GC-ME-001 Rev A01

UMM WU’AL PHOSPHATE PROJECT


SOP PRODUCTION PLANT
GULF ASIA ONTRACTING
COMPANY LLC.

RELEASE FOR FOLLOW-ON WORK Report No.:


Tag Description: Inspection Classification Tag No.:
P. O. No.: GAC □ MPC □ Turnover System:
Contractor: GAC Sub-System:
Work Package: PMC □ Other □ Location:

Contract Number: 14-KB-023 Follow-on work activity speciality:


CIVIL
Unit No.:
STRUCTURE
PIPING
System No.:
MECH.
INSTUMENT
Package No.:
ELECTRICAL
PAINTING
Equipment No.:
INSULATION
OTHERS
Detail as required:

REMARKS:

ATTACHMENTS : YES  NO 
GAC PMC VENDOR MPC
Name:

Signature:

Date: