Transformer Rating & Type
ii) DG Set’s Details
6.3.2 Communication system details
Telephones
6.4 STATUTORY APPROVALS / DOCUMENTATION
Whether following licenses /
approvals are available.
- Environment Pollution Consent
for:-
i) Air
ii) Water
- Consent for Operation form State
Pollution Control Board
- Govt. Notification for protected
area
declaration
- Clearance from Electrical
Authorities
- DG Set Installation approval
Any other applicable statutory
license / approval
6.5 ELECTRICAL SYSTEMS & SUBSTATION
6.5.1 Do earthing system and values
conform to item no. 4.2 of OISD-
STD- 173?
6.5.2 Whether earthing grid drawing is
available.
6.5.3 Whether piping and static /
rotating equipments connected
with the earth grid?
6.5.4 Whether clear spacing is provided
in front and rear of the main panels
in line with IER requirements?
6.5.5 Whether proper ventilation is
provided for the room for battery
charging and whether walls and
floors are acid proof.
6.5.6 Whether emergency lights are
provided in sub-station and switch
room, DG set room.
6.5.7 Whether tags for proper
identification of cables and
switches is provided at Sub-Station
/ control room.
6.5.8 Whether all protective relays of
Incomer, Transformer and
PCC/MCC panels tested and
documented.
6.5.9 Whether the CP system has
reliable power supply.
6.5.10 Whether fire alarm system is
provided
6.5.11 Whether Vent lines have been
provided as per clause7.3 of
OISD-STD-226 in case of NG
pipeline station

ANNEXURE -I
INTERDISTANCE & SAFETY DISTANCE BETWEEN FACILITIES :

Sl No Item Recommended Actual


In OISD-STD-118/
141/ 214 / 226
(Metres)
1. Booster pump / compressor House &
main Pump / compressor house

2. Control Room & Pump house

3. Fire Pump house to product pump house


4. Cold flare to compound wall
5. Water spray deluge to pump house

6. Electric substation to cold flare


7. Between tank farm & pump house

8. Between tank farm & Fire water Pump


house

9. Between pump house & sub.stn.

10. Between storage tanks & compound wall Dia of Tank

11. Between storage tanks & Dyke wall of Half the height
the tank.

12. Fire Water Hydrant/monitor & process 15


piping

ANNEXURE -Ii

FIRE WATER CALCULATION DETAILS AS PER REQUIREMENT OF RELEVANT


OISD STANDARDS (OISD–STD-117 / OISD-STD-141/ OISD-STD-214 / OISD-STD-226)