You are on page 1of 4

AMMONIA II, PSV PACKAGE

Ammonia II ASSET TAG # 31A00-PSV-004

TECHNICAL DATA SHEET


WR 0 WO 0 MFR MOTOYAMA MODEL JLT-JNO-15S-D

PID MD-513-1A00-EG-PR-PID-2011 SRL M06613 MFR DRG 1469S2169


DATA
MD-513-1A00-EG-IN-DAS-4174-0001 DRG 0 ORIFICE D
SHEET
DESCRIPTIO ASSET GROUP MWPVALV-MTYJLTJNO15SD
N PARENT ASSET 31120-HEX-106

FLANGE OPEN/BOX UP - INLET FLANGE OPEN/BOX UP - OUTLET SCAFFOLDING FREQUENCY CATEGORY


ELEV.
SIZE & RATING QTY SIZE & RATING QTY L (M) W (M) H (M) Vol. m³ YEARS TA/SD/OL
(M)
3/4" X 150# 1 1" X 150# 1 - 0 0 0 0 5 TA

Bill of Material

Rate
Unit
Code Description Qty Cost

INSERT;SAFETY RELIEF VALVE,DISC,SS ASTM A182 GR F316,OEM:


1000278548 1
MOTOYAMA,MNF DWG:LIST NO: 32091, MANUF NO: 1469S2161,POS:3 MOTOYAMA
NOZZLE, VALVE; MATERIAL: SS ASTM A182, MATERIAL GRADE: F316STS,
1000377739 1
APPLICATION: SAFETY RELIEF VALVE; OEM: MOTOYAMA; EQ MODEL: JLT-JN0-15S-
RING; TYPE: NOZZLE, MATERIAL: SS, MATERIAL GRADE: JIS SCS16, APPLICATION:
1000377740 1
SAFETY RELIEF VALVE; OEM: MOTOYAMA; EQ MODEL: JLT-JN0-15S-D, EQ S/N:
HOLDER, VALVE DISC; VALVE STYLE: SAFETY RELIEF, MATERIAL: SS JIS SUS316;
1000377741 1
OEM: MOTOYAMA; EQ MODEL: JLT-JN0-15S-D, EQ S/N: M06613; MFR DRG:
KIT, VALVE REPAIR; COMPRISING: SPRING WASHER SS GR JIS SUS316; SPRING SS
1000377742 1
GR JIS SUS316, APPLICATION: SAFETY RELIEF VALVE; OEM: MOTOYAMA; EQ
NUT, LOCK; MATERIAL: SS, MATERIAL GRADE: JIS SUS316, APPLICATION: SAFETY
1000377743 1
RELIEF VALVE; OEM: MOTOYAMA; EQ MODEL: JLT-JN0-15S-D, EQ S/N: M06613;

Consumables
GASKET, PRE CUT;THK 2MM,FLEXIBLE GRAPHITE,RAISED FACE,CL 150,3/4IN,WITH
1000091676 1
1-SUPPORTING SS 316 PERF/ATED METAL FOIL
STUD ASSEMBLY;1/2IN,70MM,AS ASTM A193,B7,UNC13TPI,CS ASTM A194,2H,WITH
1000115906 4
(2) NUT AND WASHER
GASKET, PRE CUT;THK 2MM,FLEXIBLE GRAPHITE,RAISED FACE,CL 150,1IN,WITH 1-
1000125605 1
SUPPORTING SS 316 PERF/ATED METAL FOIL
BOLT ASSEMBLY;STUD,80MM,AS ASTM A193,B7,1/2IN,GR2H,CS ASTM A194,UN
1000114282 4
13TPI,WITH (2) HEAVY NUTS
Scope of Work

Open the PSV inlet & Outlet flange connection, remove the Valve from the location and send to WS for Calibration,
install the dummy blind on open end of the piping, install back after calibration

ManPower Equipments REMARKS IF ANY

Fitter 2 Fabricator - Crane -


Welder - Fire Watch Man - Forklifter 0
Rigger 1
Helper 1
Prepared By : Reviewed By: Approved By:
Sadabhusen Pirzada Munaf Shaikh Eissa M. Ahmed Al-Ayashy
TAM Planner Planning Specialist Manager, TAM

SMP TAM-PLNR
1 2 3 4 5 6 7 8 9 10 11 12
D01 MD-513-1A00-EG-PR-PID-2011
REV DRAWING NUMBER GENERAL NOTES:
THE PLANT BREAKDOWN IDENTIFIER PREFIX OF ALL INSTRUMENT,
PIC PT AMMONIA VALVE AND PIPING SPECIALTY TAGGING TO BE OMITTED.
MD-513-1120-EG-PR-PID-2015 4744 PLANT BL
A 2307 L 2307 THE PLANT BREAKDOWN IDENTIFIER PREFIX IS "31A00" ON THIS P&ID. A
31120-PV-2307
IP

RGAZXE
20 0004
LP STEAM HC
200-31120-SLP-BA06-1201-HC 200 200 TO NEW DAP & NPK PLANT
1035 MD-513-1A00-EG-PR-PID-2022
MD-513-09Y0-EG-PR-PID-2014

RGAZXE
100 100 BGARFB 25 BGARFB
NOTES:
25-31120-SLP-BA06-4010-HC 25-31A00-SLP-BA06-2230-HC
1. VALVE FOR TIE-IN WORK (NOT ISOLATION VALVE). VALVE SHALL BE

RGAZXE

RGAZXE

RGAZXE

RGAZXE
OPEN DURING NORMAL OPERATION.
25 25 25 25
2. TIED-IN TO TOP OF THE PIPING.
SP 3. TIE-IN NUMBER IS IP-5130-L-1127.
T SP T B182
B879 NOTE 3 4. FLOW OF DESALINATED WATER (31A00-FQI-0106) IS INDICATED IN PAU
DCS, NOT NEW AMP DCS. CONNECTION UP TO EXISTING JUNCTION
AF01 BF01 IP BOX BY THE PKG 1 CONTRACTOR AND DCS CONFIGURATION & TESTING B
B
1127 BY MPC (PAU PLANT).
LIQ.NH3 THERMAL RELIEF GRAVEL PIT GRAVEL PIT
50-31A00-AGL-AF01-1101-NI 50 FROM NEW DAP PLANT 5. FOR COMMISSIONING.
MD-513-1A00-EG-PR-PID-2021 1024

BGLWXB
CSO MD-513-0161-EG-PR-PID-2012
20
FB
BGARFD
MD-513-1210-EG-PR-PID-2004 3810
31A00-PV-0101
25-31A00-AGL-AF01-1102-NI
LIQ. AMMONIA IC
200-31A00-AGL-BF01-1104-IC
3841 MD-513-1A00-EG-PR-PID-2014

BGLWXB
25

AGAWFN
PSV SET @ 2625.0 kPa-g

CSO
25

FB
003 PIC PT
C I C
21.05 0101 L 0101 FT FQI
25x20 25-31A00-AGL-BF01-1103-IC LL 0101 0101
IP

BGLWXB
BGLWXB
25 CSO 20 0001
LIQ. AMMONIA IC
200-31A60-AGL-BF01-2101-IC 200 200
1023 MD-513-1A00-EG-PR-PID-2021 TO NEW DAP PLANT

BGLWXB
200x150 200x150 BGLWXA 25 BGLWXA IP MD-513-0110-EG-PR-PID-2011
0007
NITROGEN
50-31A00-GNN-AA21-2011-NI 50 50
4745 MD-513-1A00-EG-PR-PID-2014 TO NEW DAP PLANT
MD-513-09FG-EG-PR-PID-2019

RGAZXB
AGARFA 15 AGARFA

COMP.
4225 MD-513-19FF-EG-PR-PID-2004
D D
319FF-TIC-0944

PI H PT FT FQI
0102 0102 0102 0102

IP

ABARFC
20 0003
NATURAL GAS 150
150-319FF-NAG-AA21-0008-NI 150 TO NEW DAP PLANT
1022 MD-513-1A00-EG-PR-PID-2021

RGAZXB
NC 25 NC MD-513-09FF-EG-PR-PID-2017
319FF-HTE-001 ABAFEA ABAFEA
COMP.

E E
FT FQI
PI PT 0103 0103
0103 0103
25-31A00-IAS-AP10-8135-NI

RGAYXB

RGAYXB
25
RGAZXL

IA-S-004 15 15 IP
RGAYXB

RGAZXL
25 20 0005
INSTRUMENT AIR
100-31A00-IAS-AP10-1104-NI 100 100
1064 MD-513-1A00-EG-PR-PID-2023 TO NEW DAP PLANT
MD-513-09AA-EG-PR-PID-2030

RGASXB
COMP.
AGARFB 20 AGARFB
IA HEADER

FT FQI
PI PT 0107 0107
0107 0107
F F
RGAYXA

RGAYXA

15 15 IP
RGAYXA

20 AA22 AP10 0006 TO NEW DAP PLANT


PLANT AIR DOCUMENT APPRAISAL STAMP
150-31A00-PAS-AA22-1103-NI 150 150 MD-513-09AB-EG-PR-PID-2031
1059 MD-513-1A00-EG-PR-PID-2023
RGASXB
AGARFB 25 AGARFB PSV SET @ 1087.0 kPa-g
PA HEADER 004 25-31A00-WDS-AP09-1102-NI
FT FQI
PI PT 0106 0106 REVIEWER'S NAME SIGN DATE
0106 0106

RGAWFK

RGAWFK
NOTE 4
25x20 15 15 TI
RGAWFK

25-31A00-WDS-AP09-1101-NI TO GRADE 0055


20 NOTE 1
DESALINATED WATER 200 NOTE 5
200-31A00-WDS-AP09-0101-NI 200 200 200 200
MD-513-1A00-EG-PR-PID-2025 1092 FROM PAU REVIEW GRADE
RGAWFK

SET @ 1087.0 kPa-g AGARFF

RGAWFK
20
AGARFF 25 AGARFF AGARFF
PSV TI Result Code Description
G FT FQI 005 MIN. 0056
G
PI PT A Accepted
0104 0104
0104 0104 25-31A00-WPR-AP09-1104-NI 350-WDS-49WA-4328-AP01-NI C Proceed with exceptions to next submission and Revision
RGAWFK

RGAWFK

25x20 (MD-502-49WA-EG-PR-PID-0063)
15 15 TO GRADE R Do Not Proceed - Revise as noted and Resubmit
RGAWFK

NOTE 5
AGARFF

25-31A00-WPR-AP09-1103-NI
20 TI
PROCESS WATER 80 25 0017 Acceptance in any of these categories in no way relieves the Contractor/Supplier of its
80-31A00-WPR-AP09-1106-NI 80 80 80 responsibility for the due & proper performance of the Works in accordance with the
MD-513-1A00-EG-PR-PID-2025 1093 Contract/Purchase Order

RGAWFK
RGAWFK

AGARFF AGARFF 20 AGARFF FROM PAU


20 TI
100-WPR-49WC-4124-AP01-NI PROJECT MANAGER SIGN-OFF:
MIN. 0018
(MD-502-49WC-EG-PR-PID-0061) NAME DATE:

DRAWN YLP 31/08/16


PROPRIETARY & CONFIDENTIAL
CHECKED SHY 31/08/16 UMM WU'AL PHOSPHATE PROJECT
This document and the information contained
H ENGINEER PIPING & INSTRUMENTATION DIAGRAM H
herein is Ma'aden proprietary know-how. KHC 31/08/16
This document or any part thereof should not
APPROVED
TIE-IN(1/4)
be reproduced, stored in a retrieval system JJY 31/08/16
or transmitted by any means, electronic or
otherwise, or divulged without prior written EMPLOYER
D01 31/08/16 AS BUILT YLP SHY KHC JJY permission of Ma'aden. DRAWING NUMBER REV
SCALE
DOCUMENT NUMBER REFERENCE DOCUMENTS REV DATE REVISION DESCRIPTION DRN CHK ENG APP EMP NTS A1 MD-513-1A00-EG-PR-PID-2011 D01
1 2 3 4 5 6 7 8 9 10 11 12