You are on page 1of 1

Computer (Raised) Floors Checklist

Tag Description: Tag No.:

P. O. No.: Inspection Classification Area/Unit:

Subcontractor: Subcontractor Owner Turnover System:

Work Package: Company Other Sub – System:


Item Description of Check Subcontractor Client
01 Correct materials used for floor panels/elements.
02 Correct materials used for floor supports.
03 Correct materials used for floor finishing.
04 Verify completion of installation per design.
05 Verify system level and square.
06 Floor system clean and free of damage.

Notes:

Company

Name:

Signature:

Date: