You are on page 1of 1

UNIQUE POWER PLANT LIMITED-1

An Enterprise of Meghna Group of Industries


Meghnaghat, Sonargaon, Narayangonj

DAILY BOILER PARAMETERS CHECK LIST (EVERY 8 HRS)


Boiler No: Shift: Morning Evening Night Date:
SL Description of Parameters Units BOILER-1 BOILER-2 BOILER-3 REMARKS
1 Feed Pump -1 …..
2 Feed Pump -2 …..
3 HP Dosing Pump-1 …..
4 HP Dosing Pump -2 …..
5 Steam Drum Water Level In Gauge Glass %
6 Steam Drum Pressure In Gauge Meter Bar
7 Damper Position (Field) %
8 Butterfly Valve Status (Open/Close) …..
9 Steam Leakage …..
10 Water Leakage …..
11 Abnormal Sound …..
12 Abnormal Vibration …..
13 Steam Flow Reading On (FIC401) TPH
14 Steam Flow Totaliser Reading Ton
15 Boiler Steam Drum Water Level On (LIC301) %
16 Boiler Steam Drum Pressure On (PIC301) Bar
17 Economiser Inlet Header FW Temp. On (TI205) C
o

18 Economiser Outlet Header FW Temp. On (TI204) C


o

19 Deaerator Pressure On (PIC401) Bar


20 MWPH Inlet Temp. On (TI201) o
C
21 MWPH Outlet Temp. On (TIC202) o
C
22 Flue Gas Temp. at Boiler Inlet (TI701) o
C
23 Flue Gas Temp. at MWPH Outlet (TI702) o
C
24 Flue Gas Temp. at Boiler Outlet (TI703) o
C
25 Flue Gas Temp. at MWPH Inlet (TI704) o
C
26 Gas Diverter Damper Open (ZI301) %
27 Engine Load KW
28 Flue Gas Differential Pressure Across Boiler ….. N/A N/A
29 All Sensor Condition …..
30 Rapture Disc Condition …..
31 Safety Valve Condition Of Steam Drum …..

Common Parameters
SL Description of Parameters Units Status REMARKS
32 LP Dosing Pump-1 …..
33 LP Dosing Pump-2 …..
34 Make Up Water Pump-1 …..
35 Make Up Water Pump-2 …..
36 Deaerator Water Level On (LIC101) %
37 Deaerator Water Level In Gauge Glass %
38 Deaerator Water Temp. C
o

39 Storage Tank Water Level Ton