Project: Four Laning of Solapur-Bijapur of NH-13 (New NH No 52) from Km 0.0 to 110.642
(Design length 109.08 Km) in the State of Maharashtra and Karnataka to be
executed as BOT (Toll) Project on DBFOT pattern under NHDP Phase-ill
Ref: (i) IE letter no. LNMIPPLIConcessionaireiNHAUSolapur/2021-22/4221 dated: 24.12.2021
sul ission of As-built Drawings.
Dear sir,
{n pursuant to Clause 12.3(g) of the Concession Agreement and the above mentioned letter. we
are submitting the as-built drawings of the project in two sets of hard coples and also in the format
of CD for your kind reference and record.
‘Thank you
Yours Faithfull
For Vijayaptra Tollway Pvt Lid
s
Siddanagojtdd B. Katteppanavar
Team Leader
C.c.: (i) Project Director ~ PIU, NHAI
Encl: As stated above. =;
‘Reg. te: Ne 71, Pa aw Mecho pean 33, NOLA
013606002992 “Tesereocssscis ren sor cozsiuconsoeers, cncutstprasotrrcxzitor