NARJIS

BUSINESS PARK

KINGDOM OF SAUDI ARABIA · RIYADH


OWNER · ASEEL COMPANY

DESIGN DEVELOPMENT STAGE | MARCH 2024

MKAN ARCHITECTS | ARCHITECT SALEH MOHAMMAD ALLUHAIDAN


CONTENTS

PROJECT LOCATION
DESIGN INSPIRATION
DESIGN ANALYSIS
AREA CALCULATION
LOT PLAN
FLOOR PLANS
SECTIONS
CHAPTER ONE

PROJECT LOCATION
KING KHALID
INTERNATIONAL
AIRPORT

PRINCESS
NOURAH BINT
THE SITE 2 KM 5 KM ABDUL
10 KM RAHMAN
UNIVERSITY

IMAM
MUHAMMAD IBN
SAUD ISLAMIC
UNIVERSITY

NARJIS
KAFD
SITE LOCATION AND LANDMARKS
AROUND FROM VICINITY
KING SAUD
UNIVERSITY

12 km 7 km
KING KHALED EXPO 2030
INTERNATIONAL AIRPORT RIYADH
DIPLOMATIC
QUARTER

16 km 21 km
KING SAUD DIPLOMATIC
UNIVERSITY QUARTER

11 km 17 km
KING ABDULLAH DIRIYAH
FINANCIAL DISTICT

18 km 8 km
KING SALMAN PARK PRINCESS NOURAH
BINT ABDULRAHMAN
UNIVERSITY *PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
CHAPTER TWO

DESIGN INSPIRATION
OFFICE AREA

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
DROP-OFF ZONE

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
OUTDOOR WORK SPACE

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
OUTDOOR COURTYARD

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
CHAPTER THREE

DESIGN ANALYSIS
BASEMENT FLOOR .
PARKING AREAS

ROOF FLOOR .
ROOF GARDEN

GROUND, FIRST & ROOF FLOOR .


OFFICES

SHAFT .

ELEVATOR .
ACCESS ALL FLOORS

HALLWAY .

LEGEND

OFFICE SPACE

BUILDING SERVICES

CORRIDOR / HALLWAY

LIFT

CORRIDOR / HALLWAY

ROOF GARDEN

BUILDING CONFIGURATION STAIRS

RAMPS

SHAFT

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
PARKING AREAS .

ROOF GARDEN .

OFFICES .

RAMPS .

MAIN ENTRANCE .

LEGEND

OFFICE SPACE

BUILDING SERVICES

CORRIDOR / HALLWAY

LIFT

CORRIDOR / HALLWAY

ROOF GARDEN

DESIGN STRATEGY STAIRS

RAMPS

THE PROJECT IS DIVIDED INTO FIVE INDIVIDUAL BUILDINGS SHAFT


WITH THE OPTION TO CONNECT TWO OR MORE IN THE EVENT
IT WILL BE OCCUPIED BY A SINGLE TENANT.
THE SPACE BETWEEN BUILDINGS WILL INCLUDE GARDEN
AREAS FOR RELAXATION ALSO FOR OUTDOOR WORK.

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
CHAPTER FOUR

PERSPECTIVES
*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
CHAPTER FIVE

AREA CALCULATION
PROJECT AREAS

156,002.30 M² 44,417.70 M² 9,813.35 M²


TOTAL BUILT-UP AREA TOTAL AREA OF RENTABLE AREA TOTAL AREA OF CIRCULATION & WALLS

160 1,801
TOTAL NUMBER TOTAL PARKING
OF OFFICES AREA

NUMBER OF FLOORS
B3 + B2 + B1 + G + 1ST + R

BASEMENT 3 BASEMENT 2 BASEMENT 1


PERCENTAGE : 95.33 % PERCENTAGE : 95.33 % PERCENTAGE : 95.33 %

PARKING SLOT : 585 PARKING SLOT : 575 PARKING SLOT : 575

BUILT-UP AREA : 33,923.75 M² BUILT-UP AREA : 33,923.75 M² BUILT-UP AREA : 33,923.75 M²

GROUND FLOOR FIRST FLOOR ROOF FLOOR


OFFICES : 16,514.10 M² OFFICES : 19,580.40 M² OFFICES : 8,323.20 M²

PERCENTAGE : 55.97 % PERCENTAGE : 64.42 % PERCENTAGE : 32.00 %

PARKING SLOT : 66

BUILT-UP AREA : 19,916.55 M² BUILT-UP AREA : 22,925.00 M² BUILT-UP AREA : 11,389.50 M²

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
CHAPTER SIX

LOT PLAN
N

332.90

5.
96
87.18
LOT AREA
107.16

35,587.26 m²

21
.
21
317.32

LOT PLAN

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
CHAPTER SEVEN

FLOOR PLANS
N

336.71

9.76 52.00 12.00 52.00 12.00 52.00 12.00 52.00 12.00 52.00 18.96
8.64

8.00
8.00 8.00 8.00 8.00

BUILDING E BUILDING D BUILDING C BUILDING B BUILDING A


85.80

85.80
107.11

106.39
BUILDING BUILDING BUILDING BUILDING BUILDING
FOOTPRINT FOOTPRINT FOOTPRINT FOOTPRINT FOOTPRINT
3,983.31 M² 3,983.31 M² 3,983.31 M² 3,983.31 M² 3,983.31 M²

10
.9

12.59
12.67

0
6.50 52.00 12.00 52.00 12.00 52.00 12.00 52.00 12.00 52.00 17.82

332.32

SITE PLAN (BUILDING FOOTPRINT)

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
N

BASEMENT FLOOR BUILT-UP AREA = 33,923.75 sq.m.

336.71

3.76 64.00 64.00 64.00 64.00 64.00 12.96


Y.1
22.80 22.80 22.80 22.80
OPTIONAL OPTIONAL OPTIONAL OPTIONAL
FUTURE RAMP FUTURE RAMP FUTURE RAMP FUTURE RAMP
.74

.10
ACCESS ACCESS ACCESS ACCESS
1 113 1 113 1 113 1 113 1 113
6.60

6.60

6.60

6.60

6.60
7.60

7.60

7.60

7.60

7.60
2 112 2 112 2 112 2 112 2 112

3 111 3 111 3 111 3 111 3 111


.50

.50

.50

.50

.50
6.60 6.60 6.60 6.60 6.60 6.60 6.60 6.60 6.60 6.60
4 110 4 110 4 110 4 110 4 110
117 116 115 114 117 116 115 114 117 116 115 114 117 116 115 114 117 116 115 114
5.50

5.50

5.50

5.50

5.50
6 5 109 108 6 5 109 108 6 5 109 108 6 5 109 108 6 5 109 108
.40 6.00 7.60 6.00 14.00 6.00 7.60 6.00 .40 .40 6.00 7.60 6.00 14.00 6.00 7.60 6.00 .40 .40 6.00 7.60 6.00 14.00 6.00 7.60 6.00 .40 .40 6.00 7.60 6.00 14.00 6.00 7.60 6.00 .40 .40 6.00 7.60 6.00 14.00 6.00 7.60 6.00 .40
.20

.20

.20

.20

.20
X.2
8 7 107 106 8 7 107 106 8 7 107 106 8 7 107 106 8 7 107 106
PROVISION FOR PROVISION FOR PROVISION FOR PROVISION FOR PROVISION FOR
5.10

5.10

5.10

5.10

5.10
ELECTRO-MECHANICAL ELECTRO-MECHANICAL ELECTRO-MECHANICAL ELECTRO-MECHANICAL ELECTRO-MECHANICAL

1.10 .20 11.40 .201.10 1.10 .20 11.40 .201.10 1.10 .20 11.40 .20 1.10 1.10 .20 11.40 .20 1.10 1.10 .20 11.40 .201.10

10 9 105 104 10 9 105 104 10 9 105 104 10 9 105 104 10 9 105 104
.20

.20

.20

.20

.20
3.90

3.90

3.90

3.90

3.90
12 11 103 102 12 11 103 102 12 11 103 102 12 11 103 102 12 11 103 102
.20 6.10 .20 3.80 .20 6.10 .20 .20 6.10 .20 3.80 .20 6.10 .20 .20 6.10 .20 3.80 .20 6.10 .20 .20 6.10 .20 3.80 .20 6.10 .20 .20 6.10 .20 3.80 .20 6.10 .20
.20

.20

.20

.20

.20
PROVISION FOR BICYCLE BICYCLE PROVISION FOR PROVISION FOR BICYCLE BICYCLE PROVISION FOR PROVISION FOR BICYCLE BICYCLE PROVISION FOR PROVISION FOR BICYCLE BICYCLE PROVISION FOR PROVISION FOR BICYCLE BICYCLE PROVISION FOR
ELECTRO-MECHANICAL PARKING AREA PARKING AREA ELECTRO-MECHANICAL ELECTRO-MECHANICAL PARKING AREA PARKING AREA ELECTRO-MECHANICAL ELECTRO-MECHANICAL PARKING AREA PARKING AREA ELECTRO-MECHANICAL ELECTRO-MECHANICAL PARKING AREA PARKING AREA ELECTRO-MECHANICAL ELECTRO-MECHANICAL PARKING AREA PARKING AREA ELECTRO-MECHANICAL
OR WATER TANKS UP UP OR WATER TANKS OR WATER TANKS UP UP OR WATER TANKS OR WATER TANKS UP UP OR WATER TANKS OR WATER TANKS UP UP OR WATER TANKS OR WATER TANKS UP UP OR WATER TANKS

13 101 13 101 13 101 13 101 13 101


3.30

3.30

3.30

3.30

3.30
SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT
.30

.30

.30

.30

.30
3.00

3.00

3.00

3.00

3.00
15 14 100 99 15 14 100 99 15 14 100 99 15 14 100 99 15 14 100 99
.30

.30

.30

.30

.30
3.30

3.30

3.30

3.30

3.30
16 SHAFT SHAFT 98 16 SHAFT SHAFT 98 16 SHAFT SHAFT 98 16 SHAFT SHAFT 98 16 SHAFT SHAFT 98
BICYCLE UP UP BICYCLE BICYCLE UP UP BICYCLE BICYCLE UP UP BICYCLE BICYCLE UP UP BICYCLE BICYCLE UP UP BICYCLE
PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA
.20

.20

.20

.20

.20
LOBBY LOBBY LOBBY LOBBY LOBBY
ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC
.20 1.85

.20 1.85

.20 1.85

.20 1.85

.20 1.85
SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT
18 17
ELEVATOR ELEVATOR
96 97 18 17
ELEVATOR ELEVATOR
96 97 18 17
ELEVATOR ELEVATOR
96 97 18 17
ELEVATOR ELEVATOR
96 97 18 17
ELEVATOR ELEVATOR
96 97
TENANT TENANT TENANT TENANT TENANT TENANT TENANT TENANT TENANT TENANT
3.90

3.90

3.90

3.90

3.90
SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT
1.85

1.85

1.85

1.85

1.85
WET ELEVATOR ELEVATOR WET WET ELEVATOR ELEVATOR WET WET ELEVATOR ELEVATOR WET WET ELEVATOR ELEVATOR WET WET ELEVATOR ELEVATOR WET
SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT
20 95 20 95 20 95 20 95 20 95
.20

.20

.20

.20

.20
19 .20 1.20 .20 2.20 .20 3.80 .20 2.20 .20 1.20 .20 94 19 .20 1.20 .20 2.20 .20 3.80 .20 2.20 .20 1.20 .20 94 19 .20 1.20 .20 2.20 .20 3.80 .20 2.20 .20 1.20 .20 94 19 .20 1.20 .20 2.20 .20 3.80 .20 2.20 .20 1.20 .20 94 19 .20 1.20 .20 2.20 .20 3.80 .20 2.20 .20 1.20 .20 94
SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER
HANDWASH

HANDWASH

HANDWASH

HANDWASH

HANDWASH

HANDWASH

HANDWASH

HANDWASH

HANDWASH

HANDWASH
SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER SHOWER
6.00

6.00

6.00

6.00

6.00
21 WC WC
21 WC WC
21 WC WC
21 WC WC
21 WC WC

WC WC
93 WC WC
93 WC WC
93 WC WC
93 WC WC
93
.20

.20

.20

.20

.20
MEN'S LOCKER WOMEN'S LOCKER MEN'S LOCKER WOMEN'S LOCKER MEN'S LOCKER WOMEN'S LOCKER MEN'S LOCKER WOMEN'S LOCKER MEN'S LOCKER WOMEN'S LOCKER
2.70

2.70

2.70

2.70

2.70
22 AND CHANGING
5.60
AND CHANGING
5.60 22 AND CHANGING
5.60
AND CHANGING
5.60 22 AND CHANGING
5.60
AND CHANGING
5.60 22 AND CHANGING
5.60
AND CHANGING
5.60 22 AND CHANGING
5.60
AND CHANGING
5.60
.20

.20

.20

.20

.20
92 92 92 92 92
+660.05 CLEANING +658.95 CLEANING +657.85 CLEANING +656.75 CLEANING +655.65 CLEANING
2.00

2.00

2.00

2.00

2.00
M W M W M W M W M W
STORAGE STORAGE STORAGE STORAGE STORAGE
107.11

.20

.20

.20

.20

.20
106.03

106.03

106.39
.20 3.20 .20 4.60 .20 3.20 .20 .20 3.20 .20 4.60 .20 3.20 .20 .20 3.20 .20 4.60 .20 3.20 .20 .20 3.20 .20 4.60 .20 3.20 .20 .20 3.20 .20 4.60 .20 3.20 .20

+660.20 +659.10 +658.00 +656.90 +655.80


3.00

3.00

3.00

3.00

3.00
24 23 90 91 24 23 90 91 24 23 90 91 24 23 90 91 24 23 90 91
.20

.20

.20

.20

.20
26 25 89 26 25 89 26 25 89 26 25 89 26 25 89

88 88 88 88 88
28 AS PER
87 28 AS PER
87 28 AS PER
87 28 AS PER
87 28 AS PER
87
11.10

11.10

11.10

11.10

11.10
OPERATIONS OPERATIONS OPERATIONS OPERATIONS OPERATIONS
27 REQUIREMENTS
27 REQUIREMENTS
27 REQUIREMENTS
27 REQUIREMENTS
27 REQUIREMENTS

4.30 .20.60 6.00 7.60 6.00 1.10 .20 11.40 .20 1.10 6.00 7.60 6.60 .20 4.285 4.285 .20.60 6.00 7.60 6.00 1.10 .20 11.40 .20 1.10 6.00 7.60 6.60 .20 4.285 4.285 .20.60 6.00 7.60 6.00 1.10 .20 11.40 .20 1.10 6.00 7.60 6.60 .20 4.285 4.285 .20.60 6.00 7.60 6.00 1.10 .20 11.40 .20 1.10 6.00 7.60 6.60 .20 4.285 4.285 .20.60 6.00 7.60 6.00 1.10 .20 11.40 .20 1.10 6.00 7.60 6.60 .20 4.30
29 86 85 29 86 85 29 86 85 29 86 85 29 86 85

.20 1.20 .20 2.20 .20 3.80 .20 2.20 .20 1.20 .20 .20 1.20 .20 2.20 .20 3.80 .20 2.20 .20 1.20 .20 .20 1.20 .20 2.20 .20 3.80 .20 2.20 .20 1.20 .20 .20 1.20 .20 2.20 .20 3.80 .20 2.20 .20 1.20 .20 .20 1.20 .20 2.20 .20 3.80 .20 2.20 .20 1.20 .20

31 30 84 83 31 30 84 83 31 30 84 83 31 30 84 83 31 30 84 83
.20

.20

.20

.20

.20
WET WET WET WET WET WET WET WET WET WET
.20 1.85

.20 1.85

.20 1.85

.20 1.85

.20 1.85
SHAFT ELEVATOR ELEVATOR SHAFT SHAFT ELEVATOR ELEVATOR SHAFT SHAFT ELEVATOR ELEVATOR SHAFT SHAFT ELEVATOR ELEVATOR SHAFT SHAFT ELEVATOR ELEVATOR SHAFT

FROM TENANT TENANT TO TO TENANT TENANT FROM FROM TENANT TENANT TO TO TENANT TENANT FROM FROM TENANT TENANT TO
3.90

3.90

3.90

3.90

3.90
SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT
ABOVE 32 82 ABOVE ABOVE 32 82 ABOVE ABOVE 32 82 ABOVE ABOVE 32 82 ABOVE ABOVE 32 82 ABOVE
33 81 33 81 33 81 33 81 33 81
1.85

1.85

1.85

1.85

1.85
ELEC ELEVATOR ELEVATOR ELEC ELEC ELEVATOR ELEVATOR ELEC ELEC ELEVATOR ELEVATOR ELEC ELEC ELEVATOR ELEVATOR ELEC ELEC ELEVATOR ELEVATOR ELEC
SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT
X.1 LOBBY LOBBY LOBBY LOBBY LOBBY
.20

.20

.20

.20

.20
BICYCLE BICYCLE BICYCLE BICYCLE BICYCLE BICYCLE BICYCLE BICYCLE BICYCLE BICYCLE
PARKING AREA UP UP PARKING AREA PARKING AREA UP UP PARKING AREA PARKING AREA UP UP PARKING AREA PARKING AREA UP UP PARKING AREA PARKING AREA UP UP PARKING AREA

34 80 34 80 34 80 34 80 34 80
3.30

3.30

3.30

3.30

3.30
SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT
.30

.30

.30

.30

.30
3.00

3.00

3.00

3.00

3.00
35 36 78 79 35 36 78 79 35 36 78 79 35 36 78 79 35 36 78 79
.30

.30

.30

.30

.30
3.30

3.30

3.30

3.30

3.30
37 SHAFT SHAFT 77 37 SHAFT SHAFT 77 37 SHAFT SHAFT 77 37 SHAFT SHAFT 77 37 SHAFT SHAFT 77
BICYCLE UP UP BICYCLE BICYCLE UP UP BICYCLE BICYCLE UP UP BICYCLE BICYCLE UP UP BICYCLE BICYCLE UP UP BICYCLE
PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA
.20

.20

.20

.20

.20
.20 6.10 .20 3.80 .20 6.10 .20 .20 6.10 .20 3.80 .20 6.10 .20 .20 6.10 .20 3.80 .20 6.10 .20 .20 6.10 .20 3.80 .20 6.10 .20 .20 6.10 .20 3.80 .20 6.10 .20

38 39 75 76 38 39 75 76 38 39 75 76 38 39 75 76 38 39 75 76
5.40

5.40

5.40

5.40

5.40
40 41 73 74 40 41 73 74 40 41 73 74 40 41 73 74 40 41 73 74
.80

.80

.80

.80

.80
42 43 71 72 42 43 71 72 42 43 71 72 42 43 71 72 42 43 71 72
6.13

6.13

6.13

6.13

6.13
45 54 56 58 60 69 45 54 56 58 60 69 45 54 56 58 60 69 45 54 56 58 60 69 45 54 56 58 60 69
44 70 44 70 44 70 44 70 44 70
7.60

7.60

7.60

7.60

7.60
6.60

6.60

6.60

6.60

6.60
X.3

57 59 61 57 59 61 57 59 61 57 59 61 57 59 61
6.00

6.00

6.00

6.00

6.00
46 47 48 49 50 51 52 53 55 62 63 64 65 66 67 68 46 47 48 49 50 51 52 53 55 62 63 64 65 66 67 68 46 47 48 49 50 51 52 53 55 62 63 64 65 66 67 68 46 47 48 49 50 51 52 53 55 62 63 64 65 66 67 68 46 47 48 49 50 51 52 53 55 62 63 64 65 66 67 68
1.30 .20

1.30 .20

1.30 .20

1.30 .20

1.30 .20

.27
.34

MECHANICAL SHAFT MECHANICAL SHAFT MECHANICAL SHAFT MECHANICAL SHAFT MECHANICAL SHAFT
(OPEN TO ABOVE) (OPEN TO ABOVE) (OPEN TO ABOVE) (OPEN TO ABOVE) (OPEN TO ABOVE)

.50 64.00 64.00 64.00 64.00 64.00 11.82

BASEMENT 03 FLOOR

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS TOTAL BUILD UP AREA . 33,923.75 M² . 95.33% . 585 PARKING


BASEMENT FLOOR BUILT-UP AREA = 33,923.75 sq.m.

336.71

3.76 64.00 64.00 64.00 64.00 64.00 12.96


Y.1
22.80 22.80 22.80
OPTIONAL OPTIONAL OPTIONAL OPTIONAL
FUTURE RAMP FUTURE RAMP FUTURE RAMP FUTURE RAMP
.84

ACCESS ACCESS ACCESS ACCESS

.20
1 111 1 111 1 111 1 111 1 111
6.60

6.60

6.60

6.60

6.60
7.60

7.60

7.60

7.60

7.60
2 110 2 110 2 110 2 110 2 110

3 109 3 109 3 109 3 109 3 109


.50

.50

.50

.50

.50
6.60 6.60 6.60 6.60 6.60 6.60 6.60 6.60 6.60 6.60
4 108 4 108 4 108 4 108 4 108
115 114 113 112 115 114 113 112 115 114 113 112 115 114 113 112 115 114 113 112
5.50

5.50

5.50

5.50

5.50
4.60 .40 6.006 7.60
5
6.00 14.00
107
6.00 7.60 106
6.00 .40 .40 6.006 7.60
5
6.00 14.00
107
6.00 7.60 106
6.00 .40 .40 6.006 7.60
5
6.00 14.00
107
6.00 7.60 106
6.00 .40 .40 6.006 7.60
5
6.00 14.00
107
6.00 7.60 106
6.00 .40 .40 6
6.00 7.60
5
6.00 14.00
107
6.00 7.60 106
6.00 .40
.20

.20

.20

.20

.20
X.2
8 7 105 104 8 7 105 104 8 7 105 104 8 7 105 104 8 7 105 104
PROVISION FOR PROVISION FOR PROVISION FOR PROVISION FOR PROVISION FOR
5.50

5.10

5.10

5.50

5.10

5.10

5.50

5.10

5.10

5.50

5.10

5.10

5.50

5.10

5.10
ELECTRO-MECHANICAL ELECTRO-MECHANICAL ELECTRO-MECHANICAL ELECTRO-MECHANICAL ELECTRO-MECHANICAL

1.10 .20 11.40 .201.10 1.10 .20 11.40 .201.10 1.10 .20 11.40 .20 1.10 1.10 .20 11.40 .20 1.10 1.10 .20 11.40 .201.10

10 9 103 102 10 9 103 102 10 9 103 102 10 9 103 102 10 9 103 102
.20

.20

.20

.20

.20
3.90

3.90

3.90

3.90

3.90
12 11 101 100 12 11 101 100 12 11 101 100 12 11 101 100 12 11 101 100
.20 6.10 .20 3.80 .20 6.10 .20 .20 6.10 .20 3.80 .20 6.10 .20 .20 6.10 .20 3.80 .20 6.10 .20 .20 6.10 .20 3.80 .20 6.10 .20 .20 6.10 .20 3.80 .20 6.10 .20
.20

.20

.20

.20

.20
PROVISION FOR BICYCLE BICYCLE PROVISION FOR PROVISION FOR BICYCLE BICYCLE PROVISION FOR PROVISION FOR BICYCLE BICYCLE PROVISION FOR PROVISION FOR BICYCLE BICYCLE PROVISION FOR PROVISION FOR BICYCLE BICYCLE PROVISION FOR
ELECTRO-MECHANICAL PARKING AREA PARKING AREA ELECTRO-MECHANICAL ELECTRO-MECHANICAL PARKING AREA PARKING AREA ELECTRO-MECHANICAL ELECTRO-MECHANICAL PARKING AREA PARKING AREA ELECTRO-MECHANICAL ELECTRO-MECHANICAL PARKING AREA PARKING AREA ELECTRO-MECHANICAL ELECTRO-MECHANICAL PARKING AREA PARKING AREA ELECTRO-MECHANICAL
OR WATER TANKS UP UP OR WATER TANKS OR WATER TANKS UP UP OR WATER TANKS OR WATER TANKS UP UP OR WATER TANKS OR WATER TANKS UP UP OR WATER TANKS OR WATER TANKS UP UP OR WATER TANKS

13 99 13 99 13 99 13 99 13 99
3.30

3.30

3.30

3.30

3.30
SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT

DN DN DN DN DN DN DN DN DN DN
.30

.30

.30

.30

.30
3.00

3.00

3.00

3.00

3.00
15 14 97 98 15 14 97 98 15 14 97 98 15 14 97 98 15 14 97 98
.30

.30

.30

.30

.30
DN DN DN DN DN DN DN DN DN DN
3.30

3.30

3.30

3.30

3.30
16 SHAFT SHAFT 96 16 SHAFT SHAFT 96 16 SHAFT SHAFT 96 16 SHAFT SHAFT 96 16 SHAFT SHAFT 96
BICYCLE UP UP BICYCLE BICYCLE UP UP BICYCLE BICYCLE UP UP BICYCLE BICYCLE UP UP BICYCLE BICYCLE UP UP BICYCLE
PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA
.20

.20

.20

.20

.20
LOBBY LOBBY LOBBY LOBBY LOBBY
ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC
.20 1.85

.20 1.85

.20 1.85

.20 1.85

.20 1.85
SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT
18 17
ELEVATOR ELEVATOR
94 95 18 17
ELEVATOR ELEVATOR
94 95 18 17
ELEVATOR ELEVATOR
94 95 18 17
ELEVATOR ELEVATOR
94 95 18 17
ELEVATOR ELEVATOR
94 95
TENANT TENANT TENANT TENANT TENANT TENANT TENANT TENANT TENANT TENANT
3.90

3.90

3.90

3.90

3.90
SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT
1.85

1.85

1.85

1.85

1.85
WET ELEVATOR ELEVATOR WET WET ELEVATOR ELEVATOR WET WET ELEVATOR ELEVATOR WET WET ELEVATOR ELEVATOR WET WET ELEVATOR ELEVATOR WET
SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT
20 93 20 93 20 93 20 93 20 93
.20

.20

.20

.20

.20
19 .20 1.20 .20 2.20 .20 3.80 .20 2.20 .20 1.20 .20 92 19 .20 1.20 .20 2.20 .20 3.80 .20 2.20 .20 1.20 .20 92 19 .20 1.20 .20 2.20 .20 3.80 .20 2.20 .20 1.20 .20 92 19 .20 1.20 .20 2.20 .20 3.80 .20 2.20 .20 1.20 .20 92 19 .20 1.20 .20 2.20 .20 3.80 .20 2.20 .20 1.20 .20 92

21 21 21 21 21

91 91 91 91 91
OPTIONAL
11.10

11.10

11.10

11.10

11.10
MULTI-PURPOSE MULTI-PURPOSE MULTI-PURPOSE MULTI-PURPOSE MULTI-PURPOSE
ROOM ROOM ROOM ROOM ROOM

22 22 FUTURE ACCESS 22 22 22

90 90 90 90 90
+664.05 +662.95 +661.85 +660.75 +659.65
107.11

.20

.20

.20

.20

.20
105.92

105.92

106.39
+664.20 +663.10 +662.00 +660.90 +659.80
25.60

25.60

25.60

25.60

25.60
3.00

3.00

3.00

3.00

3.00
24 23 88 89 24 23 88 89 24 23 88 89 24 23 88 89 24 23 88 89
.20

.20

.20

.20

.20
26 25 87 26 25 87 26 25 87 26 25 87 26 25 87

86 86 86 86 86
28 85 28 85 28 85 28 85 28 85
11.30

11.30

11.30

11.30

11.30
MULTI-PURPOSE MULTI-PURPOSE MULTI-PURPOSE MULTI-PURPOSE MULTI-PURPOSE
ROOM ROOM ROOM ROOM ROOM
27 27 27 27 27
4.30 .20.60 6.00 7.60 6.00 1.10 11.80 1.10 6.00 7.60 6.60 .20 4.285 4.285 .20.60 6.00 7.60 6.00 1.10 11.80 1.10 6.00 7.60 6.60 .20 4.285 4.285 .20.60 6.00 7.60 6.00 1.10 11.80 1.10 6.00 7.60 6.60 .20 4.285 4.285 .20.60 6.00 7.60 6.00 1.10 11.80 1.10 6.00 7.60 6.60 .20 4.285 4.285 .20.60 6.00 7.60 6.00 1.10 11.80 1.10 6.00 7.60 6.60 .20 4.30
29 84 83 29 84 83 29 84 83 29 84 83 29 84 83

.20 1.20 .20 2.20 .20 3.80 .20 2.20 .20 1.20 .20 .20 1.20 .20 2.20 .20 3.80 .20 2.20 .20 1.20 .20 .20 1.20 .20 2.20 .20 3.80 .20 2.20 .20 1.20 .20 .20 1.20 .20 2.20 .20 3.80 .20 2.20 .20 1.20 .20 .20 1.20 .20 2.20 .20 3.80 .20 2.20 .20 1.20 .20

31 30 82 81 31 30 82 81 31 30 82 81 31 30 82 81 31 30 82 81
.20

.20

.20

.20

.20
WET WET WET WET WET WET WET WET WET WET
.20 1.85

.20 1.85

.20 1.85

.20 1.85

.20 1.85
SHAFT ELEVATOR ELEVATOR SHAFT SHAFT ELEVATOR ELEVATOR SHAFT SHAFT ELEVATOR ELEVATOR SHAFT SHAFT ELEVATOR ELEVATOR SHAFT SHAFT ELEVATOR ELEVATOR SHAFT

TENANT TENANT TENANT TENANT TENANT TENANT TENANT TENANT TENANT TENANT
3.90

3.90

3.90

3.90

3.90
FROM SHAFT SHAFT TO TO SHAFT SHAFT FROM FROM SHAFT SHAFT TO TO SHAFT SHAFT FROM FROM SHAFT SHAFT TO
ABOVE 33 32 80 79 ABOVE ABOVE 33 32 80 79 ABOVE ABOVE 33 32 80 79 ABOVE ABOVE 33 32 80 79 ABOVE ABOVE 33 32 80 79 ABOVE
1.85

1.85

1.85

1.85

1.85
ELEC ELEVATOR ELEVATOR ELEC ELEC ELEVATOR ELEVATOR ELEC ELEC ELEVATOR ELEVATOR ELEC ELEC ELEVATOR ELEVATOR ELEC ELEC ELEVATOR ELEVATOR ELEC
SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT
X.1 LOBBY LOBBY LOBBY LOBBY LOBBY
.20

.20

.20

.20

.20
BICYCLE BICYCLE BICYCLE BICYCLE BICYCLE BICYCLE BICYCLE BICYCLE BICYCLE BICYCLE
PARKING AREA UP UP PARKING AREA PARKING AREA UP UP PARKING AREA PARKING AREA UP UP PARKING AREA PARKING AREA UP UP PARKING AREA PARKING AREA UP UP PARKING AREA

34 78 34 78 34 78 34 78 34 78
3.30

3.30

3.30

3.30

3.30
SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT

DN DN DN DN DN DN DN DN DN DN
.30

.30

.30

.30

.30
3.00

3.00

3.00

3.00

3.00
36 35 76 77 36 35 76 77 36 35 76 77 36 35 76 77 36 35 76 77
.30

.30

.30

.30

.30
DN DN DN DN DN DN DN DN DN DN
3.30

3.30

3.30

3.30

3.30
37 SHAFT SHAFT 75 37 SHAFT SHAFT 75 37 SHAFT SHAFT 75 37 SHAFT SHAFT 75 37 SHAFT SHAFT 75
BICYCLE UP UP BICYCLE BICYCLE UP UP BICYCLE BICYCLE UP UP BICYCLE BICYCLE UP UP BICYCLE BICYCLE UP UP BICYCLE
PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA
.20

.20

.20

.20

.20
.20 6.10 .20 3.80 .20 6.10 .20 .20 6.10 .20 3.80 .20 6.10 .20 .20 6.10 .20 3.80 .20 6.10 .20 .20 6.10 .20 3.80 .20 6.10 .20 .20 6.10 .20 3.80 .20 6.10 .20

39 38 73 74 39 38 73 74 39 38 73 74 39 38 73 74 39 38 73 74
5.40

5.40

5.40

5.40

5.40
41 40 71 72 41 40 71 72 41 40 71 72 41 40 71 72 41 40 71 72
.80

.80

.80

.80

.80
43 42 69 70 43 42 69 70 43 42 69 70 43 42 69 70 43 42 69 70
5.63

5.63

5.63

5.63

5.63
53 55 57 59 53 55 57 59 53 55 57 59 53 55 57 59 53 55 57 59
44 68 44 68 44 68 44 68 44 68
.50

.50

.50

.50

.50
FROM FROM TO TO FROM FROM TO TO FROM
TO BELOW
BELOW BELOW BELOW BELOW BELOW BELOW BELOW BELOW BELOW
7.60

7.60

7.60

7.60

7.60
6.60

6.60

6.60

6.60

6.60
X.3

56 58 60 56 58 60 56 58 60 56 58 60 56 58 60
6.00

6.00

6.00

6.00

6.00
45 46 47 48 49 50 51 52 54 61 62 63 64 65 66 67 45 46 47 48 49 50 51 52 54 61 62 63 64 65 66 67 45 46 47 48 49 50 51 52 54 61 62 63 64 65 66 67 45 46 47 48 49 50 51 52 54 61 62 63 64 65 66 67 45 46 47 48 49 50 51 52 54 61 62 63 64 65 66 67
1.30 .20

1.30 .20

1.30 .20

1.30 .20

1.30 .20

.27
.34

MECHANICAL SHAFT MECHANICAL SHAFT MECHANICAL SHAFT MECHANICAL SHAFT MECHANICAL SHAFT
(OPEN TO ABOVE) (OPEN TO ABOVE) (OPEN TO ABOVE) (OPEN TO ABOVE) (OPEN TO ABOVE)

.50 64.00 64.00 64.00 64.00 64.00 11.82

BASEMENT 02 FLOOR

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS TOTAL BUILD UP AREA . 33,923.75 M² . 95.33% . 575 PARKING


N

BASEMENT FLOOR BUILT-UP AREA = 33,923.75 sq.m.

336.71

3.76 64.00 64.00 64.00 64.00 64.00 12.96


Y.1
22.80 22.80 22.80
OPTIONAL OPTIONAL OPTIONAL OPTIONAL
FUTURE RAMP FUTURE RAMP FUTURE RAMP FUTURE RAMP
.84

ACCESS ACCESS ACCESS ACCESS

.10
1 111 1 111 1 111 1 111 1 111
6.60

6.60

6.60

6.60

6.60
7.60

7.60

7.60

7.60

7.60

7.60

7.60

7.60

7.60

7.60
2 110 2 110 2 110 2 110 2 110

3 109 3 109 3 109 3 109 3 109


.70

.70

.70

.70

.70
6.60 6.60 6.60 6.60 6.60 6.60 6.60 6.60 6.60 6.60
4 108 4 108 4 108 4 108 4 108
6.00

6.00

6.00

6.00

6.00
115 114 113 112 115 114 113 112 115 114 113 112 115 114 113 112 115 114 113 112

5 107 5 107 5 107 5 107 5 107


8.50

8.50

8.50

8.50

8.50
4.60 .60 6
6.00 7.60 6.00 14.00 6.00 7.60 106
6.00 .60 .60 6
6.00 7.60 6.00 14.00 6.00 7.60 106
6.00 .60 .60 6
6.00 7.60 6.00 14.00 6.00 7.60 106
6.00 .60 .60 6
6.00 7.60 6.00 14.00 6.00 7.60 106
6.00 .60 .60 6
6.00 7.60 6.00 14.00 6.00 7.60 106
6.00 .60
.20

.20

.20

.20

.20
X.2
8 7 105 104 8 7 105 104 8 7 105 104 8 7 105 104 8 7 105 104
FRESH AIR OPENING

FRESH AIR OPENING

FRESH AIR OPENING

FRESH AIR OPENING

FRESH AIR OPENING

FRESH AIR OPENING

FRESH AIR OPENING

FRESH AIR OPENING

FRESH AIR OPENING

FRESH AIR OPENING


PROVISION FOR PROVISION FOR PROVISION FOR PROVISION FOR PROVISION FOR
5.10

5.10

5.10

5.10

5.10

5.10

5.10

5.10

5.10

5.10
ELECTRO-MECHANICAL ELECTRO-MECHANICAL ELECTRO-MECHANICAL ELECTRO-MECHANICAL ELECTRO-MECHANICAL
ABOVE

ABOVE

ABOVE

ABOVE

ABOVE

ABOVE

ABOVE

ABOVE

ABOVE

ABOVE
.80

.80

.80

.80

.80
1.70 .20 10.20 .20 1.70 1.70 .20 10.20 .20 1.70 1.70 .20 10.20 .20 1.70 1.70 .20 10.20 .20 1.70 1.70 .20 10.20 .20 1.70

10 9 103 102 10 9 103 102 10 9 103 102 10 9 103 102 10 9 103 102
.20

.20

.20

.20

.20
3.90

3.90

3.90

3.90

3.90
12 11 101 100 12 11 101 100 12 11 101 100 12 11 101 100 12 11 101 100
8.60

8.60

8.60

8.60

8.60
.20

.20

.20

.20

.20
ELECTRO-MECHANICAL BICYCLE BICYCLE ELECTRO-MECHANICAL ELECTRO-MECHANICAL BICYCLE BICYCLE ELECTRO-MECHANICAL ELECTRO-MECHANICAL BICYCLE BICYCLE ELECTRO-MECHANICAL ELECTRO-MECHANICAL BICYCLE BICYCLE ELECTRO-MECHANICAL ELECTRO-MECHANICAL BICYCLE BICYCLE ELECTRO-MECHANICAL
ROOM OR TANKS PARKING AREA UP UP PARKING AREA ROOM OR TANKS ROOM OR TANKS PARKING AREA UP UP PARKING AREA ROOM OR TANKS ROOM OR TANKS PARKING AREA UP UP PARKING AREA ROOM OR TANKS ROOM OR TANKS PARKING AREA UP UP PARKING AREA ROOM OR TANKS ROOM OR TANKS PARKING AREA UP UP PARKING AREA ROOM OR TANKS

13 99 13 99 13 99 13 99 13 99
3.30

3.30

3.30

3.30

3.30
SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT

DN DN DN DN DN DN DN DN DN DN
.60

.60

.60

.60

.60
.30

.30

.30

.30

.30
3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00
15 14 97 98 15 14 97 98 15 14 97 98 15 14 97 98 15 14 97 98
.30

.30

.30

.30

.30
.60

.60

.60

.60

.60
DN DN DN DN DN DN DN DN DN DN
3.30

3.30

3.30

3.30

3.30
16 SHAFT SHAFT 96 16 SHAFT SHAFT 96 16 SHAFT SHAFT 96 16 SHAFT SHAFT 96 16 SHAFT SHAFT 96
BICYCLE UP UP BICYCLE BICYCLE UP UP BICYCLE BICYCLE UP UP BICYCLE BICYCLE UP UP BICYCLE BICYCLE UP UP BICYCLE
PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA
.20

.20

.20

.20

.20
LOBBY LOBBY LOBBY LOBBY LOBBY
ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC
.20 1.85

.20 1.85

.20 1.85

.20 1.85

.20 1.85
SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT
18 ELEVATOR ELEVATOR
95 18 ELEVATOR ELEVATOR
95 18 ELEVATOR ELEVATOR
95 18 ELEVATOR ELEVATOR
95 18 ELEVATOR ELEVATOR
95
8.60

8.60

8.60

8.60

8.60
17 TENANT TENANT
94 17 TENANT TENANT
94 17 TENANT TENANT
94 17 TENANT TENANT
94 17 TENANT TENANT
94
3.90

3.90

3.90

3.90

3.90
SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT
1.85

1.85

1.85

1.85

1.85
ELEVATOR ELEVATOR ELEVATOR ELEVATOR ELECTRICAL ROOM ELECTRICAL ROOM ELEVATOR ELEVATOR ELECTRICAL ROOM ELECTRICAL ROOM ELEVATOR ELEVATOR ELECTRICAL ROOM ELECTRICAL ROOM ELEVATOR ELEVATOR ELECTRICAL ROOM
WET WET WET WET WET WET WET WET WET WET
SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT
20 93 20 93 20 93 20 93 20 93
.20 1.40 .20

.20 1.40 .20

.20 1.40 .20

.20 1.40 .20

.20 1.40 .20


19 92 19 92 19 92 19 92 19 92
.20 1.20 .20 2.20 .20 3.80 .20 2.20 .20 1.20 .20 .20 1.20 .20 2.20 .20 3.80 .20 2.20 .20 1.20 .20 .20 1.20 .20 2.20 .20 3.80 .20 2.20 .20 1.20 .20 .20 1.20 .20 2.20 .20 3.80 .20 2.20 .20 1.20 .20 .20 1.20 .20 2.20 .20 3.80 .20 2.20 .20 1.20 .20
.80

.60

.80

.80

.80

.80
.90

MEN'S MEN'S MEN'S MEN'S MEN'S


2.60

2.60

2.60

2.60

2.60
SMOKING AREA ABLUTION SMOKING AREA ABLUTION SMOKING AREA ABLUTION SMOKING AREA ABLUTION SMOKING AREA ABLUTION
21 21 21 21 21
.20

.20

.20

.20

.20
PWD WC 91 PWD WC 91 PWD WC 91 PWD WC 91 PWD WC 91
HANDWASH

HANDWASH

HANDWASH

HANDWASH

HANDWASH
8.60

8.60

8.60

8.60

8.60
WC WC WC WC WC
MEN'S PRAYER ROOM MEN'S PRAYER ROOM MEN'S PRAYER ROOM MEN'S PRAYER ROOM MEN'S PRAYER ROOM
(28 PERSONS) (28 PERSONS) (28 PERSONS) (28 PERSONS) (28 PERSONS)
6.70

6.70

6.70

6.70

6.70
22 WC 22 WC 22 WC 22 WC 22 WC
3.30

90 90 90 90 90
+668.05 LOBBY +666.95 LOBBY +665.75 LOBBY +664.75 LOBBY +663.665 LOBBY

BOOK SHELF SHOE SHELF BOOK SHELF SHOE SHELF BOOK SHELF SHOE SHELF BOOK SHELF SHOE SHELF BOOK SHELF SHOE SHELF
.60

.60

.60

.60

.60
107.11

.20

.20

.20

.20

.20

106.03
105.92

106.39
.20 6.20 .20 5.00 .20 .20 6.20 .20 5.00 .20 .20 6.20 .20 5.00 .20 .20 6.20 .20 5.00 .20 .20 6.20 .20 5.00 .20

+668.20 +667.10 +666.00 +664.90 +663.80 TO


3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00
24 23 88 89 24 23 88 89 24 23 88 89 24 23 88 89 24 23 88 89
BELOW
.20

.20

.20

.20

.20
.60

.60

.60

.60

.60
BOOK SHELF SHOE SHELF BOOK SHELF SHOE SHELF BOOK SHELF SHOE SHELF BOOK SHELF SHOE SHELF BOOK SHELF SHOE SHELF

LOBBY LOBBY LOBBY LOBBY LOBBY


26 25 87 26 25 87 26 25 87 26 25 87 26 25 87
6.70

6.70

6.70

6.70

6.70
WOMEN'S PRAYER
WC
86 WOMEN'S PRAYER
WC
86 WOMEN'S PRAYER
WC
86 WOMEN'S PRAYER
WC
86 WOMEN'S PRAYER
WC
86
HANDWASH

HANDWASH

HANDWASH

HANDWASH

HANDWASH
ROOM ROOM ROOM ROOM ROOM
(28 PERSONS) WC (28 PERSONS) WC (28 PERSONS) WC (28 PERSONS) WC (28 PERSONS) WC
8.60

8.60

8.60

8.60

8.60
28 85 28 85 28 85 28 85 28 85
PWD WC PWD WC PWD WC PWD WC PWD WC
27 27 27 27 27
.20

.20

.20

.20

.20
4.30 .20.60 6.00 7.60 6.00 1.70 1.70 6.00 7.60 6.60 .20 4.285 .630 4.285 .20.60 6.00 7.60 6.00 1.70 1.70 6.00 7.60 6.60 .20 4.285 .630 4.285 .20.60 6.00 7.60 6.00 1.70 1.70 6.00 7.60 6.60 .20 4.285 .630 4.285 .20.60 6.00 7.60 6.00 1.70 1.70 6.00 7.60 6.60 .20 4.285 .630 4.285 .20.60 6.00 7.60 6.00 1.70 1.70 6.00 7.60 6.60 .20
29 WOMEN'S
84 83 29 WOMEN'S
84 83 29 WOMEN'S
84 83 29 WOMEN'S
84 83 29 WOMEN'S
84 83
2.60

2.60

2.60

2.60

2.60
ABLUTION ABLUTION ABLUTION ABLUTION ABLUTION
SMOKING AREA SMOKING AREA SMOKING AREA SMOKING AREA SMOKING AREA
.80

.80

.80

.80

.80
.20 1.40 .20

.20 1.40 .20

.20 1.40 .20

.20 1.40 .20

.20 1.40 .20


.20 1.20 .20 2.20 .20 3.80 .20 2.20 .20 1.20 .20 .20 1.20 .20 2.20 .20 3.80 .20 2.20 .20 1.20 .20 .20 1.20 .20 2.20 .20 3.80 .20 2.20 .20 1.20 .20 .20 1.20 .20 2.20 .20 3.80 .20 2.20 .20 1.20 .20 .20 1.20 .20 2.20 .20 3.80 .20 2.20 .20 1.20 .20

31 30 82 81 31 30 82 81 31 30 82 81 31 30 82 81 31 30 82 81
WET WET WET WET WET WET WET WET WET WET
.20 1.85

.20 1.85

.20 1.85

.20 1.85

.20 1.85
SHAFT ELEVATOR ELEVATOR SHAFT SHAFT ELEVATOR ELEVATOR SHAFT SHAFT ELEVATOR ELEVATOR SHAFT SHAFT ELEVATOR ELEVATOR SHAFT SHAFT ELEVATOR ELEVATOR SHAFT

TENANT TENANT TENANT TENANT TENANT TENANT TENANT TENANT TENANT TENANT
3.90

3.90

3.90

3.90

3.90
SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT
32 80 32 80 32 80 32 80 32 80
8.60

8.60

8.60

8.60

8.60
33 79 33 79 33 79 33 79 33 79
1.85

1.85

1.85

1.85

1.85
ELEC ELEVATOR ELEVATOR ELEC ELEC ELEVATOR ELEVATOR ELEC ELEC ELEVATOR ELEVATOR ELEC ELEC ELEVATOR ELEVATOR ELEC ELEC ELEVATOR ELEVATOR ELEC
SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT
X.1 LOBBY
TO LOBBY
FROM LOBBY
TO LOBBY
FROM LOBBY
.20

.20

.20

.20

.20
BICYCLE BICYCLE BICYCLE BICYCLE BICYCLE BICYCLE BICYCLE BICYCLE BICYCLE BICYCLE

FROM
PARKING AREA UP UP PARKING AREA ABOVE TO
PARKING AREA UP UP PARKING AREA ABOVE FROM
PARKING AREA UP UP PARKING AREA ABOVE TO
PARKING AREA UP UP PARKING AREA ABOVE FROM
PARKING AREA UP UP PARKING AREA
TO
34 78 34 78 34 78 34 78 34 78
3.30

3.30

3.30

3.30

3.30
ABOVE SHAFT SHAFT
ABOVE SHAFT SHAFT
ABOVE SHAFT SHAFT
ABOVE SHAFT SHAFT
ABOVE SHAFT SHAFT
ABOVE
DN DN DN DN DN DN DN DN DN DN
.60

.60

.60

.60

.60
.30

.30

.30

.30

.30
3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00
36 35 76 77 36 35 76 77 36 35 76 77 36 35 76 77 36 35 76 77
.30

.30

.30

.30

.30
.60

.60

.60

.60

.60
DN DN DN DN DN DN DN DN DN DN
3.30

3.30

3.30

3.30

3.30
37 SHAFT SHAFT 75 37 SHAFT SHAFT 75 37 SHAFT SHAFT 75 37 SHAFT SHAFT 75 37 SHAFT SHAFT 75
BICYCLE UP UP BICYCLE BICYCLE UP UP BICYCLE BICYCLE UP UP BICYCLE BICYCLE UP UP BICYCLE BICYCLE UP UP BICYCLE
PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA PARKING AREA
.20

.20

.20

.20

.20
8.60

8.60

8.60

8.60

8.60
39 38 73 74 39 38 73 74 39 38 73 74 39 38 73 74 39 38 73 74
6.50

6.50

6.50

6.50

6.50
41 40 71 72 41 40 71 72 41 40 71 72 41 40 71 72 41 40 71 72
.80

.80

.80

.80

.80
43 42 69 70 43 42 69 70 43 42 69 70 43 42 69 70 43 42 69 70
5.40

5.40

5.40

5.40

5.40
53 55 57 59 53 55 57 59 53 55 57 59 53 55 57 59 53 55 57 59
6.00

6.00

6.00

6.00

6.00
44 68 44 68 44 68 44 68 44 68
.90

.90

.90

.90

.90
.20 2.80 .90 2.90 7.60 .90 4.60 .50 5.95 .70 7.35 .50 4.60 .90 7.60 2.90 .90 2.80 .20 FROM FROM .20 2.80 .90 2.90 7.60 .90 4.60 .50 5.95 .70 7.35 .50 4.60 .90 7.60 2.90 .90 2.80 .20 TO TO .20 2.80 .90 2.90 7.60 .90 4.60 .50 5.95 .70 7.35 .50 4.60 .90 7.60 2.90 .90 2.80 .20 FROM FROM .20 2.80 .90 2.90 7.60 .90 4.60 .50 5.95 .70 7.35 .50 4.60 .90 7.60 2.90 .90 2.80 .20 TO TO .20 2.80 .90 2.90 7.60 .90 4.60 .50 5.95 .70 7.35 .50 4.60 .90 7.60 2.90 .90 2.80 .20 FROM
TO BELOW
BELOW BELOW BELOW BELOW BELOW BELOW BELOW BELOW BELOW
7.425

7.425

7.425

7.425

7.425
7.43

7.43

7.43

7.43

7.43
6.600

6.600

6.600

6.600

6.600
X.3
.70

.70

.70

.70

.70
56 58 60 56 58 60 56 58 60 56 58 60 56 58 60
6.00

6.00

6.00

6.00

6.00
45 46 47 48 49 50 51 52 54 61 62 63 64 65 66 67 45 46 47 48 49 50 51 52 54 61 62 63 64 65 66 67 45 46 47 48 49 50 51 52 54 61 62 63 64 65 66 67 45 46 47 48 49 50 51 52 54 61 62 63 64 65 66 67 45 46 47 48 49 50 51 52 54 61 62 63 64 65 66 67
5.30

5.30

5.30

5.30

5.30
1.30 .20

1.30 .20

1.30 .20

1.30 .20

1.30 .20

.27
.34

MECHANICAL MECHANICAL MECHANICAL MECHANICAL MECHANICAL


SHAFT SHAFT SHAFT SHAFT SHAFT

.50 64.00 64.00 64.00 64.00 64.00 11.82

BASEMENT 01 FLOOR

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS TOTAL BUILD UP AREA . 33,382.72 M² . 93.81% . 575 PARKING


N

GROUND FLOOR BUILT-UP AREA = 19,916.55 sq.m. GROUND FLOOR RENTABLE AREA = 16,514.10 sq.m.

336.71

9.76 52.00 12.00 52.00 12.00 52.00 12.00 52.00 12.00 52.00 18.96
676.79 676.06 675.80 675.60 674.20 673.96 673.85 673.71 673.43 673.32673.21 673.12 672.66 672.49 672.26 672.14 671.94 671.68 671.52 Y.1 670.90
676.60 676.40 676.18 675.45 675.23 674.97 674.85 674.63 674.45
673.96 15.00 M WIDE ROAD672.83 671.37 671.15 670.99

47.00
670.84 670.73 670.26
670.44

5.00
8.64

8.00
STORAGE SPACES
5.59

5.59

5.59

5.59

5.59
+670.05
3.00

3.00

3.00

3.00

3.00

9.08
8.29 1.20 .30 25.60 .20 25.60 .30 1.20 1.20 .30 25.60 .20 25.60 .30 1.20 1.20 .30 25.60 .20 25.60 .30 1.20 1.20 .30 25.60 .20 25.60 .30 1.20 1.20 .30 25.60 .20 25.60 .30 1.20
.30

.30

.30

.30

.30
669.86

X.2 66
19.20

19.20
FRESH AIR MECHANICAL

FRESH AIR MECHANICAL

FRESH AIR MECHANICAL

FRESH AIR MECHANICAL

FRESH AIR MECHANICAL

FRESH AIR MECHANICAL

FRESH AIR MECHANICAL

FRESH AIR MECHANICAL

FRESH AIR MECHANICAL

FRESH AIR MECHANICAL


SHAFT WITH LOUVERS

SHAFT WITH LOUVERS

SHAFT WITH LOUVERS

SHAFT WITH LOUVERS

SHAFT WITH LOUVERS

SHAFT WITH LOUVERS

SHAFT WITH LOUVERS

SHAFT WITH LOUVERS

SHAFT WITH LOUVERS

SHAFT WITH LOUVERS


18.60

18.60

18.60

18.60

18.60

18.60

18.60

18.60

18.60

18.60
RAMP RAMP RAMP RAMP 65
UP UP UP UP

OFFICE E.108 OFFICE E.107 OFFICE D.108 OFFICE D.107 OFFICE C.108 OFFICE C.107 OFFICE B.108 OFFICE B.107 OFFICE A.108 OFFICE A.107
+668.65 64 669.61

UP UP UP UP UP UP UP UP UP UP
63
PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS
AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE
(TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT)
DN DN DN DN DN DN DN DN DN DN
3.00

3.00
62
.30

.30

.30

.30

.30

.30

.30

.30

.30

.30
3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00
.30 17.30 .20 6.10 .20 3.80 .20 6.10 .20 17.30 .30 .20 6.10 .20 3.80 .20 6.10 .20 .20 6.10 .20 3.80 .20 6.10 .20 .20 6.10 .20 3.80 .20 6.10 .20 .20 6.10 .20 3.80 .20 6.10 .20
61
.30

.30

.30

.30

.30

.30

.30

.30

.30

.30
DN DN DN DN DN DN DN DN DN DN
PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS
3.30

3.30

3.30

3.30

3.30

3.30

3.30

3.30

3.30

3.30
AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE
(TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT)
60
UP UP UP UP UP UP UP UP UP UP
669.28
.20

.20

.20

.20

.20

.20

.20

.20

.20

.20
+673.40 ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC
1.85

1.85

1.85

1.85

1.85

1.85

1.85

1.85

1.85

1.85
SHAFT ELEVATOR ELEVATOR SHAFT SHAFT ELEVATOR ELEVATOR SHAFT SHAFT ELEVATOR ELEVATOR SHAFT SHAFT ELEVATOR ELEVATOR SHAFT SHAFT ELEVATOR ELEVATOR SHAFT

TENANT ELEVATOR TENANT TENANT ELEVATOR TENANT TENANT ELEVATOR TENANT TENANT ELEVATOR TENANT TENANT ELEVATOR TENANT 59
.20

.20

.20

.20

.20

.20

.20

.20

.20

.20
SHAFT LOBBY SHAFT SHAFT LOBBY SHAFT SHAFT LOBBY SHAFT SHAFT LOBBY SHAFT SHAFT LOBBY SHAFT

+672.30
1.85

1.85

1.85

1.85

1.85

1.85

1.85

1.85

1.85

1.85
ELEVATOR ELEVATOR ELEVATOR ELEVATOR ELEVATOR ELEVATOR ELEVATOR ELEVATOR ELEVATOR ELEVATOR
19.20

19.20
WET WET WET WET WET WET WET WET WET WET
SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT
.20

.20

.20

.20

.20

.20

.20

.20

.20

.20
+667.90 +667.90 +667.90 +667.90 58
18.60

18.60

18.60

18.60

18.60

18.60

18.60

18.60

18.60

18.60

30.00 M WIDE ROAD


OFFICE E.106 OFFICE E.105 OFFICE D.106 OFFICE D.105 OFFICE C.106 OFFICE C.105 OFFICE B.106 OFFICE B.105 OFFICE A.106 OFFICE A.105 57
11.00

11.00

11.00

11.00

11.00

11.00

11.00

11.00

11.00

11.00
56
NEIGHBOR

55
85.80

85.80
3.00

3.00
.30

.30

.30

.30

.30

.30

.30

.30

.30

.30
107.11

106.39
+669.00 +669.00 +669.00 +669.00 +667.90 54 668.77
3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00
6.94 1.20 .30 23.60 .20 3.80 .20 23.60 .30 1.20 1.20 .30 23.60 .20 3.80 .20 23.60 .30 1.20 1.20 .30 23.60 .20 3.80 .20 23.60 .30 1.20 1.20 .30 23.60 .20 3.80 .20 23.60 .30 1.20 1.20 .30 23.60 .20 3.80 .20 23.60 .30 1.20
.30

.30

.30

.30

.30

.30

.30

.30

.30

.30
UP UP UP UP UP 53

52
668.55
11.00

11.00

11.00

11.00

11.00

11.00

11.00

11.00

11.00

11.00
19.20

19.20
51
+668.65
18.60

18.60

18.60

18.60

18.60

18.60

18.60

18.60

18.60

18.60
50
OFFICE E.104 OFFICE E.103 OFFICE D.104 OFFICE D.103 OFFICE C.104 OFFICE C.103 OFFICE B.104 OFFICE B.103 OFFICE A.104 OFFICE A.103
.20

.20

.20

.20

.20

.20

.20

.20

.20

.20
WET WET WET WET WET WET WET WET WET WET
1.85

1.85

1.85

1.85

1.85

1.85

1.85

1.85

1.85

1.85
SHAFT ELEVATOR ELEVATOR SHAFT SHAFT ELEVATOR ELEVATOR SHAFT SHAFT ELEVATOR ELEVATOR SHAFT SHAFT ELEVATOR ELEVATOR SHAFT SHAFT ELEVATOR ELEVATOR SHAFT

TENANT ELEVATOR TENANT TENANT ELEVATOR TENANT TENANT ELEVATOR TENANT TENANT ELEVATOR TENANT TENANT ELEVATOR TENANT
49
.20

.20

.20

.20

.20

.20

.20

.20

.20

.20
SHAFT LOBBY SHAFT SHAFT LOBBY SHAFT SHAFT LOBBY SHAFT SHAFT LOBBY SHAFT SHAFT LOBBY SHAFT
1.85

1.85

1.85

1.85

1.85

1.85

1.85

1.85

1.85

1.85
ELEC ELEVATOR ELEVATOR ELEC ELEC ELEVATOR ELEVATOR ELEC ELEC ELEVATOR ELEVATOR ELEC ELEC ELEVATOR ELEVATOR ELEC ELEC ELEVATOR ELEVATOR ELEC
SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT
X.1
.20

.20

.20

.20

.20

.20

.20

.20

.20

.20
UP UP UP UP UP UP UP UP UP UP
48
UP PROVISION FOR TOILETS PROVISION FOR TOILETS UP PROVISION FOR TOILETS PROVISION FOR TOILETS UP PROVISION FOR TOILETS PROVISION FOR TOILETS UP PROVISION FOR TOILETS PROVISION FOR TOILETS UP PROVISION FOR TOILETS PROVISION FOR TOILETS
668.13
3.30

3.30

3.30

3.30

3.30

3.30

3.30

3.30

3.30

3.30
AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE
(TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT)
DN DN DN DN DN DN DN DN DN DN
3.00

3.00
.30

.30

.30

.30

.30

.30

.30

.30

.30

.30
17.30 .20 6.10 .20 3.80 .20 6.10 .20 17.30 19.35 .20 4.05 .20 3.80 .20 4.05 .20 19.35 19.35 .20 4.05 .20 3.80 .20 4.05 .20 19.35 19.35 .20 4.05 .20 3.80 .20 4.05 .20 19.35 19.35 .20 4.05 .20 3.80 .20 4.05 .20 19.35 47
3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00
1.67 4.60 1.20 .30 17.30 .20 6.10 6.10 .20 17.30 .30 1.20 4.60 .40 4.60 1.20 .30 23.60 23.60 .30 1.20 1.20 .30 23.60 23.60 .30 1.20 1.20 .30 23.60 23.60 .30 1.20 1.20 .30 23.60 23.60 .30 1.20 4.60 12.24
.30

.30

.30

.30

.30

.30

.30

.30

.30

.30
46
DN DN DN DN DN DN DN DN
SHAFT ABOVE

SHAFT ABOVE

SHAFT ABOVE

SHAFT ABOVE

SHAFT ABOVE

SHAFT ABOVE

SHAFT ABOVE

SHAFT ABOVE

SHAFT ABOVE

SHAFT ABOVE
PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS
AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE
(TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT)
STEEL STRUCTURE STEEL STRUCTURE
UP UP UP UP UP UP UP UP
(PROVISION FOR ELEVATOR
AND STAIRCASE)
(PROVISION FOR ELEVATOR
AND STAIRCASE) 45

667.80
44
19.20

19.20
18.60

11.60

11.60

11.60

11.60

11.60

9.09
OFFICE E.102 OFFICE E.101 OFFICE D.102 OFFICE D.101 OFFICE C.102 OFFICE C.101 OFFICE B.102 OFFICE B.101 OFFICE A.102 OFFICE A.101
FROM FROM
BELOW TO BELOW BELOW TO BELOW

FROM FROM FROM

10
TO BELOW BELOW TO BELOW BELOW TO BELOW BELOW
.50.30

.9
UP UP UP UP UP

BUILDING E BUILDING D BUILDING C BUILDING B BUILDING A

0
X.3 Y.R6 +671.20 +671.20 Y.R5 +670.10 +670.10 Y.R4 +669.00 +669.00 Y.R3 +667.90 +667.90 Y.R2 Y.R1

+672.30 DROP-OFF DROP-OFF DROP-OFF DROP-OFF DROP-OFF


6.00

12.59
12.67

+672.30 +671.20 +670.10 +669.00 +667.90 +667.60

G 4 5 6 13 14 15 G G 22 23 24 31 32 33 G G 40 41 42 43

1 2 3
PARKING 7 8 9 10 11 12
PARKING 16 17 18 19 20 21
PARKING 25 26 27 28 29 30
PARKING 34 35 36 37 38 39
PARKING PARKING
LOW
SHRUBS
PARKING PARKING LOW
SHRUBS
LOW
SHRUBS PARKING PARKING LOW
SHRUBS
LOW
SHRUBS PARKING PARKING LOW
SHRUBS
LOW
SHRUBS PARKING PARKING LOW
SHRUBS
LOW
SHRUBS
PARKING LOW
SHRUBS
LOW
SHRUBS
ENTRY ENTRY ENTRY ENTRY ENTRY
5.82

ENTRY LOW
SHRUBS
LOW
SHRUBS EXIT EXIT LOW
SHRUBS
LOW
SHRUBS
ENTRY ENTRY LOW
SHRUBS
LOW
SHRUBS
EXIT EXIT LOW
SHRUBS
LOW
SHRUBS
ENTRY ENTRY LOW
SHRUBS
LOW
SHRUBS
EXIT LOW
SHRUBS

SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK


672.02 ROAD 671.95 ROAD 670.86 ROAD 669.78 ROAD 668.68 ROAD 667.60 ROAD 666.93 ROAD

666.96
12.02
6.50 52.00 12.00 52.00 12.00 52.00 12.00 52.00 12.00 52.00 17.82
672.42 672.07 671.92 671.74 671.57 671.11
671.34
672.20 670.81 670.62 670.47 670.30 670.13 669.97 669.85 669.69 669.48 669.31 669.21 669.05 668.91 668.73 668.59 668.45 668.29 668.12 667.93 667.76 667.64 666.78 666.76
667.49 667.34 667.17 667.04 666.91

666.68

60.00 M WIDE ROAD

GROUND FLOOR

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS TOTAL BUILD UP AREA . 19,916.55 M² . 55.97% . 66 PARKING


N

FIRST FLOOR BUILT-UP AREA = 22,925.00 sq.m. FIRST FLOOR RENTABLE AREA = 19,580.40 sq.m.

336.71

7.76 56.00 8.00 56.00 8.00 56.00 8.00 56.00 8.00 56.00 16.96
676.79 676.06 675.80 675.60 674.20 673.96 673.85 673.71 673.43 673.32673.21 673.12 672.66 672.49 672.26 672.14 671.94 671.68 671.52 Y.1 670.90
675.45 674.85 674.63 674.45 670.99
676.60 676.40 676.18
28.00 28.00 675.23 674.97 28.00 28.00 673.96 28.00 28.00672.83 28.00 28.00 671.37 671.15 28.00 28.00
76.00 670.84 670.73 670.44 670.26

5.00
6.69

6.05
SCECO

1.30
.30

.30

.30

.30

.30
669.86
27.60 27.60 27.60 27.60 27.60 27.60 27.60 27.60 27.60 27.60
21.15

21.15
X.2
OFFICE E.212 OFFICE E.211 OFFICE D.212 OFFICE D.211 OFFICE C.212 OFFICE C.211 OFFICE B.212 OFFICE B.211 OFFICE A.212 OFFICE A.211
20.55

20.55

20.55

20.55

20.55
669.61

UP UP UP UP UP UP UP UP UP UP
PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS
SHAFT

SHAFT

SHAFT

SHAFT

SHAFT

SHAFT

SHAFT

SHAFT

SHAFT

SHAFT
AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE
(TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT)
DN DN DN DN DN DN DN DN DN DN
3.00

3.00
.30

.30

.30

.30

.30
.60 .60 .60 .60 .60 .60 .60 .60 .60 .60
.30 13.90 .20 .20 2.20 .20 2.00 .20 6.10 .20 3.80 .20 6.10 .20 2.00 .20 2.20 .20 .20 13.90 .30 .30 13.90 .20 .20 2.20 .20 2.00 .20 6.10 .20 3.80 .20 6.10 .20 2.00 .20 2.20 .20 .20 13.90 .30 .30 13.90 .20 .20 2.20 .20 2.00 .20 6.10 .20 3.80 .20 6.10 .20 2.00 .20 2.20 .20 .20 13.90 .30 .30 13.90 .20 .20 2.20 .20 2.00 .20 6.10 .20 3.80 .20 6.10 .20 2.00 .20 2.20 .20 .20 13.90 .30 .30 13.90 .20 .20 2.20 .20 2.00 .20 6.10 .20 3.80 .20 6.10 .20 2.00 .20 2.20 .20 .20 13.90 .30
3.00

3.00

3.00

3.00

3.00
.30

.30

.30

.30

.30
DN DN DN DN DN DN DN DN DN DN
PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS
AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE
(TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT)
UP UP UP UP UP UP UP UP UP UP
669.28
ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC

OFFICE E.210 SHAFT ELEVATOR ELEVATOR SHAFT


OFFICE E.209 OFFICE D.210 SHAFT ELEVATOR ELEVATOR SHAFT
OFFICE D.209 OFFICE C.210 SHAFT ELEVATOR ELEVATOR SHAFT
OFFICE C.209 OFFICE B.210 SHAFT ELEVATOR ELEVATOR SHAFT
OFFICE B.209 OFFICE A.210 SHAFT ELEVATOR ELEVATOR SHAFT
OFFICE A.209
9.15

9.15

9.15

9.15

9.15
TENANT ELEVATOR TENANT TENANT ELEVATOR TENANT TENANT ELEVATOR TENANT TENANT ELEVATOR TENANT TENANT ELEVATOR TENANT
SHAFT LOBBY SHAFT SHAFT LOBBY SHAFT SHAFT LOBBY SHAFT SHAFT LOBBY SHAFT SHAFT LOBBY SHAFT
27.25

27.25

27.25

27.25

27.25
ELEVATOR ELEVATOR ELEVATOR ELEVATOR ELEVATOR ELEVATOR ELEVATOR ELEVATOR ELEVATOR ELEVATOR
19.20

19.20
WET WET WET WET WET WET WET WET WET WET
SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT
.30

.30

.30

.30

.30
OFFICE E.208 OFFICE E.207 OFFICE D.208 OFFICE D.207 OFFICE C.208 OFFICE C.207 OFFICE B.208 OFFICE B.207 OFFICE A.208 OFFICE A.207
9.15

9.15

9.15

9.15

9.15
PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS
AND KITCHENETTE
(TENANT IMPROVEMENT) +677.10 AND KITCHENETTE
(TENANT IMPROVEMENT)
AND KITCHENETTE
(TENANT IMPROVEMENT) +676.00 AND KITCHENETTE
(TENANT IMPROVEMENT)
AND KITCHENETTE
(TENANT IMPROVEMENT) +674.90 AND KITCHENETTE
(TENANT IMPROVEMENT)
AND KITCHENETTE
(TENANT IMPROVEMENT) +673.80 AND KITCHENETTE
(TENANT IMPROVEMENT)
AND KITCHENETTE
(TENANT IMPROVEMENT) +672.70 AND KITCHENETTE
(TENANT IMPROVEMENT)

89.70
90.20

3.00

3.00
.30

.30

.30

.30

.30
107.11

106.39
668.77
3.00

3.00

3.00

3.00

3.00
.30

.30

.30

.30

.30
25.60 25.60 25.60 25.60 25.60 25.60 25.60 25.60 25.60 25.60
PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS
AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE
(TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT)
9.15

9.15

9.15

9.15

9.15
OFFICE E.206 OFFICE E.205 OFFICE D.206 OFFICE D.205 OFFICE C.206 OFFICE C.205 OFFICE B.206 OFFICE B.205 OFFICE A.206 OFFICE A.205 668.55
19.20

19.20
.30

.30

.30

.30

.30
27.25

27.25

27.25

27.25

27.25
WET WET WET WET WET WET WET WET WET WET
SHAFT ELEVATOR ELEVATOR SHAFT SHAFT ELEVATOR ELEVATOR SHAFT SHAFT ELEVATOR ELEVATOR SHAFT SHAFT ELEVATOR ELEVATOR SHAFT SHAFT ELEVATOR ELEVATOR SHAFT

TENANT ELEVATOR TENANT TENANT ELEVATOR TENANT TENANT ELEVATOR TENANT TENANT ELEVATOR TENANT TENANT ELEVATOR TENANT
SHAFT LOBBY SHAFT SHAFT LOBBY SHAFT SHAFT LOBBY SHAFT SHAFT LOBBY SHAFT SHAFT LOBBY SHAFT

OFFICE E.204 OFFICE E.203 OFFICE D.204 OFFICE D.203 OFFICE C.204 OFFICE C.203 OFFICE B.204 OFFICE B.203 OFFICE A.204 OFFICE A.203
9.15

9.15

9.15

9.15

9.15
ELEC ELEVATOR ELEVATOR ELEC ELEC ELEVATOR ELEVATOR ELEC ELEC ELEVATOR ELEVATOR ELEC ELEC ELEVATOR ELEVATOR ELEC ELEC ELEVATOR ELEVATOR ELEC
SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT
X.1 UP UP UP UP UP UP UP UP UP UP
PROVISION FOR TOILETS
AND KITCHENETTE
(TENANT IMPROVEMENT)
SHAFT SHAFT
PROVISION FOR TOILETS
AND KITCHENETTE
(TENANT IMPROVEMENT)
PROVISION FOR TOILETS
AND KITCHENETTE
(TENANT IMPROVEMENT)
SHAFT SHAFT
PROVISION FOR TOILETS
AND KITCHENETTE
(TENANT IMPROVEMENT)
PROVISION FOR TOILETS
AND KITCHENETTE
(TENANT IMPROVEMENT)
SHAFT SHAFT
PROVISION FOR TOILETS
AND KITCHENETTE
(TENANT IMPROVEMENT)
PROVISION FOR TOILETS
AND KITCHENETTE
(TENANT IMPROVEMENT)
SHAFT SHAFT
PROVISION FOR TOILETS
AND KITCHENETTE
(TENANT IMPROVEMENT)
PROVISION FOR TOILETS
AND KITCHENETTE
(TENANT IMPROVEMENT)
SHAFT SHAFT
PROVISION FOR TOILETS
AND KITCHENETTE
(TENANT IMPROVEMENT)
668.13
DN DN DN DN DN DN DN DN DN DN
3.00

3.00
.30

.30

.30

.30

.30
3.00

3.00

3.00

3.00

3.00
.60 .60 .60 .60 .60 .60 .60 .60 .60 .60
.30 13.90 .20 .20 2.20 .20 2.00 .20 6.10 .20 3.80 .20 6.10 .20 2.00 .20 2.20 .20 .20 13.90 .30 .30 13.90 .20 .20 2.20 .20 2.00 .20 6.10 .20 3.80 .20 6.10 .20 2.00 .20 2.20 .20 .20 13.90 .30 .30 13.90 .20 .20 2.20 .20 2.00 .20 6.10 .20 3.80 .20 6.10 .20 2.00 .20 2.20 .20 .20 13.90 .30 .30 13.90 .20 .20 2.20 .20 2.00 .20 6.10 .20 3.80 .20 6.10 .20 2.00 .20 2.20 .20 .20 13.90 .30 .30 13.90 .20 .20 2.20 .20 2.00 .20 6.10 .20 3.80 .20 6.10 .20 2.00 .20 2.20 .20 .20 13.90 .30
.30

.30

.30

.30

.30
2.33
2.33
DN DN DN DN DN DN DN DN DN DN
PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS PROVISION FOR TOILETS
SHAFT

SHAFT

SHAFT

SHAFT

SHAFT

SHAFT

SHAFT

SHAFT

SHAFT

SHAFT
AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE
(TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT)
UP UP UP UP UP UP UP UP UP UP

667.80

21.15
21.65

20.55

20.55

20.55

20.55

20.55
OFFICE E.202 OFFICE E.201 OFFICE D.202 OFFICE D.201 OFFICE C.202 OFFICE C.201 OFFICE B.202 OFFICE B.201 OFFICE A.202 OFFICE A.201

27.60 27.60 27.60 27.60 27.60 27.60 27.60 27.60 27.60 27.60
.30

.30

.30

.30

.30

10.64
10.22

+673.20 +672.10 +671.00 +669.90 +668.80 +668.50


+674.92 +673.40 +673.40 +672.72 +672.72 +671.20 +671.20 +670.52 +670.52 +669.00 +669.00

+673.40 +672.30 +671.20 +670.08 +669.00 +668.70

4.50
.00 56.00 8.00 56.00 8.00 56.00 8.00 56.00 8.00 56.00 15.82
672.42 672.07 671.92 671.74 671.57 671.11
671.34
672.20 670.81 670.62 670.47 670.30 670.13 669.97 669.85 669.69 669.48 669.31 669.21 669.05 668.91 668.73 668.59 668.45 668.29 668.12 667.93 667.76 667.64 666.78 666.76
667.49 667.34 667.17 667.04 666.91

666.68

FIRST FLOOR

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS TOTAL BUILD UP AREA . 22,925.00 M² . 64.42%


N

FIRST FLOOR BUILT-UP AREA = 11,389.50 sq.m. ROOF FLOOR RENTABLE AREA = 8,323.20 sq.m.

336.71

7.76 56.00 8.00 56.00 8.00 56.00 8.00 56.00 8.00 56.00
+676.80
16.96

5.50 45.00 5.50 5.50 45.00 5.50 5.50 45.00 5.50 5.50 45.00 5.50 5.50 45.00 5.50
Y.1
22.50 22.50 22.50 22.50 22.50 22.50 22.50 22.50 22.50 22.50
6.64

6.00
SCECO ROOF
+676.50
11.45

11.45
11.40

11.40

11.40

11.40

11.40
X.2
.30

.30

.30

.30

.30

.30

.30

.30

.30

.30
3.50 3.506.25

3.50 3.506.25
OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE
5.65

5.65

5.65

5.65

5.65

5.65

5.65

5.65

5.65

5.65
E.312 E.311 D.312 D.311 C.312 C.311 B.312 B.311 A.312 A.311
.30

.30

.30

.30

.30

.30

.30

.30

.30

.30
ROOF PROVISION FOR TOILETS PROVISION FOR TOILETS
ROOF ROOF PROVISION FOR TOILETS PROVISION FOR TOILETS
ROOF ROOF PROVISION FOR TOILETS PROVISION FOR TOILETS
ROOF ROOF PROVISION FOR TOILETS PROVISION FOR TOILETS
ROOF ROOF PROVISION FOR TOILETS PROVISION FOR TOILETS
ROOF
AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE
3.50

3.50

3.50

3.50

3.50

3.50

3.50

3.50

3.50

3.50
GARDEN (TENANT IMPROVEMENT)
DN DN
(TENANT IMPROVEMENT) GARDEN GARDEN (TENANT IMPROVEMENT)
DN DN
(TENANT IMPROVEMENT) GARDEN GARDEN (TENANT IMPROVEMENT)
DN DN
(TENANT IMPROVEMENT) GARDEN GARDEN (TENANT IMPROVEMENT)
DN DN
(TENANT IMPROVEMENT) GARDEN GARDEN (TENANT IMPROVEMENT)
DN DN
(TENANT IMPROVEMENT) GARDEN
3.00

3.00
.20 3.80 .20 .20 3.80 .20 .20 3.80 .20 .20 3.80 .20 .20 3.80 .20
3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00
.60 .60 .60 .60 .60 .60 .60 .60 .60 .60
.20 .20 2.20 .20 2.00 .20 6.10 6.10 .20 2.00 .20 2.20 .20 .20 .20 .20 2.20 .20 2.00 .20 6.10 6.10 .20 2.00 .20 2.20 .20 .20 .20 .20 2.20 .20 2.00 .20 6.10 6.10 .20 2.00 .20 2.20 .20 .20 .20 .20 2.20 .20 2.00 .20 6.10 6.10 .20 2.00 .20 2.20 .20 .20 .20 .20 2.20 .20 2.00 .20 6.10 6.10 .20 2.00 .20 2.20 .20 .20
.30

.30

.30

.30

.30

.30

.30

.30

.30

.30
DN DN DN DN DN DN DN DN DN DN

ROOF PROVISION FOR TOILETS PROVISION FOR TOILETS


ROOF ROOF PROVISION FOR TOILETS PROVISION FOR TOILETS
ROOF ROOF PROVISION FOR TOILETS PROVISION FOR TOILETS
ROOF ROOF PROVISION FOR TOILETS PROVISION FOR TOILETS
ROOF ROOF PROVISION FOR TOILETS PROVISION FOR TOILETS
ROOF
3.50

3.50

3.50

3.50

3.50

3.50

3.50

3.50

3.50

3.50
3.20

3.20

3.20

3.20

3.20

3.20

3.20

3.20

3.20

3.20
AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE
(TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT)

GARDEN GARDEN GARDEN GARDEN GARDEN GARDEN GARDEN GARDEN GARDEN GARDEN
.30

.30

.30

.30

.30

.30

.30

.30

.30

.30
ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC ELEC
SHAFT ELEVATOR ELEVATOR SHAFT SHAFT ELEVATOR ELEVATOR SHAFT SHAFT ELEVATOR ELEVATOR SHAFT SHAFT ELEVATOR ELEVATOR SHAFT SHAFT ELEVATOR ELEVATOR SHAFT

5.50 .30 16.90


OFFICE TENANT
SHAFT
ELEVATOR
LOBBY
TENANT
SHAFT
OFFICE 16.90 .30 5.50 5.50 .30 16.90
OFFICE TENANT
SHAFT
ELEVATOR
LOBBY
TENANT
SHAFT
OFFICE 16.90 .30 5.50 5.50 .30 16.90
OFFICE TENANT
SHAFT
ELEVATOR
LOBBY
TENANT
SHAFT
OFFICE 16.90 .30 5.50 5.50 .30 16.90
OFFICE TENANT
SHAFT
ELEVATOR
LOBBY
TENANT
SHAFT
OFFICE 16.90 .30 5.50 5.50 .30 16.90 OFFICE TENANT
SHAFT
ELEVATOR
LOBBY
TENANT
SHAFT OFFICE 16.90 .30 5.50
5.65

5.65

5.65

5.65

5.65

5.65

5.65

5.65

5.65

5.65
E.310 E.309 D.310 D.309 C.310 C.309 B.310 B.309
27.25

27.25

27.25

27.25

27.25
ELEVATOR ELEVATOR ELEVATOR ELEVATOR ELEVATOR ELEVATOR ELEVATOR ELEVATOR ELEVATOR ELEVATOR
3.50 3.50 12.20

3.50 3.50 12.20


WET WET WET WET WET WET WET WET WET WET
SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT
A.310 SHAFT SHAFT
A.309
.30

.30

.30

.30

.30

.30

.30

.30

.30

.30
OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE
5.65

5.65

5.65

5.65

5.65

5.65

5.65

5.65

5.65

5.65
E.308 E.307 D.308 D.307 C.308 C.307 B.308 B.307 A.308 A.307
.30

.30

.30

.30

.30

.30

.30

.30

.30

.30
ROOF PROVISION FOR TOILETS PROVISION FOR TOILETS
ROOF ROOF PROVISION FOR TOILETS PROVISION FOR TOILETS
ROOF ROOF PROVISION FOR TOILETS PROVISION FOR TOILETS
ROOF ROOF PROVISION FOR TOILETS PROVISION FOR TOILETS
ROOF ROOF PROVISION FOR TOILETS PROVISION FOR TOILETS
ROOF
AND KITCHENETTE
+681.20 AND KITCHENETTE AND KITCHENETTE
+680.10 AND KITCHENETTE AND KITCHENETTE
+679.00 AND KITCHENETTE AND KITCHENETTE
+677.90 AND KITCHENETTE AND KITCHENETTE
+676.80 AND KITCHENETTE
3.50

3.50

3.50

3.50

3.50

3.50

3.50

3.50

3.50

3.50
GARDEN (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) GARDEN GARDEN (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) GARDEN GARDEN (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) GARDEN GARDEN (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) GARDEN GARDEN (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) GARDEN
89.80

66.90

66.90

90.25
3.00

3.00
107.11

106.39
3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00
6.10 6.10 6.10 6.10 6.10 6.10 6.10 6.10 6.10 6.10

ROOF PROVISION FOR TOILETS PROVISION FOR TOILETS


ROOF ROOF PROVISION FOR TOILETS PROVISION FOR TOILETS
ROOF ROOF PROVISION FOR TOILETS PROVISION FOR TOILETS
ROOF ROOF PROVISION FOR TOILETS PROVISION FOR TOILETS
ROOF ROOF PROVISION FOR TOILETS PROVISION FOR TOILETS
ROOF
3.50

3.50

3.50

3.50

3.50

3.50

3.50

3.50

3.50

3.50
AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE AND KITCHENETTE
(TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT)

GARDEN GARDEN GARDEN GARDEN GARDEN GARDEN GARDEN GARDEN GARDEN GARDEN
.30

.30

.30

.30

.30

.30

.30

.30

.30

.30
OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE
5.65

5.65

5.65

5.65

5.65

5.65

5.65

5.65

5.65

5.65
E.306 E.305 D.306 D.305 C.306 C.305 B.306 B.305
6.253.50 3.50 12.20

6.253.50 3.50 12.20


A.306 A.305
.30

.30

.30

.30

.30

.30

.30

.30

.30

.30
OFFICE OFFICE OFFICE OFFICE OFFICE
27.25

27.25

27.25

27.25

27.25
WET WET WET WET WET WET WET WET WET WET

OFFICE SHAFT SHAFT


OFFICE SHAFT SHAFT
OFFICE SHAFT SHAFT
OFFICE SHAFT SHAFT
OFFICE SHAFT SHAFT
5.65

5.65

5.65

5.65

5.65

5.65

5.65

5.65

5.65

5.65
ELEVATOR ELEVATOR ELEVATOR ELEVATOR ELEVATOR ELEVATOR ELEVATOR ELEVATOR ELEVATOR ELEVATOR

E.304
TENANT
SHAFT

ELEC ELEVATOR
ELEVATOR
LOBBY

ELEVATOR
TENANT
SHAFT

ELEC
E.303 D.304
TENANT
SHAFT

ELEC ELEVATOR
ELEVATOR
LOBBY

ELEVATOR
TENANT
SHAFT

ELEC
D.303 C.304
TENANT
SHAFT

ELEC ELEVATOR
ELEVATOR
LOBBY

ELEVATOR
TENANT
SHAFT

ELEC
C.303 B.304
TENANT
SHAFT

ELEC ELEVATOR
ELEVATOR
LOBBY

ELEVATOR
TENANT
SHAFT

ELEC
B.303 A.304
TENANT
SHAFT

ELEC ELEVATOR
ELEVATOR
LOBBY

ELEVATOR
TENANT
SHAFT

ELEC
A.303
SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT SHAFT
X.1
.30

.30

.30

.30

.30

.30

.30

.30

.30

.30
ROOF PROVISION FOR TOILETS PROVISION FOR TOILETS
ROOF ROOF PROVISION FOR TOILETS PROVISION FOR TOILETS
ROOF ROOF PROVISION FOR TOILETS PROVISION FOR TOILETS
ROOF ROOF PROVISION FOR TOILETS PROVISION FOR TOILETS
ROOF ROOF PROVISION FOR TOILETS PROVISION FOR TOILETS
ROOF
3.20

3.20

3.20

3.20

3.20

3.20

3.20

3.20

3.20

3.20
AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE
3.50

3.50

3.50

3.50

3.50

3.50

3.50

3.50

3.50

3.50
2.30 3.20 GARDEN (TENANT IMPROVEMENT)
DN DN
(TENANT IMPROVEMENT) GARDEN 3.20 2.30 2.30 3.20 GARDEN (TENANT IMPROVEMENT)
DN DN
(TENANT IMPROVEMENT) GARDEN 3.20 2.30 2.30 3.20 GARDEN (TENANT IMPROVEMENT)
DN DN
(TENANT IMPROVEMENT) GARDEN 3.20 2.30 2.30 3.20 GARDEN (TENANT IMPROVEMENT)
DN DN
(TENANT IMPROVEMENT) GARDEN 3.20 2.30 2.30 3.20 GARDEN (TENANT IMPROVEMENT)
DN DN
(TENANT IMPROVEMENT) GARDEN 3.20 2.30
3.00

3.00
.30

.30

.30

.30

.30

.30

.30

.30

.30

.30
.30 2.90 .20 2.00 .20 6.10 6.10 .20 2.00 .20 2.90 .30 .30 2.90 .20 2.00 .20 6.10 6.10 .20 2.00 .20 2.90 .30 .30 2.90 .20 2.00 .20 6.10 6.10 .20 2.00 .20 2.90 .30 .30 2.90 .20 2.00 .20 6.10 6.10 .20 2.00 .20 2.90 .30 .30 2.90 .20 2.00 .20 6.10 6.10 .20 2.00 .20 2.90 .30
3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00

3.00
.60 .60 .60 .60 .60 .60 .60 .60 .60 .60
5.50 8.70 .20 .20 10.70 .20 3.80 .20 6.10 .20 2.00 .20 2.20 .20 .20 8.70 5.50 5.50 8.70 .20 .20 10.70 .20 3.80 .20 6.10 .20 2.00 .20 2.20 .20 .20 8.70 5.50 5.50 8.70 .20 .20 10.70 .20 3.80 .20 6.10 .20 2.00 .20 2.20 .20 .20 8.70 5.50 5.50 8.70 .20 .20 10.70 .20 3.80 .20 6.10 .20 2.00 .20 2.20 .20 .20 8.70 5.50 5.50 8.70 .20 .20 10.70 .20 3.80 .20 6.10 .20 2.00 .20 2.20 .20 .20 8.70 5.50

DN DN DN DN DN DN DN DN DN DN

ROOF PROVISION FOR TOILETS PROVISION FOR TOILETS


ROOF ROOF PROVISION FOR TOILETS PROVISION FOR TOILETS
ROOF ROOF PROVISION FOR TOILETS PROVISION FOR TOILETS
ROOF ROOF PROVISION FOR TOILETS PROVISION FOR TOILETS
ROOF ROOF PROVISION FOR TOILETS PROVISION FOR TOILETS
ROOF
3.50

3.50

3.50

3.50

3.50

3.50

3.50

3.50

3.50

3.50
SHAFT

SHAFT

SHAFT

SHAFT

SHAFT

SHAFT

SHAFT

SHAFT

SHAFT

SHAFT
AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE AND KITCHENETTE SHAFT SHAFT AND KITCHENETTE
(TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT) (TENANT IMPROVEMENT)

GARDEN GARDEN GARDEN GARDEN GARDEN GARDEN GARDEN GARDEN GARDEN GARDEN
.30

.30

.30

.30

.30

.30

.30

.30

.30

.30
OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE OFFICE
6.25

5.65

5.65

5.65

5.65

5.65

5.65

5.65

5.65

5.65

5.65
E.302 E.301 D.302 D.301 C.302 C.301 B.302 B.301 A.302 A.301
.30

.30

.30

.30

.30
11.45

11.90
11.40

11.40

11.40

11.40

11.40
10.67

10.14
ROOF FLOOR

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS TOTAL BUILD UP AREA . 11,389.50 M² . 32.00%


CHAPTER EIGHT

SECTIONS
KEYPLAN

T
F

F
A

A
H

H
S

S
TOP OF PARAPET +681.20 +681.20

R
+680.95
.25

ROOF TOP LEVEL +680.95

.65

.65
3.40
TENANT CEILING TENANT CEILING TENANT CEILING TENANT CEILING
4.15

O
OFFICE OFFICE
OFFICE A.302 OFFICE A.306 OFFICE A.308 OFFICE A.312

3.00

3.00
+677.80 A.304 A.304

1.00
ROOF FLOOR LEVEL +676.80 +676.80

.65

T
TENANT CEILING TENANT CEILING TENANT CEILING TENANT CEILING
4.10
13.30

6.90 OFFICE OFFICE


OFFICE A.202 OFFICE A.206 OFFICE A.208 OFFICE A.212

3.00
A.204 A.204
FACADE SKIN, FOR
DESIGN DEVELOPMENT

A
FIRST FLOOR LEVEL +672.70 +672.70

1.35
ROAD
+670.90
4.80

V
3.00 (PARKING) 6.00 (DRIVEWAY) TENANT CEILING TENANT CEILING TENANT CEILING TENANT CEILING
2.00 1.00 .50 2.22
OFFICE A.102 OFFICE A.104 OFFICE A.106 OFFICE A.108
3.00

3.00
+669.00

DRIVEWAY ROAD
1.30
1.00

GROUND FLOOR LEVEL +667.90 +667.90 +667.90 +667.90


.40

ROAD +667.50 +667.55 +667.55


+667.21

E
PLANTERBOX
4.10

4.10

4.10
6.00
WOMEN'S MEN'S
WOMEN'S MEN'S PRAYER PROVISION FOR
DRIVEWAY SMOKING SMOKING
PRAYER ROOM ROOM ELECTRO-MECHANICAL
2.15

AREA AREA

L
BASEMENT 1 FLOOR LEVEL +663.80 +663.65 +663.80
12.10

E
4.00

4.00

4.00
PROVISION FOR
DRIVEWAY MULTI-PURPOSE MULTI-PURPOSE
ELECTRO-MECHANICAL

BASEMENT 2 FLOOR LEVEL +659.80 +659.65 +659.80


4.00

4.00

4.00
MALE STAFF MALE STAFF
PROVISION FOR
DRIVEWAY LOCKER AND TOILETS AND
MULTI-PURPOSE ELECTRO-MECHANICAL
CHANGING SHOWERS
BASEMENT 3 FLOOR LEVEL +655.80 +655.65 +655.80

1.60
6.00 (PARKING) 7.60 (DRIVEWAY) 6.00 (PARKING) 4.58 6.00 (PARKING) 7.60 (DRIVEWAY)

SECTION THRU Y.1 ( BUILDING A)

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
KEYPLAN KEYPLAN

TOP OF PARAPET +681.20 TOP OF PARAPET +681.20


.25

.25
ROOF TOP LEVEL +680.95 ROOF TOP LEVEL +680.95
4.15

4.15
+677.80

ROOF FLOOR LEVEL +676.80 ROOF FLOOR LEVEL +676.80


4.10

4.10
13.30

13.30
FACADE SKIN, FOR
DESIGN DEVELOPMENT
FIRST FLOOR LEVEL +672.70 FIRST FLOOR LEVEL +672.70

8.57
4.80

4.80
8.56

DRIVEWAY
GROUND FLOOR LEVEL +667.90 ROAD +667.90 GROUND FLOOR LEVEL +667.90 DRIVEWAY
+667.60 +667.60
.30

ROAD
+666.93

.67
4.10

4.10
DRIVEWAY DRIVEWAY

BASEMENT 1 FLOOR LEVEL +663.80 +663.65 BASEMENT 1 FLOOR LEVEL +663.80 +663.65
12.10

12.10
4.00

4.00
DRIVEWAY DRIVEWAY

BASEMENT 2 FLOOR LEVEL +659.80 +659.65 BASEMENT 2 FLOOR LEVEL +659.80 +659.65
4.00

4.00
DRIVEWAY DRIVEWAY

BASEMENT 3 FLOOR LEVEL +655.80 +655.65 BASEMENT 3 FLOOR LEVEL +655.80 +655.65

BUILDING A & B BUILDING A


ENTRY RAMP EXIT RAMP

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
KEYPLAN KEYPLAN

TOP OF PARAPET +683.40


.25

ROOF TOP LEVEL +683.15 TOP OF PARAPET +682.30

.25
ROOF TOP LEVEL +682.05
4.15

4.15
ROOF FLOOR LEVEL +679.00

ROOF FLOOR LEVEL +677.90


4.10
13.30

4.10
13.30
FIRST FLOOR LEVEL +674.90

FIRST FLOOR LEVEL +673.80


8.60
4.80

8.58

4.80
GROUND FLOOR LEVEL +670.10 ROAD DRIVEWAY
+669.78 +669.80
.32

DRIVEWAY
GROUND FLOOR LEVEL +669.00 ROAD +669.00
+668.68
4.10

DRIVEWAY

4.10
BASEMENT 1 FLOOR LEVEL +666.00 +665.85 DRIVEWAY

BASEMENT 1 FLOOR LEVEL +664.90 +664.75


12.10
4.00

DRIVEWAY

12.10
4.00
BASEMENT 2 FLOOR LEVEL +662.00 +661.85 DRIVEWAY

BASEMENT 2 FLOOR LEVEL +660.90 +660.75


4.00

DRIVEWAY

4.00
BASEMENT 3 FLOOR LEVEL +658.00 +657.85 DRIVEWAY

BASEMENT 3 FLOOR LEVEL +656.90 +656.75

BUILDING C & D BUILDING B & C


ENTRY RAMP EXIT RAMP

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
KEYPLAN KEYPLAN

TOP OF PARAPET +685.60 .25

ROOF TOP LEVEL +685.35 TOP OF PARAPET +684.50

.25
ROOF TOP LEVEL +684.25
4.15

4.15
ROOF FLOOR LEVEL +681.20

ROOF FLOOR LEVEL +680.10


4.10
13.30

4.10
13.30
FIRST FLOOR LEVEL +677.10

FIRST FLOOR LEVEL +676.00


8.64
4.80

8.62

4.80
DRIVEWAY
GROUND FLOOR LEVEL +672.30 ROAD +672.30
+671.95
.35

DRIVEWAY
GROUND FLOOR LEVEL +671.20 ROAD +671.20
+670.86

.34
4.10

DRIVEWAY

4.10
BASEMENT 1 FLOOR LEVEL +668.20 +668.05 DRIVEWAY

BASEMENT 1 FLOOR LEVEL +667.10 +666.95


12.10
4.00

DRIVEWAY

12.10
4.00
BASEMENT 2 FLOOR LEVEL +664.20 +664.05 DRIVEWAY

BASEMENT 2 FLOOR LEVEL +663.10 +662.95


4.00

DRIVEWAY

4.00
BASEMENT 3 FLOOR LEVEL +660.20 +660.05 DRIVEWAY

BASEMENT 3 FLOOR LEVEL +659.10 +658.95

BUILDING E BUILDING D & E


ENTRY RAMP EXIT RAMP

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
KEYPLAN

+685.60
+685.35

TOP OF PARAPET +684.65 +684.50


+684.25
.25

3.40
ROOF TOP LEVEL +684.40 +683.40
+683.15

+682.30 OUTDOOR ROOF GARDEN OFFICE A.204 OFFICE A.203 OUTDOOR ROOF GARDEN
+682.05 +682.20 LOBBY +682.20
4.15

OUTDOOR ROOF GARDEN OFFICE A.204 OFFICE A.203 OUTDOOR ROOF GARDEN

1.00
+681.20 +681.10 LOBBY +681.10 +681.20
+680.95

ROOF FLOOR LEVEL +680.25 OUTDOOR ROOF GARDEN OFFICE A.204 OFFICE A.203 OUTDOOR ROOF GARDEN +680.10
+680.00 LOBBY +680.00

OUTDOOR ROOF GARDEN OFFICE A.204 OFFICE A.203 OUTDOOR ROOF GARDEN +679.00 +679.15
+678.90 LOBBY +678.90
OFFICE A.204 OFFICE A.203

6.90
12.60

OUTDOOR ROOF GARDEN OFFICE A.204 OFFICE A.203 OUTDOOR ROOF GARDEN +677.90 +678.05 LOBBY
4.10

+677.80 LOBBY +677.80


OFFICE A.204 OFFICE A.203
+676.95 LOBBY +677.10
+676.80

FIRST FLOOR LEVEL +676.15 OFFICE A.204 OFFICE A.203


+675.85 LOBBY +676.00

OFFICE A.204 OFFICE A.203


+674.75 LOBBY +674.90

(VARIES)
+674.36

4.11
OFFICE A.204 OFFICE A.203
+673.80
4.10

LOBBY OFFICE A.104 OFFICE A.103

3.00
+673.26 LOBBY
LOT BOUNDARY +672.70 OFFICE A.104 OFFICE A.103 +672.30 +672.30 +672.30
GROUND FLOOR LEVEL +672.05 +672.16 LOBBY LANDSCAPING LANDSCAPING
SIDEWALK / RAMP 6.00 (PARKING)
OFFICE A.104 OFFICE A.103 +671.20 +671.20 +671.20
+671.06 LOBBY LANDSCAPING LANDSCAPING

OFFICE A.104 OFFICE A.103 +670.10 +670.10 +670.10 +670.25


+670.09 +669.96 LOBBY LANDSCAPING LANDSCAPING RAMP FROM
4.10

GF TO B1 RAMP FROM
(VARIES)

OFFICE A.104 OFFICE A.103 +669.00 +669.00 +669.00 +669.15 LOBBY GF TO B1


1.81

LOBBY LANDSCAPING LANDSCAPING RAMP FROM


2.19

GF TO B1 RAMP FROM
+668.08 +668.05 LOBBY GF TO B1 +668.05 +668.20
BASEMENT 1 FLOOR LEVEL +667.95 LANDSCAPING +667.90 +667.90 +667.90 LANDSCAPING RAMP FROM
GF TO B1 RAMP FROM
+666.95 LOBBY GF TO B1 +666.95 +667.10
RAMP FROM
GF TO B1 RAMP FROM +666.20
+665.85 LOBBY GF TO B1 +665.85 +666.00 RAMP FROM B1 RAMP FROM B1
12.30
4.10

RAMP FROM TO B2 TO B2
GF TO B1 RAMP FROM +665.10 LOBBY
LOBBY GF TO B1 +664.75 +664.90 RAMP FROM B1 RAMP FROM B1
TO B2 TO B2
+664.00 LOBBY +664.05 +664.20
BASEMENT 2 FLOOR LEVEL +663.85 +663.65 +663.80 RAMP FROM B1 RAMP FROM B1
TO B2 TO B2
+662.90 LOBBY +662.95 +663.10
RAMP FROM B1 RAMP FROM B1
TO B2 TO B2 RAMP FROM B2 +662.20
+661.80 LOBBY +661.85 +662.00
RAMP FROM B1 RAMP FROM B1 TO B3 RAMP FROM B2
4.10

TO B2 TO B2 LOBBY TO B3
+660.90 RAMP FROM B2 +661.10
LOBBY +660.75 RAMP FROM B2
TO B3
LOBBY TO B3 +660.05 +660.20
+659.80 RAMP FROM B2 +660.00
BASEMENT 3 FLOOR LEVEL +659.75 +659.65 RAMP FROM B2
TO B3
LOBBY TO B3 +658.95 +659.10
RAMP FROM B2 +658.90
TO B3 RAMP FROM B2
LOBBY TO B3 +657.85 +658.00
RAMP FROM B2 +657.80
TO B3 RAMP FROM B2
LOBBY TO B3 +656.75 +656.90

+655.65 +655.80

6.00 (PARKING) 7.60 (DRIVEWAY) 7.60 (DRIVEWAY) 6.00 (PARKING)

SECTION THRU X.1

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
TOP OF PARAPET +684.65
.25

ROOF TOP LEVEL +684.40

+682.30
+682.05
4.15

+681.20
+680.95

ROOF FLOOR LEVEL +680.25

OUTDOOR ROOF GARDEN OFFICE A.204 OFFICE A.203 OUTDOOR ROOF GARDEN
+678.90 LOBBY
12.60

OUTDOOR ROOF GARDEN OFFICE A.204 OFFICE A.203 OUTDOOR ROOF GARDEN
4.10

+677.80 LOBBY +677.80 +677.90

+676.80

FIRST FLOOR LEVEL +676.15


+675.85

OFFICE A.204 OFFICE A.203


+674.75 LOBBY

OFFICE A.204 OFFICE A.203


4.10

LOBBY +673.80

LOT BOUNDARY +672.70

GROUND FLOOR LEVEL +672.05


SIDEWALK / RAMP 6.00 (PARKING)
+671.06

OFFICE A.104 OFFICE A.103


+670.09 +669.96 LOBBY
4.10

(VARIES)

OFFICE A.104 OFFICE A.103


+669.00 +669.00
1.81

LOBBY LANDSCAPING
2.19

+668.08
BASEMENT 1 FLOOR LEVEL +667.95 LANDSCAPING +667.90 +667.90 +667.90 LANDSCAPING

+666.95
RAMP FROM
GF TO B1
+665.85 LOBBY
12.30
4.10

RAMP FROM
RAMP FROM
GF TO B1 +664.90
LOBBY GF TO B1 +664.75

BASEMENT 2 FLOOR LEVEL +663.85 +663.65 +663.80

+662.90
RAMP FROM B1
TO B2
+661.80 LOBBY
RAMP FROM B1 RAMP FROM B1
4.10

TO B2 TO B2
LOBBY +660.75 +660.90

BASEMENT 3 FLOOR LEVEL +659.75 +659.65 +659.80

RAMP FROM B2 +658.90


TO B3
+657.80 LOBBY
RAMP FROM B2
TO B3 RAMP FROM B2
LOBBY TO B3 +656.90
+656.75

+655.65 +655.80

6.00 (PARKING) 7.60 (DRIVEWAY) 7.60 (DRIVEWAY) 6.00 (PARKING)

SECTION THRU X.1 PART 1 OF 3

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
+684.25

+683.40
+683.15

+682.30
+682.05
OUTDOOR ROOF GARDEN OFFICE A.204
+681.10 LOBBY

OUTDOOR ROOF GARDEN OFFICE A.204 OFFICE A.203 OUTDOOR ROOF GARDEN
+680.00 LOBBY +680.00 +680.10

OUTDOOR ROOF GARDEN OFFICE A.204 OFFICE A.203 OUTDOOR ROOF GARDEN
+678.90 LOBBY +678.90 +679.00

+677.90 +678.05

OFFICE A.204
+676.95 LOBBY

OFFICE A.204 OFFICE A.203


+675.85 LOBBY +676.00

OFFICE A.204 OFFICE A.203


LOBBY +674.90

+673.80
+673.26

OFFICE A.104
+672.16 LOBBY

OFFICE A.104 OFFICE A.103


+671.06 LOBBY LANDSCAPING +671.20 +671.20

OFFICE A.104 OFFICE A.103


LOBBY LANDSCAPING +670.10 +670.10 +670.10 LANDSCAPING

+669.00 +669.00 +669.00 +669.15


LANDSCAPING LANDSCAPING RAMP FROM
GF TO B1
+668.05 LOBBY
RAMP FROM
RAMP FROM
GF TO B1 +667.10
+666.95 LOBBY GF TO B1 +666.95
RAMP FROM
RAMP FROM
GF TO B1 +666.00
LOBBY GF TO B1 +665.85

+665.10
+664.75 +664.90 RAMP FROM B1
TO B2
+664.00 LOBBY
RAMP FROM B1 RAMP FROM B1
TO B2 TO B2
LOBBY +662.95 +663.10
+662.90
RAMP FROM B1 RAMP FROM B1
TO B2 TO B2
LOBBY +661.85 +662.00

RAMP FROM B2 +661.10


+660.75 +660.90
TO B3
+660.00 LOBBY
RAMP FROM B2
TO B3 RAMP FROM B2
LOBBY TO B3 +659.10
RAMP FROM B2 +658.90 +658.95
TO B3 RAMP FROM B2
LOBBY TO B3 +657.85 +658.00

+656.75 +656.90

SECTION THRU X.1 PART 2 OF 3

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
+685.60
+685.35

+684.50
+684.25

3.40
OUTDOOR ROOF GARDEN OFFICE A.204 OFFICE A.203 OUTDOOR ROOF GARDEN
+682.20 LOBBY +682.20

OUTDOOR ROOF GARDEN OFFICE A.204 OFFICE A.203 OUTDOOR ROOF GARDEN

1.00
+681.10 LOBBY +681.10 +681.20

OUTDOOR ROOF GARDEN


+680.00 +680.10

+679.15

6.90
OFFICE A.204 OFFICE A.203
+678.05 LOBBY

OFFICE A.204 OFFICE A.203


LOBBY +677.10

OFFICE A.203
+676.00

(VARIES)
+674.36

4.11
OFFICE A.104 OFFICE A.103

3.00
+673.26 LOBBY

OFFICE A.104 OFFICE A.103


LOBBY LANDSCAPING +672.30 +672.30 +672.30 LANDSCAPING

LANDSCAPING +671.20 +671.20 +671.20 LANDSCAPING

+670.10 +670.25
LANDSCAPING RAMP FROM
RAMP FROM
GF TO B1
+669.15 LOBBY GF TO B1
RAMP FROM
RAMP FROM
GF TO B1 +668.20
LOBBY GF TO B1 +668.05
RAMP FROM
GF TO B1 +666.95 +667.10

+666.20
RAMP FROM B1 RAMP FROM B1
TO B2 TO B2
+665.10 LOBBY
RAMP FROM B1 RAMP FROM B1
TO B2 TO B2
LOBBY +664.05 +664.20
RAMP FROM B1
TO B2
+662.95 +663.10

RAMP FROM B2 +662.20


TO B3 RAMP FROM B2
LOBBY TO B3
RAMP FROM B2 +661.10
TO B3 RAMP FROM B2
LOBBY TO B3 +660.05 +660.20
RAMP FROM B2
TO B3 +659.10
+658.95

SECTION THRU X.1 PART 3 OF 3

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
KEYPLAN

+685.60

+684.50

+683.40

+682.30 +682.20 +682.20

TOP OF PARAPET +681.20 +681.20 +681.10 +681.10 +681.15


.25

ROOF TOP LEVEL +680.95 +680.00 +680.00 +680.05

+678.90 +678.90 +678.95


4.15

OFFICE 211 OFFICE A.212


+677.80 +677.80 +677.85
OFFICE 211 OFFICE A.212
+677.10
ROOF FLOOR LEVEL +676.80 +676.75
OFFICE 211 OFFICE A.212
+676.00

OFFICE 211 OFFICE A.212


+674.90
4.10

LOT BOUNDARY
13.30

OFFICE 211 OFFICE A.212


+673.80 OFFICE 107 OFFICE 108
SIDEWALK / RAMP 6.00 (PARKING)
FIRST FLOOR LEVEL +672.70 +672.70 OFFICE 107 OFFICE 108 +672.30 +672.30 +672.30

+671.57 OFFICE 107 OFFICE 108 +671.20 +671.20 +671.20


(VARIES)
1.65

OFFICE 107 OFFICE 108 +670.10 +670.10 +670.10


4.80

+669.72 ELECTROMECHANICAL ELECTROMECHANICAL ELECTROMECHANICAL


3.67

OFFICE 107 OFFICE 108 +669.00 +669.00 +669.00 ROOM ROOM ROOM
ELECTROMECHANICAL ELECTROMECHANICAL ELECTROMECHANICAL
+667.90 +667.90 +667.90 ROOM ROOM ROOM +668.05
GROUND FLOOR LEVEL +667.90
ELECTROMECHANICAL ELECTROMECHANICAL ELECTROMECHANICAL
ROOM ROOM ROOM +666.95
ELECTROMECHANICAL ELECTROMECHANICAL ELECTROMECHANICAL
ROOM ROOM ROOM +665.85 ELECTROMECHANICAL ELECTROMECHANICAL ELECTROMECHANICAL
4.10

ELECTROMECHANICAL ELECTROMECHANICAL ELECTROMECHANICAL ROOM ROOM ROOM


ROOM ROOM ROOM +664.75 ELECTROMECHANICAL ELECTROMECHANICAL ELECTROMECHANICAL
ROOM ROOM ROOM +664.05
BASEMENT 1 FLOOR LEVEL +663.80 +663.65 ELECTROMECHANICAL ELECTROMECHANICAL ELECTROMECHANICAL
ROOM ROOM ROOM +662.95
ELECTROMECHANICAL ELECTROMECHANICAL ELECTROMECHANICAL
ROOM ROOM ROOM +661.85 ELECTROMECHANICAL ELECTROMECHANICAL
12.10

ELECTROMECHANICAL
4.00

ELECTROMECHANICAL ELECTROMECHANICAL ELECTROMECHANICAL ROOM ROOM ROOM


ROOM ROOM ROOM +660.75 ELECTROMECHANICAL ELECTROMECHANICAL ELECTROMECHANICAL
ROOM ROOM ROOM +660.05
BASEMENT 2 FLOOR LEVEL +659.80 +659.65 ELECTROMECHANICAL ELECTROMECHANICAL ELECTROMECHANICAL
ROOM ROOM ROOM +658.95
ELECTROMECHANICAL ELECTROMECHANICAL ELECTROMECHANICAL
ROOM ROOM ROOM +657.85
4.00

ELECTROMECHANICAL ELECTROMECHANICAL ELECTROMECHANICAL


ROOM ROOM ROOM +656.75

BASEMENT 3 FLOOR LEVEL +655.80 +655.65

6.00 (PARKING) 7.60 (DRIVEWAY) 7.60 (DRIVEWAY) 6.00 (PARKING)

SECTION THRU X.2

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
+682.30

TOP OF PARAPET +681.20 +681.20


.25

ROOF TOP LEVEL +680.95

+678.90
4.15

+677.80 +677.80 +677.85

ROOF FLOOR LEVEL +676.80 +676.75

OFFICE 211 OFFICE A.212


4.10

LOT BOUNDARY
13.30

OFFICE 211 OFFICE A.212


+673.80
SIDEWALK / RAMP 6.00 (PARKING)
FIRST FLOOR LEVEL +672.70 +672.70

+671.57
(VARIES)
1.65

OFFICE 107 OFFICE 108


4.80

+669.72
3.67

OFFICE 107 OFFICE 108


+669.00 +669.00

GROUND FLOOR LEVEL +667.90 +667.90 +667.90 +667.90

ELECTROMECHANICAL ELECTROMECHANICAL
ROOM ROOM
4.10

ELECTROMECHANICAL ELECTROMECHANICAL ELECTROMECHANICAL


ROOM ROOM ROOM +664.75

BASEMENT 1 FLOOR LEVEL +663.80 +663.65

ELECTROMECHANICAL ELECTROMECHANICAL
ROOM ROOM
12.10
4.00

ELECTROMECHANICAL ELECTROMECHANICAL ELECTROMECHANICAL


ROOM ROOM ROOM +660.75

BASEMENT 2 FLOOR LEVEL +659.80 +659.65

ELECTROMECHANICAL ELECTROMECHANICAL
ROOM ROOM
4.00

ELECTROMECHANICAL ELECTROMECHANICAL ELECTROMECHANICAL


ROOM ROOM ROOM +656.75

BASEMENT 3 FLOOR LEVEL +655.80 +655.65

6.00 (PARKING) 7.60 (DRIVEWAY) 7.60 (DRIVEWAY) 6.00 (PARKING)

SECTION THRU X.2 PART 1 OF 3

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
+684.50

+683.40

+682.30

+681.10

+680.00 +680.00 +680.05

+678.90 +678.95

+677.85
OFFICE 211 OFFICE A.212

OFFICE 211 OFFICE A.212


+676.00

OFFICE 211 OFFICE A.212


+674.90

+673.80

OFFICE 107 OFFICE 108

OFFICE 107 OFFICE 108


+671.20 +671.20

OFFICE 107 OFFICE 108


+670.10 +670.10 +670.10

+669.00 +669.00
ELECTROMECHANICAL ELECTROMECHANICAL
ROOM ROOM
ELECTROMECHANICAL ELECTROMECHANICAL ELECTROMECHANICAL
ROOM ROOM ROOM +666.95
ELECTROMECHANICAL ELECTROMECHANICAL
ROOM ROOM +665.85

+664.75
ELECTROMECHANICAL ELECTROMECHANICAL
ROOM ROOM
ELECTROMECHANICAL ELECTROMECHANICAL ELECTROMECHANICAL
ROOM ROOM ROOM +662.95
ELECTROMECHANICAL ELECTROMECHANICAL
ROOM ROOM +661.85

+660.75
ELECTROMECHANICAL ELECTROMECHANICAL
ROOM ROOM
ELECTROMECHANICAL ELECTROMECHANICAL ELECTROMECHANICAL
ROOM ROOM ROOM +658.95
ELECTROMECHANICAL ELECTROMECHANICAL
ROOM ROOM +657.85

+656.75

SECTION THRU X.2 PART 2 OF 3

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
+685.60

+684.50

+682.20 +682.20

+681.10 +681.10 +681.15

+680.00 +680.05

OFFICE 211 OFFICE A.212

OFFICE 211 OFFICE A.212


+677.10

+676.00

OFFICE 107 OFFICE 108

OFFICE 107 OFFICE 108


+672.30 +672.30 +672.30

+671.20 +671.20 +671.20

+670.10
ELECTROMECHANICAL ELECTROMECHANICAL ELECTROMECHANICAL
ROOM ROOM ROOM
ELECTROMECHANICAL ELECTROMECHANICAL ELECTROMECHANICAL
ROOM ROOM ROOM +668.05
ELECTROMECHANICAL
ROOM +666.95

ELECTROMECHANICAL ELECTROMECHANICAL ELECTROMECHANICAL


ROOM ROOM ROOM
ELECTROMECHANICAL ELECTROMECHANICAL ELECTROMECHANICAL
ROOM ROOM ROOM +664.05
ELECTROMECHANICAL
ROOM +662.95

ELECTROMECHANICAL ELECTROMECHANICAL ELECTROMECHANICAL


ROOM ROOM ROOM
ELECTROMECHANICAL ELECTROMECHANICAL ELECTROMECHANICAL
ROOM ROOM ROOM +660.05
ELECTROMECHANICAL
ROOM +658.95

SECTION THRU X.2 PART 3 OF 3

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
KEYPLAN

TOP OF PARAPET +685.60


.25

ROOF TOP LEVEL +685.35


4.15

ROOF FLOOR LEVEL +681.20


4.10
13.30

FIRST FLOOR LEVEL +677.10


4.80

GROUND FLOOR LEVEL +672.30 +672.30

+671.20

+670.10
4.10

+669.00

BASEMENT 1 FLOOR LEVEL +668.20 +668.05 +667.90


+667.60 ROAD
+667.34
+666.95
12.10
4.00

+665.85

+664.75
BASEMENT 2 FLOOR LEVEL +664.20 +664.05
+663.65
+662.95
4.00

+661.85

+660.75
BASEMENT 3 FLOOR LEVEL +660.20 +660.05
+659.65
+658.95

+657.85

+656.75

+655.65

SECTION THRU X.3

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
TOP OF PARAPET +685.60
.25

ROOF TOP LEVEL +685.35


4.15

ROOF FLOOR LEVEL +681.20


4.10
13.30

FIRST FLOOR LEVEL +677.10


4.80

GROUND FLOOR LEVEL +672.30 +672.30

+671.20
4.10

BASEMENT 1 FLOOR LEVEL +668.20 +668.05

+666.95
12.10
4.00

BASEMENT 2 FLOOR LEVEL +664.20 +664.05

+662.95
4.00

BASEMENT 3 FLOOR LEVEL +660.20 +660.05

+658.95

SECTION THRU X.3 PART 1 OF 3

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
+671.20

+670.10

+669.00

+666.95

+665.85

+664.75

+662.95

+661.85

+660.75

+658.95

+657.85

+656.75

SECTION THRU X.3 PART 2 OF 3

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
+669.00

+667.90
+667.60 ROAD
+667.34

+664.75

+663.65

+660.75

+659.65

+656.75

+655.65

SECTION THRU X.3 PART 3 OF 3

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
KEYPLAN

TOP OF PARAPET +685.60


.25

ROOF TOP LEVEL +685.35


4.15

ROOF FLOOR LEVEL +681.20


4.10
13.30

FIRST FLOOR LEVEL +677.10

+674.92
4.80

+673.40 +673.40 +673.40


+673.20
+672.72 +672.72
GROUND FLOOR LEVEL +672.30 +672.30 +672.30
+672.02 +671.95 +672.10
.28

+671.20 +671.20 +671.20


+670.86 +671.00
+670.52 +670.52
+670.08
4.10

+669.78 +669.90

+669.00 +669.00 +669.00


+668.68 +668.80 +668.70
+668.50
BASEMENT 1 FLOOR LEVEL +668.20
+667.60
+666.93

.67
12.10
4.00

BASEMENT 2 FLOOR LEVEL +664.20

RAMP 1:24 RAMP 1:25 RAMP 1:26 RAMP 1:27 RAMP 1:28 RAMP 1:12
4.00

BASEMENT 3 FLOOR LEVEL +660.20

FENCE ELEVATION AT SOUTH

SOUTH FENCE ELEVATION

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
TOP OF PARAPET +685.60
.25

ROOF TOP LEVEL +685.35


4.15

ROOF FLOOR LEVEL +681.20


4.10
13.30

FIRST FLOOR LEVEL +677.10

+674.92
4.80

+673.40 +673.40 +673.40


+673.20

GROUND FLOOR LEVEL +672.30 +672.30 +672.10 +672.30


+672.02 +671.95

.28
+670.86
4.10

BASEMENT 1 FLOOR LEVEL +668.20


12.10
4.00

BASEMENT 2 FLOOR LEVEL +664.20

RAMP 1:24 RAMP 1:25


4.00

BASEMENT 3 FLOOR LEVEL +660.20

SOUTH FENCE PART 1 OF 3

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
+672.72 +672.72
+672.30

+671.20 +671.20 +671.20


+671.00

+670.08
+669.78 +669.90

+668.68

RAMP 1:26 RAMP 1:27

SOUTH FENCE PART 2 OF 3

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS
+671.20 +671.20
+670.52 +670.52
+669.90 +670.08

+669.00 +669.00 +669.00


+668.68 +668.80 +668.70
+668.50

+667.60
+666.93

.67
RAMP 1:27 RAMP 1:28 RAMP 1:12

SOUTH FENCE PART 3 OF 3

*PRELIMINARY DESIGN STAGE - ELEVATIONS TO BE DESIGNED LATER

MKAN ARCHITECTS

You might also like