This document is a structural steel inspection checklist for the Umm Wu'al Phosphate Project located in Saudi Arabia. It lists 21 items to be inspected for foundations, anchor bolts, fit-up, bolts, and welding of structural steel. The checklist requires signatures from representatives of the general contractor GAC, project management consultant, subcontractors, and the mine operator Ma'aden Phosphate Company to confirm inspections and tests are completed.
This document is a structural steel inspection checklist for the Umm Wu'al Phosphate Project located in Saudi Arabia. It lists 21 items to be inspected for foundations, anchor bolts, fit-up, bolts, and welding of structural steel. The checklist requires signatures from representatives of the general contractor GAC, project management consultant, subcontractors, and the mine operator Ma'aden Phosphate Company to confirm inspections and tests are completed.
This document is a structural steel inspection checklist for the Umm Wu'al Phosphate Project located in Saudi Arabia. It lists 21 items to be inspected for foundations, anchor bolts, fit-up, bolts, and welding of structural steel. The checklist requires signatures from representatives of the general contractor GAC, project management consultant, subcontractors, and the mine operator Ma'aden Phosphate Company to confirm inspections and tests are completed.
Tag Description: Tag No.: P. O. No.: Inspection Classification Area/Unit: Contractor: GAC GAC MPC Turnover System: Work Package: PMC Other Sub – System:
Drawing No.: Specification No.:
Item Description of Check Subcontractor HQC FOUNDATIONS 01 Foundation inspections and tests complete. Piles Soils Concrete 02 Leveling plate or billet plate grouting complete and checked. ANCHOR BOLTS 03 Grade and elevation 04 Anchor bolts condition 05 Base plate condition 06 Bearings surface cleaned and protected 07 Shimming of base plates FIT-UP 08 Correct numbers location, and size 09 Survey Group checks alignment, plumbness, spacing, and elevation for conformance to erection tolerances 10 Match of member 11 Members free of distortion 12 Mating surfaces free of paint BOLTS 13 Correct grade 14 Correct length 15 Correct size 16 All bolts visually inspected to verify evidence of tightening 17 Connections marked indicating statues 18 Bolt tightening method used: Calibrated Wrench Turn-of-Nut Load Indicating Washers Snap-Off Fasteners WELDING 19 Welds approved by welding inspector 20 Field coatings checked 21 Fireproofing inspections and tests complete 22 Final inspection complete GAC PMC VENDOR MPC Name: