3. To facilitate the - Make a listing of priorities based Minutes of the meeting and Principal, Brigada August 1-22, 2022 If 80 to 95% of the
implementation through on inspection pictures. Committee, and PTA targets for the
the agreed scheme. - Prepare projected cost estimates Officers. implementation have
- Identify potential donors/ been met.
benefactors. Implementation Scheme.
- Conduct PTA Board meeting
with the Committee. Returned letters with
-Strategized scheme on its acknowledgement
projected implementation
-Send communication to the
identified benefactors.
-Send communication and
acknowledge early pledges
through letters
4. To strengthen 75% of the projected -Conduct advocacy through Announcement Principal, Brigada August 1-22, 2022 When the projected
stakeholders participation. stakeholders should have been announcement , streamer, Streamer Committee, PTA Officers target will have been
participated on the conduct of broadcast media, streamers Social Media and Stakeholders manifested.
Brigada Eskwela.
-Implementation of Brigada
Eskwela Maintenance Week.
Brigada Attendance
Pictures
Reports
5. Establish the 75% of parents/students during -Continued implementation by School Memorandum Principal, Brigada August 1-July 2023 When target will have
institutionalization of school days brigade will have month or quarterly per year level Attendance Committee, PTA been manifested.
Brigada Eskwela activity been manifested and per section. Pictures Officers, Parents and
during school days. institutionalization of the Students
program will have been
achieved.
Prepared by
NOTED BY:
JOSIE D. GRATIL
SCHOOL HEAD
BRIGADA ESKWELA SCHOOL WORK PLAN
3. Implementation Implement the different BE 2019 activities such as: August 2022
A. Safe Learning Facilities Program Electrical Supplies Php 20,000.00
1. Facilitate the assessment of school electrical Implementation Fire extinguishers
system to make necessary repairs and/or upgrades Committee Construction
to prevent accident. Stakeholders Supplies and
2. Install appropriate and available fire (PTA/SGC) Equipment/Tools Cleaning
suppression equipment or resources such as fire Volunteers from Tools/Equipment
extinguishers, water resource, and other indigenous Government Banners
materials. Agencies, Private
3. Repair minor classroom damages such as Sector,
broken windows, doors, blackboards, roofs, etc. Nongovernment
(repair of ceiling in the HE Building) Agencies
4. Secure cabinets and drawers and ensure that Barangay
heavy objects are below head level. Officials
5. Make sure that corridors and pathways are Learners
unobstructed and that all sharp protruding objects Teachers & Staff
which may cause harm to students are
removed.
6. Post safety measures in laboratories And
workshops.
7. Cordon off and post safety signage for
1. Convene the members of the BE August – July 2022 BE Steering Bond Papers Php500.00
Steering Committee and all Working Committee Folders
Committees immediately after the All Working Printer
Brigada Eskwela week. (Let the Committees Ink
Documentation Committee members, with
5. Reporting the help of the other committee members,
summarize/consolidate all the completed
reports/forms)
NOTED BY:
JOSIE D. GRATIL
SCHOOL HEAD