Professional Documents
Culture Documents
Commissioning Test
Catatan :
Tanda Tangan
Aviat Telkom
CONTENT
1. SITE INFORMATION....................................................................................................................................3
1.1 SITE DETAIL...................................................................................................................................................3
2. EQUIPMENT INFORMATION.......................................................................................................................4
2.1 OUTDOOR.....................................................................................................................................................4
2.2 INDOOR........................................................................................................................................................5
3. INSTALLATION INSPECTION........................................................................................................................5
3.1 OUTDOOR.....................................................................................................................................................5
3.2 INDOOR........................................................................................................................................................6
4. LINK BUDGET.............................................................................................................................................7
4.1 PATH PROFILE................................................................................................................................................8
5. TEST ITEMS AND FORMS...........................................................................................................................8
5.1 TEST ITEMS FOR PRELIMINARY TEST...................................................................................................................9
5.2 OPTICAL INTERFACE TEST.................................................................................................................................9
5.3 ETHERNET INTERFACE TEST.............................................................................................................................11
5.4 E1 INTERFACE TEST.......................................................................................................................................12
5.5 RF PARAMETER CONFIGURATION....................................................................................................................13
5.6 MICROWAVE PROTECTION..............................................................................................................................14
6. INSTALLATION PHOTOGRAPH...................................................................................................................18
7. PING TEST................................................................................................................................................19
8. HARDWARE INSTALLATION AND ACCEPTANCE TEST..............................................................................................21
9. COMMISSIONING MEMORANDUM.........................................................................................................22
10. ATTACHEMENT.........................................................................................................................................23
Microwave (IP Radio)
Commissioning Test
1. SITE INFORMATION
*Please choose only one of Site type Cabin / Room Reno / Roof Top Cabin / Outdoor
* Please choose only one of Structure type Triangular/Guyed Mast/Mini Structure/Building/Self Supporting Tower
Microwave (IP Radio)
Commissioning Test
2. EQUIPMENT INFORMATION
2.1. Outdoor:
2.2. Indoor:
NEAR END FAR END
Standby / Standby /
Main Main
Diversity Diversity
IDU Serial No. 00154758 - 00125497 -
Hybrid System Control and
Cross-connect Board (CSH) Serial - - - -
No.
Fast/Gigabit Ethernet (GBE) - - - -
Board Serial
Fan Unit Serial No. 00144592 - 00122930 -
Tributary Card Serial No. - - - -
*If no need test, fill in N/A
3. INSTALLATION INSPECTION
3.1. Outdoor:
Local Station Remote Station
Item Inspection list Remarks
(Near End) (Far End)
The fixation of antenna is reliable. The
mechanical accessories of antenna should be
installed correctly. All connecting bolts in the
3.1.1
rack and antenna are installed correctly and □Passed □Failed □Passed □Failed
firmly. Flat washers and spring washers are
installed in a correct order.
Position 35.0m(AGL) Position 35.0m (AGL)
Antenna is installed at required position and
3.1.2
height. □ Passed □ Failed □Passed □Failed
Antenna Polarization is followed correctly
3.1.3
according to the design. □Passed □Failed □Passed □Failed
Antenna drainhole cover is removed on the
3.1.4
bottom of the antenna. □Passed □Failed □Passed □Failed
The ODU is properly mounted to Antenna /
3.1.5 Hybrid Coupler. ODU latches must be properly □Passed □Failed □Passed □Failed
locked on Antenna / Hybrid Coupler hook.
ODU Grounding is installed and the grounding
3.1.6
cable is properly tightened on grounding point. □Passed □Failed □Passed □Failed
The ODU and IF cable should be connected
3.1.7 reliably and the water-proof treatment should
□Passed □Failed □Passed □Failed
be well.
IF cable is properly installed and fixed. The IF
3.1.8
cable route follows according to the plan. □Passed □Failed □Passed □Failed
IF Cable Grounding Kit is properly installed and
3.1.9 fixed. Grounding Kit is properly terminated and □Passed □Failed □Passed □Failed
tightened on grounding point.
IF Cable Grounding Kit with proper water-proof
3.1.10
treatment. □Passed □Failed □Passed □Failed
3.1.11 IF Cable is labeled correctly on both end. □Passed □Failed □Passed □Failed
*3.1.2 please fill actual antenna height installed
Microwave (IP Radio)
Commissioning Test
3.2. Indoor:
Local Station Remote Station
Item Inspection list Remarks
(Near End) (Far End)
3.2.1 IDU is properly installed on the rack.
□Passed □Failed □Passed □Failed
IDU grounding is installed and
3.2.2
properly connected to the □Passed □Failed □Passed □Failed
grounding point.
IDU power cable is properly
3.2.3
connected to power distribution □Passed □Failed □Passed □Failed
source circuit breaker.
IDU power cable is labeled on both
3.2.4 ends correctly. Circuit breaker □Passed □Failed □Passed □Failed
assignment installed with proper
label.
E1 Traffic Cable is properly installed
3.2.5 and correctly terminated on DDF. E1 □Passed □Failed □Passed □Failed
Traffic cable properly fastened.
E1 Traffic Cable is correctly labeled
3.2.6 on both ends. DDF block with □Passed □Failed □Passed □Failed
correct label and assignment.
IF Jumper cable connector properly
installed and tightened. IF cable and □Passed □Failed □Passed □Failed
3.2.7
IF cable jumper connection fixed
and tightened properly.
3.2.8 IF Jumper cable correctly labeled.
□Passed □Failed □Passed □Failed
Ethernet Cable properly wired
3.2.9
and connected. □Passed □Failed □Passed □Failed
Optical Fiber correctly installed
3.2.10
and routed properly. □Passed □Failed □Passed □Failed
IDU Fan Units & other cards/module
3.2.11 are installed properly. All panel □Passed □Failed □Passed □Failed
screws have appropriate tightness.
3.2.12 IDU and IF Cards properly labeled.
□Passed □Failed □Passed □Failed
All cables and connectors
3.2.13
properly labeled. □Passed □Failed □Passed □Failed
Microwave (IP Radio)
Commissioning Test
Radio model iPASO IHG 15G 220MB iPASO IHG 15G 220MB
TX power (watts) 0.13 0.13
TX power (dBm) 21.00 21.00
EIRP (dBm) 60.40 60.40
Emission designator 28M00D7W 28M00D7W
RX threshold criteria BER 10-6 BER 10-6
RX threshold level (dBm) -67.50 -67.50
Maximum receive signal (dBm) -20.00 -20.00
PathProfile
750
700
650
600
Elevation (m)
550
500
450
400
350
0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0
Path length (5.52 km)
COI934 Combat Kaneyan Frequency (MHz) = 14775.0 T DO007 T areran
Latitude 01 13 20.31 N K = 1.33 Latitude 01 13 43.75 N
Longitude 124 40 33.00 E %F1 = 100.00 Longitude 124 43 30.00 E
Azimuth 82.50° Azimuth 262.50°
Elevation 381 m ASL Elevation 644 m ASL
Antenna CL 40.0 m AGL Antenna CL 65.0 m AGL
Jan 02 24
Test Equipment
2. E1 BER Tester
4. Spectrum Analyzer
5. Power Meter
- To measure optical transmit power from the board to determine STM1 optical interface board
performance
2. Configuration
Optical
OptiX RTN Tx
power
IDU
equipment meter
- To measure optical receive power from other board/cards to determine whether the receive power is
2. Configuration
Rx
IDU HW OSN
Optical
power
meter
OptiX RTN
equipment
Microwave (IP Radio)
Commissioning Test
2.Configuration
3. Procedure
- Configure a normal date service for the equipment to be tested.
- Ping the personal computer (PC) or Ethernet equipment that is connected to the
Ethernet board of NE2 by using the PC that is connected to the Ethernet board of
NE1.The ping operation should be successful and the response message should be
returned within the specified time.
Note:
0% cek di hasil
TEST RESULTS (Item 5.3.1): ping test
Packet Loss
Result Expected Result REMARKS
(Passed/Fail)
Site Name Sub Item
Remarks:
5.4 E1 interface test
2. Configuration
3. Procedure
- Loopback from far end site,Use a 2 Mbit/s bit error rate (BER) tester to perform the
24-hour bit error test.
Note:
10 -12 xcek hasil ber
TEST RESULTS (Item 5.4.1):
-9 test Bit Errors
0.0e-12
Test Sub-Item 10minutes Bit Error Test
To check and query the ODU Transmit Frequency , ODU Transmit Power (Actual and Maximum),
ODU Receive Frequency and ODU Receive Power (Actual and when opposite station on maximum power).
5.5.2 Requirements
The ODU interface information should be configured for every ODU, and the ODU interface
information includes transmit frequency (MHz), T/R spacing (MHz) and transmit power (dBm).
1 Query the actual transmit frequency of the ODU on the site & LCT.
2 Query the actual receive frequency of the ODU on the site & LCT.
3 Query the actual transmit power of the ODU on the site & LCT.
4 Query the actual receive power of the ODU on the site & LCT.
5 Query the maximum transmit power of the ODU on the site & LCT.
Query the receive power of the ODU on the site & LCT (when opposite is on max
6
power).
Test Result:
2. Requirements
To configure two IF boards and the connected ODUs as a 1+1 protection group
to protect the IF board and the ODU.
3. Configuration
Use the SDH analyzer or other tester that can monitor bit errors as the test meter.
ODU1 ODU3
Microwave Link
NE1 NE2 IDU
IDU
ODU4
ODU2
Tester
On the active IF board, power on the ODU. Deliver the switching clearing command. Make sure that
3
the protection group is in the Normal state.
On the active IF board, remove the mute of the main ODU. Deliver the switching clearing command.
5
Make sure that the protection group is in the Normal state.
10 On the opposite site, refer to steps 1-8 to test the IF 1+1 switching of the opposite equipment.
TEST RESULTS (Item 5.6.1):
Remarks:
6. INSTALLATION PHOTOGRAPH
Outdoor:
Grounding kit OK OK
Vertical cable routing (top to bottom)
OK OK
Indoor:
Power Termination OK OK
MCB / DCPDB
Tributary DDF OK OK
7. PING TEST
Target
Inspection
Items Description Completion Checked by
Date
Date
Target
Inspection
Items Description Completion Checked by
Date
Date
RANGGA SANJAYA
COMMISSIONING MEMORANDUM
(COI934) COMBAT KANEYAN – (TDO007) TARERAN
This is to certify that Commissioning Test for the above mentioned link is
successfully completed and the supplied equipment/system conforms with the
contractual obligations.
Signature Signature
Date :
Date :
LAMPIRAN:
1. CAPTURE
IPASO CAPTURE for New Link/Upgrade 2nd Pol./Redeploy
1.1 Current Status
1.2 Equipment Configuration
2.1 Radio Configuration
2.2 Current Metering
3.1 IP Address Setting
3.2 Modem Port Setting
4.1 Ethernet Port Setting
4.2 VLAN Setting
5.1 Equipment Inventory Information (IDU)
5.2 Equipment Inventory Information (ODU)
6.1 S/W License Information
6.2 Interference Check Metering
2. PHOTOGRAPHS
3. AS BUILT DRAWING
AS BUILT DRAWING for New Link/Upgrade 2nd Pol./Redeploy
1.3.1 Site Layout (Capture dari Google Map)
1.3.2 Equipment Room Layout
1.3.3 Indoor Tray and Cable
1.3.4 Rack IDU, DDF, and MCB
1.3.5 Antenna Placement information