Nouvobanq

P.O. Box 241


Victoria
Mahe

Mr. Leslie Dufrene


Gaza Estate
Mahé
Tel: 2726428

5th July 2019

Dear Sir/ Madam

HOUSE QUOTATION OF RENOVATION

House length: 10m-10cm Long + 9m-10cm width

Material: 70 louvers blade by 3 feet long = RS 6000


7 louvers frame by 9 blade= RS 7000
Labour Cost: RS 11000

Shower Material : Need a complete renovation


70 Tiles 30x 60 cm= RS 4900
Copper Water Pipe, Shower basin = RS 4000
Labour Cost: RS9000

Roofing Renovation:
28 metal sheet by 13 feet-RS 6800
22 Timber 4x2= RS 2800
12 Timber 2x2= RS2200
10 Timber 1½ x 1½= RS1700
10 Fasher Board by 6mlong=RS 1800

Roof Draining + Drain Pipe x 7=RS 1800


Labour Cost=RS 16000

Transportation Cost :RS 6000

Quotation was made by:


Mr Simon Antoine Asba
Perseverance Village No2
21-48
Tel: 2500576
A building Maintenance
Self-Contractor