Professional Documents
Culture Documents
SLOPE: i = 1%
5700
NOTE:
God house Mesh steel fence 8100
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
DB OTHERWISE
2450 2450 2450 2450 2450 2450 2450 2450 2450 2450 2450
1884
2. ALL DIMENSION ARE FROM STRUCTURES UNLESS
Connect to leg LPG tank
1500 1500
NOTED OTHERWISE
5969
LPG TANK
10M3
1884
Connect to leg LPG tank
concrete Wall
2450 2450 2450 2450 2450 2450 2450 2450 2450 2450 2450
4. MASONRY WALLS SHALL BE 110mm; 160mm; 210 mm
OR 250mm BRICK WITH 15mm THK CEMENT PLASTER
FINISH ON BOTH SIDE UNLESS NOTED OTHERWISE
DA
BPC
R1654 -0.120 5. COLUMNS WITHOUT DIMENSION ARE TO BE
A R1
654 CENTERED ON GRIDLINES
-0.920 -0.920 -0.920 -0.920 -0.920 -0.920 250X250
-0.120
CAR PARKING 6. FOR CONCRETE STRUCTURE DETAIL REFER TO
ENGINEER DRAWINGS.
8735
DRIVE WAY RIVERSIDE 7. FOR STEEL STRUCTURE DETAIL REFER TO
5575
12724
ENGINEER DRAWINGS
7413
250X250
God house
KEY PLAN
0
R3
00
00
R3
1200
0
-0.770 -0.770 -0.770 -0.770 -0.770 00
R50
8290
i = 1.7 -0.850
-0.700 % 250X250
P
-1.100
4300
SIDE ENTRANCE
4000
7735
7735
O
-1.000 200500 200X500
2500
4000
i = 2%
4315
R2
0 00
2500
95
N
SILENCER
G1 1500kVA
4
R6
OWNER/ CLIENT
54
-0.900 -0.840 -0.700
4000
4335
6235
200500 200X500
R2 CL 1 3782
C
00
M 0
E
00
20
R
950
4000
SLOPE: i = 0.3%
6650
A
-0.700
DL-1000L
ENGINEERING
1757
L WORKSHOP
3000
-0.900
NEW ROAD
4000
200X400 200X400
8290
4450 2000 2400 2400 2400 2500 2500 2500 2500
G1 1500kVA
2500
SL/FL 1
SILENCER
K
3530
4000
2500
3300
2620
MEP
J
1015
200X400 200X400
R6
DRIVER
1085
4
2270
ROOM WC to be confirmed by MEP
4000
5568
100 1200
LOBBY
2500
2072
I
59
2750 2000
-0.655
1636
-0.700
500
-0.900 -0.840
4000
ADA
1970
PL-1 PL-2
2555
200X400 200X400
H
-0.700
4000
i = 1.5%
HOTEL 2051
-0.450
1280
E
PVC
PVC
MAIN ENTRANCE
2340
2767
L.B.L. INTERNATIONAL
2082
2082
1260
4000
WC
ENTREPRISE GENERALE
800
6640 210 370 900
WC Packing area
FRONT OFFICE BATIMENT - TRAVAUX PUBLICS
PVC
PVC
HANDS
SINK
RETAIL 1 Technical 895 (Dirty area)
D
room -0.450
SCALE
9
386
RC01
BC04
SLOPE: i = 1.5%
BC06
BC02 BC01
BC05
BC17 RC03
4000
RC09
BC09
Meat Mincer RC02
BUTCHER AREA
Nº 43 Sihanouk Boulevard,
BC10
-0.900 -0.840
RC04
BC08
Meat Slicer
1260
C
Chaktomuk, Daun Penh
BC07 BC18
12 RC05
Security & 8130
00
BC08
99 Meat Slicer
BC12 BC07 CS07 BC16
RC06
10
Vacumm
BC11
Receiving Phnom Penh, Cambodia
C BC15
RC02
C BC13
Room
CS01
tel: +855(0)23.722.532
BC14
1500
BC15
GREEN FENCE
Vacook
BC13
1275
200X400 200X400 fax: +855(0)23.214.272
CS13
lblinternational@lbl-group.com
CS11
1000 3215 1000 RC07
CS11
CS10
CS10
67 3 CS09
CS10 CS11
R2 www.lbl-group.com
CS08
F
SIDE WAY
CS11
± 0.000
CS13
CS09 CS11
00
CS11 CS11
CS13
CS12
10
9696
CS05
MAIN LOBBY
935
CS11 CS11
CS11
CS14
CS12
CS14
CS11
R1
1500 3000
- 0.350 CS10
NOET NOET
PROJECT NAME
CS11
CS12
CS04
CS09
6014
CS11 CS11 CS02
CS16 CS09
GLASS
-0.840 -0.450
200X400 200X400
STORE
-0.900
C
CS03 CS11
RIVERSIDE
CS11 CS11
CS10
CO2
CS08
CO2
CS12
cash
Monit
i = 7%
B
GN 1/9
CS12
drawe
i = 2%
CS11
or
1500
GN 1/9
r
GN 1/9
GN 1/9
CS13
DRAWING PHASE :
i= 9.5%
CS10
SS
STO
RE PL-3 PL-4 PL-5
GOD HOUSE DRAWING
GLA
1400
.5%
CS15
1500
CS13 CS14
840
NOET
-0.450
8000
i=1
30
12 Glass washer
i = 3.1%
200X400
DRAWING TITLE :
5845
1500
AS BUILT LEVEL 05
PE:
-0.900 -0.840 C 5615
Up
SL/FL 2
2550
180X250
2825
R269
8
SLO
R225
0
1165
2600 Up
C C
Salamander
LINEN
C
DESIGNED BY ADA
Jetwave
Ice Cube Maker
Wine Chiller Oven
Spika 400
Coffe machine Panini
A
Chiller Display
Blender Juice Extractor Citrus Juicer
Grinder
54
-0.840 4055
-0.700 DRAWN BY LBL
50
250X2
SLOPE: i = 0.5% CHECKED BY
21
-0.850 -0.800 LBL
40
SIDE WAY
3732
50
250X2
APPROVED BY ADA
200
-0.800 DATE 25-May-22 SCALE
50 A3,As shown
50
50
50
50
24
50
0
50
24
24
24
50
50
24
24
24
0
24
250X25
24
24
Car wash/
-1.000
-1.050
SUN & MOON Fleet, chairman, executive office parking space, All parking
HOTEL DRIVE WAY ramp
covered by green roof NEW FENCE POSITION 09 13.10.21 General Modif.
7218
250X250
ENTRANCE
10 29.12.21 General Modif.
800
250X250
7836
250X250
250X250
250X250
800
-1.000 250X250
ENTRANCE
-0.900
HOTEL DRIVE WAY
-1.000 1
4000
2
4000
3
4000
250X250
4
4000
250X250
5
4000
6
250X250
4000
7
4000
250X250
8
4000
9
4000
10
4000
11
4000
12
4000
13
4000
14
4000
15
13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/400 LEVEL 1
SMR-LBL-ARC-AL-SD-L4 Rev.13
-1.400
RELEASE
0
00
25-May-22
R5
R2 CL 1 3782
C
00
M 0
NOTE:
E
00
20
R
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
950
4000
2500 2400 2400 2400 OTHERWISE
SLOPE: i = 0.3%
6650
A
-0.700 2. ALL DIMENSION ARE FROM STRUCTURES UNLESS
DL-1000L
ENGINEERING
1757
NOTED OTHERWISE
L WORKSHOP
3. SL SHALL BE REFERED TO TOP OF FLOOR
3000
-0.900
C
TRAP/TRENCH
NEW ROAD
4000
200X400 200X400
G1 1500kVA
FINISH ON BOTH SIDE UNLESS NOTED OTHERWISE
2500
SL/FL 1
SILENCER
K
3530 5. COLUMNS WITHOUT DIMENSION ARE TO BE
CENTERED ON GRIDLINES
4000
2500
3300
ENGINEER DRAWINGS.
2620
MEP
7. FOR STEEL STRUCTURE DETAIL REFER TO
J
1015
ENGINEER DRAWINGS
200X400 200X400
R
DRIVER
64
1085
2270
KEY PLAN
ROOM WC to be confirmed by MEP
4000
4550
- 0.720 i = 2%
2950
3793
5568
100 1200
LOBBY
2500
2072
I
59
2750 2000
-0.655
1636
-0.700
500
-0.900 -0.840
4000
1970
PL-1 PL-2
2555
200X400 200X400
H
-0.700
4000
-0.300
69696
-0.500 -0.600
G 200 200 OWNER/ CLIENT
200X400 200X400
GREEN FENCE
-0.400 -0.600
i = 1.5%
HOTEL 2051
-0.450
1280
E
PVC
PVC
MAIN ENTRANCE
2340
2767
2082
2082
1260
4000
WC
800
6640 210 370 900
WC Packing area
FRONT OFFICE
PVC
PVC
HANDS
SINK
RETAIL 1 Technical 895 (Dirty area)
D
room -0.450 Consultant Architecture Design
SCALE
69
R38
RC01
BC04
SLOPE: i = 1.5%
BC06
BC02 BC01
BC05
BC17 RC03
4000
RC09
BC09
Meat Mincer RC02
BC10 BUTCHER AREA
-0.900 -0.840
RC04
BC08
Meat Slicer
1260
C
BC07 BC18
12 RC05
Security & 8130
00
BC08
99 Meat Slicer
BC12 BC07 CS07 BC16
RC06
10
Receiving
ADA
Vacumm
BC11 RC02
C BC15
C CS01
BC13
Room
BC14
1500
BC15
GREEN FENCE
Vacook
BC13
200X400 200X400
1275
CS13
CS11
1000 3215 1000 RC07
CS11
CS10
CS10
673
CS10 CS11
CS09
CS08
F
± 0.000
CS11
SIDE WAY
CS13
CS09 CS11 Apartment A0105 Block A,
0 CS11 CS11 Hoang Anh River View
0 CS13
CS12
10 Thao Dien Ward, District 2,
9696
CS05
935
CS11 CS11
CS11 projects@desport-architects.com
CS14
CS12
CS14
CS11
R1
www.desport-architects.com
1500 3000
- 0.350 CS10
CS11
NOET NOET
CS12
CS04
CS09
6014
CS11 CS11 CS02
CS16 CS09
GLASS
-0.840 -0.450
200X400 200X400
STORE
-0.900
C
2
CS11 CS11
CS03
CS11
CS10
ARCHITECT & ENGINEER
CO
2 CS08
CO
CS12
cash
Mon
i = 7%
B
GN 1/9
CS12
draw
i = 2%
itor
CS11
150
GN 1/9
er
0
GN 1/9
GN 1/9
CS13
L.B.L. INTERNATIONAL
i= 9.5%
CS10
SS
STO
RE PL-3 PL-4 PL-5
GOD HOUSE ENTREPRISE GENERALE
GLA
1400
.5%
CS15
1500
CS13 CS14
BATIMENT - TRAVAUX PUBLICS
840
NOET
-0.450
8000
i=1
30
12 Glass washer
i = 3.1%
200X400
Nº 43 Sihanouk Boulevard,
5845
1500 Chaktomuk, Daun Penh
PE:
-0.900 -0.840 C 5615
Up
2550
180X250
tel: +855(0)23.722.532
2825
R269
8
SLO
R22
50
fax: +855(0)23.214.272
1165
2600 Up
Ice Cube Maker
Spika 400
Coffe machine
C C
C Wine Chiller
Salamander
Panini
Jetwave
Oven
LINEN lblinternational@lbl-group.com
A
Chiller Display
Grinder
Blender Juice Extractor Citrus Juicer
www.lbl-group.com
-0.900 -0.900 -0.800 -0.450
1105
54
-0.840 4055
-0.700
250
250X
SLOPE: i = 0.5%
21
-0.850 -0.800
40
SIDE WAY
3732
PROJECT NAME
200
250X
250
50
50
50
50
0
24
50
24
24
24
50
50
24
24
DRAWING PHASE :
24
50
24
250X2
24
24
Car wash/
-1.000
-1.050
Maintenance DRAWING
-1.150
-1.100
SUN & MOON Fleet, chairman, executive office parking space, All parking
HOTEL DRIVE WAY ramp
covered by green roof NEW FENCE POSITION
7218
250X250
250X250
AS BUILT LEVEL 01
250X250
250X250
7836
100
250X2
800
-1.000
50
250X250
DESIGNED BY ADA
200 250X250
4000
250X250
4000
250X250
4000 4000
250X250
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
D1 D2 D3 D4 D5 D6 D7 D8 D9 D10 D11 OTHERWISE
SLOPE: i = 1%
SLOPE: i = 1%
KEY PLAN
5700
God house Mesh steel fence 8100
DB 2450 2450 2450 2450 2450 2450 2450 2450 2450 2450 2450
1884
Connect to leg LPG tank
1500 1500
5969
LPG TANK
10M3
1884
Connect to leg LPG tank
2450 2450 2450 2450 2450 2450 2450 2450 2450 2450 2450
concrete Wall OWNER/ CLIENT
DA
BPC
R1654 -0.120
A R1
654
-0.920 -0.920 -0.920 -0.920 -0.920 -0.920 250X250
-0.120
CAR PARKING
8735
DRIVE WAY RIVERSIDE
5575
12724
7413
250X250
God house
0
R3
00
00
R3
1200
0
-0.770 -0.770 -0.770 -0.770 -0.770 00
0
R5 Consultant Architecture Design
8290
i = 1.7 -0.850
-0.700 % 250X250
P
-1.100
4300
SIDE ENTRANCE
ADA
4000
7735
7735
O ADRIEN DESPORT ARCHITECTURE
-1.000 200500 200X500
2500
Thao Dien Ward, District 2,
4000
R
20
00
2500
95
SILENCER
G1 1500kVA
4
R6
-0.900 -0.840
54
-0.700
4000
6235
200500 200X500
R2 CL 1 3782
C
00
M 0
L.B.L. INTERNATIONAL
E
00
20
ENTREPRISE GENERALE
R
950
4000
SLOPE: i = 0.3%
6650
A
-0.700
DL-1000L
ENGINEERING
1757
L WORKSHOP Nº 43 Sihanouk Boulevard,
Chaktomuk, Daun Penh
3000
-0.900
C
Phnom Penh, Cambodia
NEW ROAD
tel: +855(0)23.722.532
4000
200X400 200X400
G1 1500kVA
www.lbl-group.com
2500
SL/FL 1
SILENCER
K
3530
4000
2500
2620
MEP SUN AND MOON THE
J RIVERSIDE
1015
200X400 200X400
R6
DRIVER
1085
4
DRAWING PHASE :
2270
ROOM WC to be confirmed by MEP
4000
4550
- 0.720 i = 2%
2950
3793
DRAWING
5568
100 1200
2500
2072
I
59
2750 2000
-0.655
500
-0.900 -0.840
4000
1970
PL-1 PL-2 DESIGNED BY ADA
2555
200X400 200X400
1200 3782
Up
2200 2200
Up DRAWN BY LBL
H
CHECKED BY LBL
-0.700 APPROVED BY ADA
4000
A3,As shown
-0.500 -0.600
200 200 No. DATE DESCRIPTION
G
200X400 200X400
-0.900 -0.840 -0.740 -0.440 -0.440 -0.600 -0.750 11 29.01.22 General Modif.
HOTEL DRIVE WAY
i = 2% 12 04.04.22 General Modif.
SLOPE: i = 2% AS BUILT STRUCTURE 13 25.05.22 General Modif.
DRAWING NUMBER
LAYOUT PLAN 01 SMR-LBL-ARC-AL-SD-L4 Rev.13
2400
5635 5635
4000
6. FOR CONCRETE STRUCTURE DETAIL REFER TO
ENGINEER DRAWINGS.
6120
4000
KEY PLAN
3 R6
R6 3
00
30
N
R
2400
2400
4000
7550
2250
CL 1
2400
2400
4500
M 2400 2400 2400
2250
4000
2400
2400
5160 2645
1420
OWNER/ CLIENT
2400
2400
1855 1800 6000 1595 1800 7395
4000
1500
SL/FL 1
2400
2400
K
2500
2200 2600
4000
2220
2220
J
1550
4000
I
LOBBY
4000
DN DN
ST-D ST-C
PL-1 PL-2 Consultant Architecture Design
Up Store Store Up
H
4000
ADA
69696
38
50
E
ARCHITECT & ENGINEER
4000
L.B.L. INTERNATIONAL
ENTREPRISE GENERALE
D 4180
BATIMENT - TRAVAUX PUBLICS
3850 1000 3180
4000
1825
AHU Nº 43 Sihanouk Boulevard,
ROOM Chaktomuk, Daun Penh
1825
Phnom Penh, Cambodia
2200
C tel: +855(0)23.722.532
1000
2220
Linen lblinternational@lbl-group.com
www.lbl-group.com
1825
1825
1000
3180 1000
9696
1000
1825
PROJECT NAME
SUN AND MOON THE
1825
1000
1000 3180
RIVERSIDE
1000
1825
DRAWING PHASE :
1825
7500 4217
B DRAWING
676
2120 1080
1670
DRAWING TITLE :
PL-3 PL-4 PL-5
2500
3520
AS BUILT LEVEL 02
1825
1200
2200 2200 2200
8000
CHECKED BY LBL
2600
ST-B
LINEN
ST-A APPROVED BY ADA
A
DATE 25-May-22 SCALE
54
4055
A3,As shown
Raise Up Floor 300mm No. DATE DESCRIPTION
09 13.10.21 General Modif.
4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 10 29.12.21 General Modif.
44000 11 29.01.22 General Modif.
56000 12 04.04.22 General Modif.
AS BUILT STRUCTURE
LAYOUT PLAN 02 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/325 SMR-LBL-ARC-AL-SD-L4 Rev.13
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
4000
DN
ST-D
DN 5. COLUMNS WITHOUT DIMENSION ARE TO BE
ST-C
CENTERED ON GRIDLINES
PL-1 PL-2
Up Store Store Up
6. FOR CONCRETE STRUCTURE DETAIL REFER TO
ENGINEER DRAWINGS.
H
7. FOR STEEL STRUCTURE DETAIL REFER TO
4000 ENGINEER DRAWINGS
KEY PLAN
69696
G
4000
OWNER/ CLIENT
4000
38
50
E
4000
D
3850 1000
4180
3180
4000
1825
AHU
ROOM Consultant Architecture Design
1825
2200
C
1000
2220
Linen
ADA
1825
1825
1000
ADRIEN DESPORT ARCHITECTURE
3180 1000
Apartment A0105 Block A,
9696
1000
1825
Thao Dien Ward, District 2,
Ho Chi Minh City, Vietnam
projects@desport-architects.com
www.desport-architects.com
1825
1000
1000 3180
1000
1825
ARCHITECT & ENGINEER
1825
7500 4217
B L.B.L. INTERNATIONAL
676
2120 1080
ENTREPRISE GENERALE
1670
BATIMENT - TRAVAUX PUBLICS
PL-3 PL-4 PL-5
2500
3520
1825
1200
2200 2200 2200 Nº 43 Sihanouk Boulevard,
Chaktomuk, Daun Penh
8000
2550
2600
LINEN PROJECT NAME
ST-B ST-A
A
SUN AND MOON THE
54
4055
RIVERSIDE
Raise Up Floor 300mm DRAWING PHASE :
DRAWING
DRAWING TITLE :
4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 AS BUILT LEVEL 02
44000
56000 DESIGNED BY ADA
DRAWN BY LBL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
CHECKED BY LBL
APPROVED BY ADA
DATE 25-May-22 SCALE
A3,As shown
No. DATE DESCRIPTION
09 13.10.21 General Modif.
10 29.12.21 General Modif.
11 29.01.22 General Modif.
12 04.04.22 General Modif.
AS BUILT STRUCTURE
LAYOUT PLAN 02 13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/225 SMR-LBL-ARC-AL-SD-L4 Rev.13
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
KEY PLAN
2400
5635 5635
4000
OWNER/ CLIENT
6120
4000
3 R6
R6 3
00
30
N
R
2400
2400
4000
7550
2250
CL 1
2400
2400
4500
M 2400 2400 2400
Consultant Architecture Design
2250
4000
2400
2400
ADA
5160 2645
1420
ADRIEN DESPORT ARCHITECTURE
2400
2400
1855 1800 6000 1595 1800 7395
4000
1500
Hoang Anh River View
Thao Dien Ward, District 2,
Ho Chi Minh City, Vietnam
projects@desport-architects.com
www.desport-architects.com
SL/FL 1
2400
2400
K
2500
2200 2600
2220
2220
L.B.L. INTERNATIONAL
J ENTREPRISE GENERALE
BATIMENT - TRAVAUX PUBLICS
PARKING MEZZANINE FLOOR
1550
4000
DN DN
ST-D ST-C
PL-1 PL-2 PROJECT NAME
Up Store Store Up
SUN AND MOON THE
H
RIVERSIDE
DRAWING PHASE :
4000
DRAWING
69696
DRAWING TITLE :
AS BUILT LEVEL 02
G
DESIGNED BY ADA
4000
DRAWN BY LBL
CHECKED BY LBL
APPROVED BY ADA
DATE 25-May-22 SCALE
A3,As shown
No. DATE DESCRIPTION
09 13.10.21 General Modif.
10 29.12.21 General Modif.
11 29.01.22 General Modif.
12 04.04.22 General Modif.
AS BUILT STRUCTURE
LAYOUT PLAN 02 13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/225 SMR-LBL-ARC-AL-SD-L4 Rev.00
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
3455
ENGINEER DRAWINGS.
19 nos
2170 726
4984 10235 1745 11000 7. FOR STEEL STRUCTURE DETAIL REFER TO
21
21
ENGINEER DRAWINGS
1190
P 1200
1240
210
21
21
KEY PLAN
1000
1500 1500 5015 1500 5900
1500 1800 1500
4000
1500 5275 350 1000 350 1500 350 2000 350
755
350
1500
1880
1500 1500 1500 1500 1500 1500 1500 1500 1500 1500
3000
deco cabinet/ storage)
O
21
350
21
4000
1800
1500 1500 1500 1500 1500 1500 1500 1500 1500 1500
720
720
N
4000
1800
1500 1500 1500 1500 1500 1500 1500 1500 1500 1500
BOH 7550
2250
RIGHT
CL 1
6000
4500
13000
10770
10000
M STAGE
2250
OWNER/ CLIENT
4000
1500 1500 1500 1500 1500 1500 1500 1500 1500 1500
1800
5160 2645
1420
100
4000
1500 1500 1500 1500 1500 1500 1500 1500 1500 1500
1500
GUEST VESTIAIRE
1800
350
SL/FL 1
K
2500
4000
1500 1500 1500 1500 1500 1500 1500 1500 1500 1500
2200 2600
4000
1880
1500
645
350
980
J
TECHNICAL
4000
3627 2081 2292 5710 2080 4210 4335 2080 1585 1585 2080 335 ROOM
1200
1680
DN
FDL 1
WC
ST-D
2080
ST-C
PL-1 PL-2 H.C 1250
2555
2053
250
2200 2200
ADA
Up Up
1550
1550
H
1625
WC
1500
2100
4000
MALE
FOYER
69696
600
ADRIEN DESPORT ARCHITECTURE
900
Apartment A0105 Block A,
G WC Hoang Anh River View
1500
Thao Dien Ward, District 2,
3950
1570
FEMALE
Ho Chi Minh City, Vietnam
4000
1550
1200 care 1200 www.desport-architects.com
250
1000
Mobile Serving area
F
Work table (SV01) move from (L7)
750
BALCONY
1800
4000
1200
Ice Caddy
BANQUET900
KITCHEN
750
1800
C
720
Preparation
HANDS
SINK
2400
900
1800
1800
E 500 1800
L.B.L. INTERNATIONAL
500
1000 Sink
extractor
blender C
1100
juice
Glass Door
100
Table
1300
1300
FOYER
ENTREPRISE GENERALE
3400 50
1400
4000
SALAMANDER
Hose
CHILLER ROOM
reel
1100
600 700
4000
GLASS STORE
600
600
Trash Bin Beer Draft
1500
500
1500
Sliding door
Glo-ray Heat Strip
1300
1300
Washing Area
MAIN KITCHEN
D LANDING
500
BOH AREA
750
1500
1500
F
Nº 43 Sihanouk Boulevard,
RESTAURANT
1260
Cold Storega
800 Chaktomuk, Daun Penh
4000
1500
1260
tel: +855(0)23.722.532
900
1661
Wall =1200 1530
600
600
Pot Wash Area
Upright locker
C lblinternational@lbl-group.com
Salad Display
61
Washing Machine
900
10360
40
9 6 www.lbl-group.com
11
900
Salad Display
500
Upright locker
1140 ALL DAY DINING
1030 3083 1030 6315
1800
Chill
1500
+ 5.500
Cold Display
79 900 1800 1800 1800
16 Wall =1200
1600
PROJECT NAME
1800
1800
900
9696
C C 1260
i = 1%
1595 900
SUN AND MOON THE
1177
750
1800
1800
750
RIVERSIDE
1830
1800
C
600
1500
SALAMANDER
500
900 760
4200
DRAWING PHASE :
Waiting Lounge C
750
600
DRAWING
C
Welcome 3139
2185
600
925 Fixed Glass H=1.2m, offset 1m from FFL
Chef Room
MEP
PL-3 PL-4 PL-5 1267
AS BUILT LEVEL 03
2600
2500
Juice Extractor
HANDS
Citrus Juicer
Grinder
SINK
Blender
Coffe machine
C
DESIGNED BY ADA
1309
ula
ted
Box
ST-B
LINEN
ST-A APPROVED BY ADA
A
DATE 25-May-22 SCALE
A3,As shown
No. DATE DESCRIPTION
09 13.10.21 General Modif.
4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 10 29.12.21 General Modif.
44000
11 29.01.22 General Modif.
56000
12 04.04.22 General Modif.
AS BUILT STRUCTURE
LAYOUT PLAN 03 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/325 SMR-LBL-ARC-AL-SD-L4 Rev.13
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
4000
1680
DN
FDL 1
WC 5. COLUMNS WITHOUT DIMENSION ARE TO BE
2080
ST-D ST-C
PL-1 PL-2 H.C 1250 CENTERED ON GRIDLINES
2555
2053
250
Up 2200 2200 Up
6. FOR CONCRETE STRUCTURE DETAIL REFER TO
ENGINEER DRAWINGS.
1550
1550
H
1625 7. FOR STEEL STRUCTURE DETAIL REFER TO
ENGINEER DRAWINGS
WC
1500
2100
4000
MALE KEY PLAN
FOYER
69696
600
900
G WC
1500
3950
1570
FEMALE
4000
Baby 2600
1550
1200
1200 care
250
1000
Mobile Serving area
F
Work table (SV01) move from (L7)
750
BALCONY
1800
OWNER/ CLIENT
4000
1200
Ice Caddy
BANQUET900
KITCHEN
750
1800
C
720
Preparation
HANDS
SINK
2400
900
1800
1800
E 500 1800
500
1000 Sink
extractor
blender C
1100
Glass Door
juice
100
Table
1300
1300
FOYER 3400 50
1400
4000
SALAMANDER
Hose
CHILLER ROOM
reel
1100
600 700
4000
GLASS STORE
600
600
Beer Draft
Trash Bin
1500
500
1500
Sliding door
Glo-ray Heat Strip
1300
1300
Washing Area
MAIN KITCHEN
D LANDING
500
BOH AREA
750
1500
1500
F
RESTAURANT
1260
Cold Storega
800
4000
750 F
1500
1260
Glo-ray Heat Strip
VIP TOILET
VIP LOUNGE VIP LOUNGE
Consultant Architecture Design
900
1661
Wall =1200 1530
600
600
Pot Wash Area
Upright locker
Salad Display
61
Washing Machine
900
10360
40
96
11
900
Salad Display
500
Upright locker
1030 3083 1030
1140 ALL DAY DINING
6315
ADA
1800
Chill
1500
+ 5.500
Cold Display
79 900 1800 1800 1800
16 Wall =1200
1600
1800
1800
Apartment A0105 Block A,
900
9696
1177
750
1800
1800
750 www.desport-architects.com
1830
1800
C
600
1500
SALAMANDER
500
900 760
4200
ARCHITECT & ENGINEER
Waiting Lounge C
750
600
C
Welcome 3139
2185
1800 1800 1200 1200 600
B counter L.B.L. INTERNATIONAL
ENTREPRISE GENERALE
600
925 Fixed Glass H=1.2m, offset 1m from FFL
Chef Room
PL-3 PL-4 PL-5
MEP BATIMENT - TRAVAUX PUBLICS
1267
2600
2500
2200 2200 2200
Nº 43 Sihanouk Boulevard,
Chaktomuk, Daun Penh
8000
Juice Extractor
Phnom Penh, Cambodia
HANDS
Citrus Juicer
Grinder
SINK
Blender
Coffe machine
1309
C C
tel: +855(0)23.722.532
fax: +855(0)23.214.272
i = 1% Wall fully closed off on top
lblinternational@lbl-group.com
F&B Office, Ins
ula
ted
Bo
x
www.lbl-group.com
INDOOR GARDEN F&B Linen storage MEP MEP
1300
SL/FL 2 Ins
ula
ted
Bo
x
Ins
1300
ula
ted
Bo
x
DRAWING TITLE :
4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 AS BUILT LEVEL 03
44000
56000 DESIGNED BY ADA
DRAWN BY LBL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
CHECKED BY LBL
APPROVED BY ADA
DATE 25-May-22 SCALE
A3,As shown
No. DATE DESCRIPTION
09 13.10.21 General Modif.
10 29.12.21 General Modif.
11 29.01.22 General Modif.
12 04.04.22 General Modif.
AS BUILT STRUCTURE
LAYOUT PLAN 03 13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/225 SMR-LBL-ARC-AL-SD-L4 Rev.00
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
KEY PLAN
BOH RIVERSIDE
3455
4984 10235 1745 11000 19 nos
2170 726
21
21
1190
P 1200
1240
210
21
21
1000
1500 1500 5015 1500 5900
1500 1800 1500
4000
755
350
1500
1880
1500 1500 1500 1500 1500 1500 1500 1500 1500 1500
OWNER/ CLIENT
3000
deco cabinet/ storage)
O
21
350
21
4000
1800
1500 1500 1500 1500 1500 1500 1500 1500 1500 1500
720
720
N
4000
1800
1500 1500 1500 1500 1500 1500 1500 1500 1500 1500
BOH 7550
2250
RIGHT
CL 1
6000
4500
13000
10770
10000
M STAGE Consultant Architecture Design
2250
4000
1500 1500 1500 1500 1500 1500 1500 1500 1500 1500
1800
ADA
5160 2645
1420
100 ADRIEN DESPORT ARCHITECTURE
4000
1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 Apartment A0105 Block A,
1500
Hoang Anh River View
GUEST VESTIAIRE
1800
350
Ho Chi Minh City, Vietnam
projects@desport-architects.com
www.desport-architects.com
SL/FL 1
K
2500
4000
1500 1500 1500 1500 1500 1500 1500 1500 1500 1500
2200 2600
1880
1500
645
350
980
L.B.L. INTERNATIONAL
J ENTREPRISE GENERALE
BATIMENT - TRAVAUX PUBLICS
TECHNICAL
4000
3627 2081 2292 5710 2080 4210 4335 2080 1585 1585 2080 335 ROOM Nº 43 Sihanouk Boulevard,
Chaktomuk, Daun Penh
Phnom Penh, Cambodia
tel: +855(0)23.722.532
I +5.500 fax: +855(0)23.214.272
lblinternational@lbl-group.com
www.lbl-group.com
4000
1200
1680
DN
FDL 1
WC
2080
ST-D ST-C
PL-1 PL-2 H.C 1250
2555
2053
PROJECT NAME
250
Up 2200 2200 Up
SUN AND MOON THE
1550
1550
H
1625 RIVERSIDE
WC DRAWING PHASE :
1500
2100
4000
MALE DRAWING
FOYER
69696
600
DRAWING TITLE :
900
AS BUILT LEVEL 03
G WC
1500
3950
1570
FEMALE DESIGNED BY ADA
4000
1550
CHECKED BY LBL
APPROVED BY ADA
DATE 25-May-22 SCALE
A3,As shown
No. DATE DESCRIPTION
09 13.10.21 General Modif.
10 29.12.21 General Modif.
11 29.01.22 General Modif.
12 04.04.22 General Modif.
AS BUILT STRUCTURE
LAYOUT PLAN 03 13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/225 SMR-LBL-ARC-AL-SD-L4 Rev.13
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
AHU
AHU
AHU
AHU
AHU
AHU
AHU
Y
4. MASONRY WALLS SHALL BE 110mm; 160mm; 210 mm
4855
OR 250mm BRICK WITH 15mm THK CEMENT PLASTER
3175
72
+9.425
1190
FINISH ON BOTH SIDE UNLESS NOTED OTHERWISE
2125
1000
P
5. COLUMNS WITHOUT DIMENSION ARE TO BE
CENTERED ON GRIDLINES
1500 1500 5015 1500 1500 5245 1500 1800 1500
4000
6. FOR CONCRETE STRUCTURE DETAIL REFER TO
ENGINEER DRAWINGS.
21
O 7. FOR STEEL STRUCTURE DETAIL REFER TO
MAKE UP AREA (OPS) ENGINEER DRAWINGS
4000
KEY PLAN
TECHNICAL ROOM
4000
+9.875
7550
2250
CL 1
4485
M
2235
+5.500
4000
+9.425
5160 2675
1420
OWNER/ CLIENT
4000
1500
SL/FL 1
K
2600
4000
1800 465
+ 9.875
TECHNICAL
4000
ROOM
+9.875
I
2200
79
4000
DN DN
Up
ST-D ST-C Up
FDL 1
PL-1 PL-2 Consultant Architecture Design
1959
+9.095
H
4000
ADA
69696
STORAGE
RESTAURANT
E Soup Soup
Glo-ray Heat Strip Salad Display Cold Display
Soup Soup
Glo-ray Heat Strip Salad Display Cold Display
ARCHITECT & ENGINEER
PAU
4000
AHU ROOMAHU
L.B.L. INTERNATIONAL
1500
1500
ENTREPRISE GENERALE
8116
1500
D 1500
1500
BATIMENT - TRAVAUX PUBLICS
VIP ROOM VIP ROOM
4000
2020
Chaktomuk, Daun Penh
with Column Phnom Penh, Cambodia
C Salad Display Glo-ray Heat Strip
Soup Soup
Cold Display
tel: +855(0)23.722.532
Salad Display
Soup Soup
Glo-ray Heat Strip Cold Display
670 fax: +855(0)23.214.272
lblinternational@lbl-group.com
Blender
Chiller Display Citrus Juicer
Coffe machine
Wine Chiller
C C C Grinder
Juice Extractor
www.lbl-group.com
VIP ROOM
1773
TBC
9790
9696
1500
PROJECT NAME
5300
EVENT SALE SPACE
4000
2700
2900
MALE
WC
RIVERSIDE
1155 2310 1800
1200
DRAWING PHASE :
1815
7500 4217
B DRAWING
676
FEMALE
WC
MEP DRAWING TITLE :
PL-3 PL-4 PL-5 R.C
2500
ROOF AS BUILT LEVEL 03
2200 2200 2200
OSE STORAGE
8000
1080
1309
DESIGNED BY ADA
1315 2250 435 DRAWN BY LBL
BOH/STORAGE SL/FL 2
2550
CHECKED BY LBL
2103
2600
ST-B
LINEN
ST-A
R2
29
1
APPROVED BY ADA
A
243
DATE 25-May-22 SCALE
54
4055
A3,As shown
No. DATE DESCRIPTION
09 13.10.21 General Modif.
4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 10 29.12.21 General Modif.
44000 11 29.01.22 General Modif.
56000 12 04.04.22 General Modif.
AS BUILT STRUCTURE
LAYOUT PLAN 04 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/325 SMR-LBL-ARC-AL-SD-L4 Rev.13
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
4000
DN
ST-D
DN
FDL 1 5. COLUMNS WITHOUT DIMENSION ARE TO BE
ST-C
Up Up
CENTERED ON GRIDLINES
PL-1 PL-2
1959
6. FOR CONCRETE STRUCTURE DETAIL REFER TO
+9.095 ENGINEER DRAWINGS.
H
7. FOR STEEL STRUCTURE DETAIL REFER TO
ENGINEER DRAWINGS
4000
KEY PLAN
69696
STORAGE
G
4000
RESTAURANT
E Soup Soup
Glo-ray Heat Strip Salad Display Cold Display
Soup Soup
Glo-ray Heat Strip Salad Display Cold Display
PAU
4000
AHU ROOMAHU
1500
1500
8116
1500
D 1500
1500
2020
Consultant Architecture Design
with Column
C Salad Display Glo-ray Heat Strip
Soup Soup
Cold Display
ADA
Wine Chiller
C C C Grinder
Juice Extractor
VIP ROOM
1773
TBC
ADRIEN DESPORT ARCHITECTURE
9790 Apartment A0105 Block A,
9696
4000
2700 projects@desport-architects.com
2900
www.desport-architects.com
MALE
WC
1200
1155 2310 1800
1815
7500 4217
B L.B.L. INTERNATIONAL
676
FEMALE
WC ENTREPRISE GENERALE
MEP BATIMENT - TRAVAUX PUBLICS
PL-3 PL-4 PL-5 R.C
2500
ROOF
2200 2200 2200 Nº 43 Sihanouk Boulevard,
Chaktomuk, Daun Penh
OSE STORAGE
8000
1080
1309
tel: +855(0)23.722.532
fax: +855(0)23.214.272
lblinternational@lbl-group.com
1315 2250 435 www.lbl-group.com
BOH/STORAGE SL/FL 2
2550
2103
2600 R2
LINEN PROJECT NAME
ST-B ST-A 291
A
SUN AND MOON THE
243
54
4055
RIVERSIDE
DRAWING PHASE :
DRAWING
DRAWING TITLE :
4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 AS BUILT LEVEL 03
44000
56000 DESIGNED BY ADA
DRAWN BY LBL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
CHECKED BY LBL
APPROVED BY ADA
DATE 25-May-22 SCALE
A3,As shown
No. DATE DESCRIPTION
09 13.10.21 General Modif.
10 29.12.21 General Modif.
11 29.01.22 General Modif.
12 04.04.22 General Modif.
AS BUILT STRUCTURE
LAYOUT PLAN 04 13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/225 SMR-LBL-ARC-AL-SD-L4 Rev.00
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
KEY PLAN
AHU
AHU
AHU
AHU
AHU
AHU
AHU
Y
4855
OWNER/ CLIENT
3175
72
+9.425
1190
2125
1000
21
O
MAKE UP AREA (OPS)
4000
EQ
4000
+9.875
ADA
7550
2250
CL 1
3396
4485
M
ADRIEN DESPORT ARCHITECTURE
2235
Apartment A0105 Block A,
+5.500 Hoang Anh River View
4000
EQ
projects@desport-architects.com
www.desport-architects.com
5160 2675
1420
ARCHITECT & ENGINEER
4000
1500
L.B.L. INTERNATIONAL
ENTREPRISE GENERALE
SL/FL 1 BATIMENT - TRAVAUX PUBLICS
K
2600
Nº 43 Sihanouk Boulevard,
4000
+ 9.875
TECHNICAL
4000
DRAWING
4000
DN DN
Up
ST-D ST-C Up
FDL 1 DRAWING TITLE :
PL-1 PL-2
1959 AS BUILT LEVEL 03
+9.095
H
DESIGNED BY ADA
DRAWN BY LBL
CHECKED BY LBL
APPROVED BY ADA
DATE 25-May-22 SCALE
A3,As shown
No. DATE DESCRIPTION
09 13.10.21 General Modif.
10 29.12.21 General Modif.
11 29.01.22 General Modif.
12 04.04.22 General Modif.
AS BUILT STRUCTURE
LAYOUT PLAN 04 13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/225 SMR-LBL-ARC-AL-SD-L4 Rev.13
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
PANTRY
FINISH ON BOTH SIDE UNLESS NOTED OTHERWISE
MEETING ROOM MEETING ROOM
P 19 x 2
WC 5. COLUMNS WITHOUT DIMENSION ARE TO BE
CENTERED ON GRIDLINES
4000
48 x 2
HGGM GFC 6. FOR CONCRETE STRUCTURE DETAIL REFER TO
ENGINEER DRAWINGS.
MD Pantry
5025 4965
FOYER 42 x 2
1200
4000
KEY PLAN
MALE LOCKER 230 STAFF
N
1027
900
2000 900 900 400 EDIT&S DO E&M
STORAGE
PROCUREMENT
4000
700x1200
1000
400
1500
SMG
930
890
M
1000
900 DOSM
STAFF LOBBY
SMALL LAUNDRY/ LINEN/
4000
UNIFORM ROOM/
HSKP AMENITIES/
MEETING ROOM 1500
SALES & STORAGE CHEMICALS/
L MARKETING FLORIST
SMG HR OWNER/ CLIENT
DOHR&T
4000
FOYER
K
4000
MALE FEMALE
STORAGE
STATIONARY
WC WC
STORAGE
MEETING ROOM
J
4000
MEETING ROOM
4000
DN DN
Up
Up
PL-1 PL-2
Consultant Architecture Design
1200 1400
460
75
Dry Storage
780 2281
COFFEE CORNER
CORPORATE 162 PAU
4000
CORPORATE
COFFEE CORNER
ADA
69696
1200
210 210 210 Pot Wash Area
ADD
Washing Machine
1100 475 1605 1400 900 900 900
G 1200 1500 ADD
Opening (1.5mx1m)
Wall fully closed off on top
1863
1863
1863
Offset from FFL 1m
HANDS
SINK
1500 Mobile Wall H =1200
750
HANDS
HANDS
SINK
SINK
Apartment A0105 Block A,
Hoang Anh River View
1529
750 750
FRIDGE Thao Dien Ward, District 2,
600 700
Actual wall align L6
1000
Ho Chi Minh City, Vietnam
1453
2050
OPS comment
www.desport-architects.com
800
Preparation Area
C
1800
Table with Cabinet
Blender mixer 3ltr
4000
Hot Kitchen
Blender mixer 3ltr
2200
6700
800 x 800 800 x 800 800 x 800 800 x 800 800 x 800 800 x 800 800 x 800 800 x 800 C
Serving area
Counter with Cabinet
SOUP STATION
900
Preparation Area
GM EAM FC OFFICE 1150
ARCHITECT & ENGINEER
1200
E 800 x 800 800 x 800 800 x 800 800 x 800 Rice cooker
16 Trays 2/1
4000
FINANCE
800 x 800 800 x 800 800 x 800 800 x 800 800 x 800 800 x 800
Fixed Glass H=1.2m, offset 1m from FFL
Sliding door
L.B.L. INTERNATIONAL
F
ENTREPRISE GENERALE
2180
OPERATION OFFICES
Salad counter
800 x 800 800 x 800 800 x 800
KITCHEN 1448
4000
Walking Freezer
Vacook
Nº 43 Sihanouk Boulevard,
700
1000 1500
Chocolate room
1500 1500 1200 fax: +855(0)23.214.272
PROCUREMENT
lblinternational@lbl-group.com
800 x 800 800 x 800 800 x 800
800 x 800
Fixed Glass H=1.2m, offset 1m from FFL
1680 84
SECURITY
C C
www.lbl-group.com
800 x 800
& SAFETY 2700 3 Deck oven
CANTEEN
1540
MODULAR E
NURSING
400
MEETING 1800
9696
1910
Fixed Glass H=1.2m, offset 1m from FFL Bakery Area
ROOM
1200
Wall cut 150mm
PROJECT NAME
750
HANDS
SINK
OPS comment
C
3000
BEVERAGE
OSE
Bakery Mixer 30Ltr
Bun Divider
Dough Sheeter
SUN AND MOON THE
FOYER AREA FOR COFFEE
BREAK FOR MEETING ROOM
CABINET
1500
2000 2000
RIVERSIDE
Adjust Stair Step FOR GUEST
DOCE DRAWING PHASE :
B DRAWING
656
MEP
WC DRAWING TITLE :
753
AS BUILT LEVEL 05
TBC BY ADA/OPS
8000
MEP
DESIGNED BY ADA
HK
DRAWN BY LBL
940
WC CHECKED BY LBL
812
APPROVED BY ADA
785
A
DATE 25-May-22 SCALE
A3,As shown
No. DATE DESCRIPTION
09 13.10.21 General Modif.
4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 10 29.12.21 General Modif.
44000 11 29.01.22 General Modif.
56000 12 04.04.22 General Modif.
AS BUILT STRUCTURE
LAYOUT PLAN 05 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/325 SMR-LBL-ARC-AL-SD-L4 Rev.13
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
460
ENGINEER DRAWINGS.
75
Dry Storage 7. FOR STEEL STRUCTURE DETAIL REFER TO
780 2281
COFFEE CORNER
CORPORATE 162 PAU ENGINEER DRAWINGS
4000
1200 1400 1400
CORPORATE
COFFEE CORNER
69696
1200
210 210 210 Pot Wash Area
ADD
Washing Machine
1100 475 1605 1400 900 900 900
G 1200 1500 ADD
Opening (1.5mx1m)
Wall fully closed off on top
1863
1863
1863
Offset from FFL 1m
HANDS
SINK
1500 Mobile Wall H =1200
4000
750
HANDS
HANDS
SINK
SINK
1529
750 750
FRIDGE
600 700
Actual wall align L6
1000
Table with Cabinet
F Wall cut 150mm
1453
2050
OPS comment
800
Preparation Area
C
1800
Table with Cabinet
Blender mixer 3ltr
4000
Hot Kitchen
Blender mixer 3ltr
2200
6700
800 x 800 800 x 800 800 x 800 800 x 800 800 x 800 800 x 800 800 x 800 800 x 800 C
Serving area
OWNER/ CLIENT
SOUP STATION
900
Preparation Area
GM EAM FC OFFICE 1150
1200
E 800 x 800 800 x 800 800 x 800 800 x 800 Rice cooker
16 Trays 2/1
4000
2180
OPERATION OFFICES
Salad counter
800 x 800 800 x 800 800 x 800
KITCHEN 1448
4000
Walking Freezer
Vacook
Blender mixer 3ltr
1800
800 x 800 800 x 800 800 x 800 505
800 x 800 800 x 800 800 x 800
1000
Consultant Architecture Design
C
700
1000 1500 1500 1500 1200
Chocolate room
PROCUREMENT
800 x 800 800 x 800 800 x 800
800 x 800
Fixed Glass H=1.2m, offset 1m from FFL
1680 84
C C
SECURITY
800 x 800
& SAFETY
CANTEEN
2700 3 Deck oven
ADA
1540
MODULAR E
NURSING
400
MEETING 1800 ADRIEN DESPORT ARCHITECTURE
9696
1910
Fixed Glass H=1.2m, offset 1m from FFL Bakery Area
Apartment A0105 Block A,
ROOM
1200
Wall cut 150mm
750
HANDS
Hoang Anh River View
SINK
OPS comment
C
3000
BEVERAGE Bakery Mixer 30Ltr
Bun Divider
Ho Chi Minh City, Vietnam
projects@desport-architects.com
FOYER AREA FOR COFFEE OSE Dough Sheeter
www.desport-architects.com
CABINET
BREAK FOR MEETING ROOM 1500
2000 2000
Adjust Stair Step FOR GUEST
DOCE ARCHITECT & ENGINEER
B
656
L.B.L. INTERNATIONAL
MEP
WC ENTREPRISE GENERALE
753
BATIMENT - TRAVAUX PUBLICS
TBC BY ADA/OPS
8000
A PROJECT NAME
SUN AND MOON THE
RIVERSIDE
DRAWING PHASE :
DRAWING
4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 DRAWING TITLE :
44000 AS BUILT LEVEL 05
56000
DESIGNED BY ADA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 DRAWN BY LBL
CHECKED BY LBL
APPROVED BY ADA
DATE 25-May-22 SCALE
A3,As shown
No. DATE DESCRIPTION
09 13.10.21 General Modif.
10 29.12.21 General Modif.
11 29.01.22 General Modif.
12 04.04.22 General Modif.
AS BUILT STRUCTURE
LAYOUT PLAN 05 13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/225 SMR-LBL-ARC-AL-SD-L4 Rev.13
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
KEY PLAN
PANTRY
MEETING ROOM MEETING ROOM
P 19 x 2
WC
4000
48 x 2
HGGM GFC
MD Pantry
5025 4965 OWNER/ CLIENT
O
80
FOYER 42 x 2
1200
4000
1027
900
2000 900 900 400 EDIT&S DO E&M
STORAGE
PROCUREMENT
4000
700x1200
1000
400
1500
SMG
930
890
M
1000
DOSM Consultant Architecture Design
900 STAFF LOBBY
SMALL LAUNDRY/ LINEN/
4000
UNIFORM ROOM/
HSKP AMENITIES/
L
MEETING ROOM 1500
SALES &
MARKETING
STORAGE CHEMICALS/
FLORIST ADA
SMG HR ADRIEN DESPORT ARCHITECTURE
DOHR&T
4000
MALE FEMALE
STORAGE
STATIONARY
WC WC
STORAGE
MEETING ROOM
4000
DN DN
Up
Up
PL-1 PL-2
PROJECT NAME
1200 1400
SUN AND MOON THE
H
460
75
RIVERSIDE
Dry Storage DRAWING PHASE :
780 2281
COFFEE CORNER
COFFEE CORNER
69696
1200
210 210 210 Pot Wash Area
ADD
Washing Machine
1100 475 1605 1400 900 900 900 AS BUILT LEVEL 05
G 1200 1500 ADD
Opening (1.5mx1m)
Wall fully closed off on top
1863
1863
1863
Offset from FFL 1m
HANDS
SINK
1500 Mobile Wall H =1200 DESIGNED BY ADA
4000
DRAWN BY
750
LBL
HANDS
HANDS
SINK
SINK
CHECKED BY LBL
APPROVED BY ADA
DATE 25-May-22 SCALE
A3,As shown
No. DATE DESCRIPTION
09 13.10.21 General Modif.
10 29.12.21 General Modif.
11 29.01.22 General Modif.
12 04.04.22 General Modif.
AS BUILT STRUCTURE
LAYOUT PLAN 05 13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/225 SMR-LBL-ARC-AL-SD-L4 Rev.13
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
90
1795
CONCRETE PLINT H=100, BY OTHERS
SEATING 5. COLUMNS WITHOUT DIMENSION ARE TO BE
P
CT
CENTERED ON GRIDLINES
SF 01 SF 02
PIMTAS
IC5 Bike
IC5 Bike
SC
26080
PowerMill Climber
INPM Life Fitness
PIMTAS
6. FOR CONCRETE STRUCTURE DETAIL REFER TO
Heat
Heat
Row
Row
4000
ENGINEER DRAWINGS.
95T Elevation Treadmill
FP 01 FP 02 FP 03
PIMTAS
PIMTAS
PIMTAS
HP 7. FOR STEEL STRUCTURE DETAIL REFER TO
PIMTAS
PIMTAS
PIMTAS
CP VHP
95T Elevation Treadmill
ENGINEER DRAWINGS
10230
10230
CONCRETE PLINT H=100, BY OTHERS
4000
95T Elevation Treadmill
4200
Selectorized
95T Elevation Treadmill
ST FW-DB Hammer
N
Strength
Decline/Abdominal Bench
Shoulder Press
Abdominal Crunch
Seated Leg Curl
410
HS-SLC Hammer Select
3835
Adjustable Bench
700
FW-MAB Hammer
EQ1
410
600
4000
2346
HS-LE Hammer Select
Chest Press
HS-CP Hammer Select
410
ST
2122
1988 7874 100
EQ1
Adjustable Bench
4040
700
FW-MAB Hammer
HP TREAT
S
M HS-PD Hammer Select
CL 1
FW-DR2 Hammer
Adjustable Bench
200
FW-MAB Hammer
Biceps Curl
1928
HS-BC Hammer Select
800
4000
FW-UB75 Hammer
600
Lateral Raise
12545
Assist Dip Chin
HS-ADC Hammer Select
FW-BAR Hammer
OWNER/ CLIENT
1800
Barbell Rack
HS-RW Hammer Select
Seated Row
4286
9910
6991
CP
1467 3538 700
4000
Flexibility Trainer
OP-FS Axiom
1656
Seated Arm
Hammer
FW-AC
Curl
530
K SL/FL 1
3010
2705
Multi-Jungle 8-Stack
SEATING
FW-MAB Hammer
Shower
4580 3630 7790
2395
Smith Machine
EQ EQ HSSM Hammer
3369
J 1800
Shower
EQ
TREAT
WOODWAY CURVED TRAINER
4705
3054
RECEPTION
2220
2600
95T Elevation Treadmill
1290
95T Elevation Treadmill
WC
H.C
4000
FDL 1
2690
50 11900 3270 1500 2040 ST-D PL-1 PL-2 ST-C
2115
1910
Up to Up to 95T Elevation Treadmill
L7 L7
460
H
INPM Life Fitness
PowerMill Climber
ADA
46
4000
69696
4215
JANITOR
Elliptical Cross-Trainer
4000 95X Elevation
G
73
Elliptical Cross-Trainer
95X Elevation
ADRIEN DESPORT ARCHITECTURE
Apartment A0105 Block A,
4000
95R Elevation
F www.desport-architects.com
2370 Octane Air Dyne X
4000
Flexibility Trainer
OP-FS Axiom
BOH WET AREA/
2507
FW-BPS Hammer
PL-CALF Hammer Plate
Endurance Package
FITNESS
Storage
Foam Roller
PL-VSQ Hammer Plate
Yoga Mat
Yoga Mat
IL-KLC Hammer Iso
Kneeling Leg Curl
PL-GLD Hammer
V-Squat
IL-LP Hammer Iso
Glute Drive
L.B.L. INTERNATIONAL
Leg Press
90
4000
Yoga Mat
ENTREPRISE GENERALE
2669
6155
Octane Air Dyne X
SPARC Trainer
BATIMENT - TRAVAUX PUBLICS
D
STORAGE
Leg Extension
IL-WPD Hammer Iso
LF-DK-1000-01
LF-DK-1000-01
LF-DK-1000-01
STUDIO Deck
STUDIO Deck
STUDIO Deck
STUDIO Deck
Wide Pulldown
Nº 43 Sihanouk Boulevard,
4000
3599
HS-PB-2000-01
STUDIO Barbell Rack
Rack 5 Rack 5
IL-SP Hammer Iso
Shoulder Press
IL-DCP Hammer Iso
Decline Press Phnom Penh, Cambodia
tel: +855(0)23.722.532
IL-LR Hammer Iso
Low Row
LF-DK-1000-01
LF-DK-1000-01
LF-DK-1000-01
LF-DK-1000-01
STUDIO Deck
STUDIO Deck
STUDIO Deck
STUDIO Deck
C
Rowing
IL-ROW Hammer Iso
fax: +855(0)23.214.272
DIRECTOR OF
Escape TIYR
lblinternational@lbl-group.com
17016
WELLNESS
www.lbl-group.com
Olympic Flat Bench W/ O-BWS
LF-DK-1000-01
LF-DK-1000-01
LF-DK-1000-01
STUDIO Deck
STUDIO Deck
STUDIO Deck
STUDIO Deck
LF-STKBR-01
Wide Chest
3230
PROJECT NAME
Olympic Decline Bench W/ O-BWS
9696
LF-DK-1000-01
LF-DK-1000-01
LF-DK-1000-01
LF-DK-1000-01
STUDIO Deck
STUDIO Deck
STUDIO Deck
STUDIO Deck
O-DB Hammer
4627 4514
FXTM Synrgy360XM Mix
Power Rack
RIVERSIDE
5280
RECOVERY
WARM UP
/
210
LOUNGE
GL6-01A
DRAWING PHASE :
Removed DRAWING
the door
B
DRAWING TITLE :
Smash 7.0
Brunswick Table Tennis
MEP
IC
AS BUILT LEVEL 06
1850
5 Bi
ke
IC
5 Bi
ke
PL-3 PL-4 PL-5 1200
IC5
Bike
IC5
Bike
DESIGNED BY ADA
8000
1700
MEP BOH
8050
IC5 Bike
IC5 Bike
TENNIS TABLE Smash 7.0
Brunswick Table Tennis
Up to
L7
DRAWN BY LBL
SPINNING Up to
L7
HK
1350
Bike
IC5
Bike WC CHECKED BY LBL
IC5
SL/FL 2
95
5 Bi
ke
2271 APPROVED BY ADA
IC
5 Bi
ke
IC
WC
ST-B ST-A DATE 25-May-22 SCALE
A A3,As shown
No. DATE DESCRIPTION
4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 09 13.10.21 General Modif.
44000 10 29.12.21 General Modif.
56000 11 29.01.22 General Modif.
12 04.04.22 General Modif.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
AS BUILT STRUCTURE
LAYOUT PLAN 06 13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/325 SMR-LBL-ARC-AL-SD-L4 Rev.13
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
4000
6. FOR CONCRETE STRUCTURE DETAIL REFER TO
DN DN
ENGINEER DRAWINGS.
95T Elevation Treadmill
5285
FDL 1
2690
50 11900 3270 1500 2040 ST-D PL-1 PL-2 ST-C 7. FOR STEEL STRUCTURE DETAIL REFER TO
2115
1910
Up to Up to 95T Elevation Treadmill
ENGINEER DRAWINGS
L7 L7
460
KEY PLAN
INPM Life Fitness
PowerMill Climber
46
4000
69696
4215
JANITOR
Elliptical Cross-Trainer
95X Elevation
4000
G
73
Elliptical Cross-Trainer
95X Elevation
4000
Recumbent Bike
95R Elevation
Recumbent Bike
3000
95R Elevation
F OWNER/ CLIENT
2370 Octane Air Dyne X
4000
Flexibility Trainer
OP-FS Axiom
FW-BPS Hammer
PL-CALF Hammer Plate
Endurance Package
FITNESS
Storage
Foam Roller
PL-VSQ Hammer Plate
Yoga Mat
Yoga Mat
IL-KLC Hammer Iso
Kneeling Leg Curl
PL-GLD Hammer
V-Squat
IL-LP Hammer Iso
Glute Drive
Leg Press
90
4000
Yoga Mat
2669
Octane Air Dyne X
STORAGE
Leg Extension
LF-DK-1000-01
LF-DK-1000-01
LF-DK-1000-01
LF-DK-1000-01
STUDIO Deck
STUDIO Deck
STUDIO Deck
STUDIO Deck
Consultant Architecture Design
Wide Pulldown
4000
3599
HS-PB-2000-01
LF-STBBR-01
IL-SP Hammer Iso Rack 5 Rack 5
IL-DCP Hammer Iso
Shoulder Press
Decline Press
LF-DK-1000-01
LF-DK-1000-01
LF-DK-1000-01
STUDIO Deck
STUDIO Deck
STUDIO Deck
STUDIO Deck
ADA
Rowing
17016
WELLNESS
O-FB Hammer
Studio Kettlebell Rack
LF-DK-1000-01
LF-DK-1000-01
LF-DK-1000-01
STUDIO Deck
STUDIO Deck
STUDIO Deck
STUDIO Deck
LF-STKBR-01
Wide Chest
3230
O-IB Hammer
Thao Dien Ward, District 2,
Ho Chi Minh City, Vietnam
projects@desport-architects.com
LF-DK-1000-01
LF-DK-1000-01
LF-DK-1000-01
LF-DK-1000-01
STUDIO Deck
STUDIO Deck
STUDIO Deck
STUDIO Deck
O-DB Hammer
4627 4514
FXTM Synrgy360XM Mix
HDLPR HD Elite
ASSESSMENT
Power Rack
5280
RECOVERY
ARCHITECT & ENGINEER
WARM UP
/
210
LOUNGE
GL6-01A
Removed
L.B.L. INTERNATIONAL
the door ENTREPRISE GENERALE
BATIMENT - TRAVAUX PUBLICS
B
Smash 7.0
Brunswick Table Tennis
IC
MEP Nº 43 Sihanouk Boulevard,
1850
5B
ike
IC
5B
Chaktomuk, Daun Penh
ike
PL-3 PL-4 PL-5 1200 Phnom Penh, Cambodia
tel: +855(0)23.722.532
IC5
Bike
IC5
fax: +855(0)23.214.272
Bike
lblinternational@lbl-group.com
8000
MEP
1700
BOH www.lbl-group.com
8050
IC5 Bike
IC5 Bike
TENNIS TABLE
Smash 7.0
Brunswick Table Tennis
Up to
L7
SPINNING Up to
L7
HK
1350
Bike
IC5
Bike WC
IC5
PROJECT NAME
SL/FL 2 SUN AND MOON THE
95
ik e
2271
5B
5B
ike
IC
WC
IC
DRAWING TITLE :
4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 AS BUILT LEVEL 06
44000
56000 DESIGNED BY ADA
DRAWN BY LBL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
CHECKED BY LBL
APPROVED BY ADA
DATE 25-May-22 SCALE
A3,As shown
No. DATE DESCRIPTION
09 13.10.21 General Modif.
10 29.12.21 General Modif.
11 29.01.22 General Modif.
12 04.04.22 General Modif.
AS BUILT STRUCTURE
LAYOUT PLAN 06 13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/225 SMR-LBL-ARC-AL-SD-L4 Rev.00
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
KEY PLAN
90
1795
CONCRETE PLINT H=100, BY OTHERS
SEATING
P
SF 01 SF 02 CT
PIMTAS
IC5 Bike
IC5 Bike
SC
26080
PowerMill Climber
INPM Life Fitness
PIMTAS
Heat
Heat
Row
Row
4000
FP 01
PIMTAS
FP 02 FP 03
PIMTAS
PIMTAS
OWNER/ CLIENT
HP
PIMTAS
PIMTAS
PIMTAS
CP VHP
95T Elevation Treadmill
10230
10230
CONCRETE PLINT H=100, BY OTHERS
4200
Selectorized
95T Elevation Treadmill
ST FW-DB Hammer
N
Strength
Decline/Abdominal Bench
Shoulder Press
Abdominal Crunch
Seated Leg Curl
410
HS-SLC Hammer Select
3835
Adjustable Bench
700
FW-MAB Hammer
EQ1
410
600
4000
2346
HS-LE Hammer Select
Chest Press
HS-CP Hammer Select
410
ST
2122
EQ1
Adjustable Bench
4040
700
FW-MAB Hammer
HP TREAT
S
M HS-PD Hammer Select
CL 1
FW-DR2 Hammer
Adjustable Bench
200
FW-MAB Hammer
Biceps Curl
1928
800
4000
FW-UB75 Hammer
Lateral Raise
ADA
HS-HAB Hammer Select
Hip Abduction Pec Fly/Rear Delt
HS-FLY Hammer Select
12545
FW-BAR Hammer
1800
Barbell Rack
HS-RW Hammer Select
Seated Row
4286
9910
ADRIEN DESPORT ARCHITECTURE
6991
CP
1467 3538 700 Apartment A0105 Block A,
4000
Flexibility Trainer
OP-FS Axiom
1656
Seated Arm
Hammer
FW-AC
Ho Chi Minh City, Vietnam
Curl
530
projects@desport-architects.com
www.desport-architects.com
K SL/FL 1
3010
2705
Multi-Jungle 8-Stack
SEATING
FW-MAB Hammer
Shower
Smith Machine
EQ EQ HSSM Hammer
3369
ENTREPRISE GENERALE
J 1800 BATIMENT - TRAVAUX PUBLICS
Shower
EQ
TREAT
WOODWAY CURVED TRAINER
2600
WC
H.C
4000
Up to
L7
Up to
L7
95T Elevation Treadmill SUN AND MOON THE
RIVERSIDE
460
H
INPM Life Fitness
PowerMill Climber
DRAWING PHASE :
DRAWING
46
4000
69696
4215
DRAWING TITLE :
JANITOR
Elliptical Cross-Trainer
95X Elevation
AS BUILT LEVEL 06
4000
G
73
Elliptical Cross-Trainer
95X Elevation DESIGNED BY ADA
DRAWN BY LBL
4000
CHECKED BY LBL
APPROVED BY ADA
DATE 25-May-22 SCALE
A3,As shown
No. DATE DESCRIPTION
09 13.10.21 General Modif.
10 29.12.21 General Modif.
11 29.01.22 General Modif.
12 04.04.22 General Modif.
AS BUILT STRUCTURE
LAYOUT PLAN 06 13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/225 SMR-LBL-ARC-AL-SD-L4 Rev.13
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
14
4. MASONRY WALLS SHALL BE 110mm; 160mm; 210 mm
OR 250mm BRICK WITH 15mm THK CEMENT PLASTER
FINISH ON BOTH SIDE UNLESS NOTED OTHERWISE
P
P CENTERED ON GRIDLINES
4000
ENGINEER DRAWINGS.
Existing
7. FOR STEEL STRUCTURE DETAIL REFER TO
INFINITY SWIMMING POOL ENGINEER DRAWINGS
O
KEY PLAN
+ 24.020
+ 24.160
4000
i =1%
From +24.160
N To + 24.020
4000
+ 24.020 +23.970
M
4000
From +24.150
From +24.150
From +24.150
i =1%
i =1%
i =1.3%
To + 24.020
To + 24.020
To + 24.020
7397
6577
i=
Existing Fr 0.8%
To om
L + +24 OWNER/ CLIENT
24 .1
.02 60
0
MULTI FUNCTION
4000 POOL BAR LADDER FOR MAINTENANCE
+ 24.100 "BLOOM" ROOM
900
760 Pantry pool kitchen
Cold storage
4000
960
1000
2104
Washing area
F
+23.970
Pantry pool
1500
Female WC
Existing
60 1720 kitchen
C
J +23.970 WC &
1200
1500
Changing
Changing
Changing
4205
800
1900
4000
Glass washer
Changing
Changing
Reception 1800 2100
1000
Hot Cabinet (SV03) move from (L3)
750
+ 24.020
1300
I
1890
+23.970 Propose Ramp 700
Wall partition H=+1200mm
2757
2757
1500
1500
4000
Go Down
to L6
Go Down
to L6 700 1200 2437 Consultant Architecture Design
FDL 1 1315
800
PL-1 PL-2
2555
Existing 150 150
2000
Panini
400
1500
2200 2200
1752
4000
H 450
450
HANDS
SINK
1800
1800
Convection
Oven
ADA
4000
SALAMANDER
1500
F
3656
69696
750 750
1800
PANTRY
921
Pizza Oven
PM 60.60
4123
C
850
600
G
6112 ADRIEN DESPORT ARCHITECTURE
1800
Apartment A0105 Block A,
+ 24.030 + 24.070 + 24.050
7183
+23.970
4000
4610
4000
C
Thao Dien Ward, District 2,
Ho Chi Minh City, Vietnam
projects@desport-architects.com
C
F www.desport-architects.com
1200
4000
3584
1200
ARCHITECT & ENGINEER
695
0
E 500 R2
R
R
30
30
0
0
R1
R2
R1
+ 24.120 + 24.120 L.B.L. INTERNATIONAL
4000
ENTREPRISE GENERALE
T 01b T 01b BATIMENT - TRAVAUX PUBLICS
D 2450
T 04
STORAGE
Nº 43 Sihanouk Boulevard,
4000
T 03 T 03
T 02 T 02 Chaktomuk, Daun Penh
Phnom Penh, Cambodia
tel: +855(0)23.722.532
C fax: +855(0)23.214.272
lblinternational@lbl-group.com
www.lbl-group.com
+23.970
T 01 T 01 T 01 T 01
PROJECT NAME
9696
DRAWING PHASE :
DRAWING
R2 R3 2140
0 0
B 0
R80
DRAWING TITLE :
R1 R40 MEP
0 0 WC
PL-3 PL-4 PL-5 AS BUILT LEVEL 07
5
R4
1700
MEP
DESIGNED BY ADA
8000
4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 09 13.10.21 General Modif.
44000 10 29.12.21 General Modif.
56000 11 29.01.22 General Modif.
12 04.04.22 General Modif.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
AS BUILT STRUCTURE
LAYOUT PLAN 07 13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/325 SMR-LBL-ARC-AL-SD-L4 Rev.13
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
4000
6. FOR CONCRETE STRUCTURE DETAIL REFER TO
700 1200
to L6 to L6
FDL 1 ENGINEER DRAWINGS.
1315
PL-2
800
PL-1
2555
Existing 150 150
7. FOR STEEL STRUCTURE DETAIL REFER TO
2000
Panini
400
1500
2200 2200 ENGINEER DRAWINGS
4000
H 450 KEY PLAN
450
HANDS
SINK
1800
1800
Convection
Oven
4000
SALAMANDER
1500
F
3656
69696
750 750
1800
PANTRY
921
Pizza Oven
PM 60.60
4123
C
850
600
G
6112
1800
+ 24.030 + 24.070 + 24.050
7183
+23.970
4000
4610
4000
C
C
F OWNER/ CLIENT
1200
4000
3584
1200
695
0
E 500 R2
R
R
30
30
0
0
R1
R2
R1
+ 24.120 + 24.120
4000
T 01b T 01b
D 2450
T 04
Consultant Architecture Design
STORAGE
4000
T 03 T 03
T 02 T 02
C
ADA
ADRIEN DESPORT ARCHITECTURE
Apartment A0105 Block A,
Hoang Anh River View
+23.970 Thao Dien Ward, District 2,
Ho Chi Minh City, Vietnam
T 01 T 01 T 01 T 01 projects@desport-architects.com
www.desport-architects.com
9696
7640
ARCHITECT & ENGINEER
5
R4
L.B.L. INTERNATIONAL
R2 R3 2140
ENTREPRISE GENERALE
0 0 BATIMENT - TRAVAUX PUBLICS
B 0
R80
R1 R40 MEP
0 0 WC Nº 43 Sihanouk Boulevard,
PL-3 PL-4 PL-5 Chaktomuk, Daun Penh
5 Phnom Penh, Cambodia
R4 tel: +855(0)23.722.532
1700
fax: +855(0)23.214.272
MEP lblinternational@lbl-group.com
8000
T 04b www.lbl-group.com
SPA BOH
HK
T 06 T 05
SL/FL 2 PROJECT NAME
R3
SUN AND MOON THE
0
0 R3 LINEN
RIVERSIDE
A
DRAWING PHASE :
DRAWING
DRAWING TITLE :
4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 AS BUILT LEVEL 07
44000
56000 DESIGNED BY ADA
DRAWN BY LBL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
CHECKED BY LBL
APPROVED BY ADA
DATE 25-May-22 SCALE
A3,As shown
No. DATE DESCRIPTION
09 13.10.21 General Modif.
10 29.12.21 General Modif.
11 29.01.22 General Modif.
12 04.04.22 General Modif.
AS BUILT STRUCTURE
LAYOUT PLAN 07 13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/225 SMR-LBL-ARC-AL-SD-L4 Rev.13
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
14
6. FOR CONCRETE STRUCTURE DETAIL REFER TO
ENGINEER DRAWINGS.
KEY PLAN
P
P
4000
Existing
INFINITY SWIMMING POOL
O
+ 24.020
+ 24.160
4000
i =1%
From +24.160 OWNER/ CLIENT
N To + 24.020
4000
+ 24.020 +23.970
M
4000
From +24.150
From +24.150
From +24.150
i =1%
i =1%
i =1.3%
To + 24.020
To + 24.020
To + 24.020
7397
6577
i=
Existing Fr 0.8%
To om
L + 2 +24 Consultant Architecture Design
4.0 .16
20 0
MULTI FUNCTION
4000
K
+ 24.020
+ 24.100
+ 24.150
760 1500
Dry store
1500 1500 800
Male WC
ADA
900
760 Pantry pool kitchen ADRIEN DESPORT ARCHITECTURE
Cold storage
4000
1000
2104 Hoang Anh River View
Washing area
Thao Dien Ward, District 2,
F
+23.970 Ho Chi Minh City, Vietnam
Pantry pool
1500
Female WC projects@desport-architects.com
Existing www.desport-architects.com
60 1720 kitchen
C
J +23.970 WC &
1200
1500
Changing
Changing
Changing
4205
800
1900
ARCHITECT & ENGINEER
4000
Glass washer
Changing
Changing
Reception 1800 2100
1000
750
+ 24.020 L.B.L. INTERNATIONAL
1300
I
1890
2757
2757
1500
1500
4000
800
PL-1
2555
Chaktomuk, Daun Penh
Existing 150 150
Phnom Penh, Cambodia
2000
Panini
400
1500
2200 2200 tel: +855(0)23.722.532
1752
4000
H 450 lblinternational@lbl-group.com
450
www.lbl-group.com
HANDS
SINK
1800
1800
Convection
Oven
4000
SALAMANDER
1500
F
3656
69696
750 750
1800
PROJECT NAME
PANTRY
921
Pizza Oven
PM 60.60
4123 SUN AND MOON THE
C
850
600
G
6112
RIVERSIDE
1800
DRAWING PHASE :
+ 24.030 + 24.070 + 24.050
7183
+23.970
4000
4610
4000
DRAWING
C
DRAWING TITLE :
AS BUILT LEVEL 07
C
F
DESIGNED BY ADA
1200
4000
3584
DRAWN BY LBL
CHECKED BY LBL
1200
APPROVED BY ADA
695
R
R
30
30
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
4000
ENGINEER DRAWINGS.
4000
N
4000
M
CABANA
4000
TERRACE
L
OWNER/ CLIENT
4000
K
4000
GO Down
4000
to L7
2360
I BAR TERRACE PANTRY
1400
1500
4000
i = 5% FDL 1
2320 Consultant Architecture Design
F
400
1500
i = 5%
800
1200
H
1500
200
HANDS
SINK
ADA
C
4000
1500
69696
G
ADRIEN DESPORT ARCHITECTURE
Apartment A0105 Block A,
4000
L.B.L. INTERNATIONAL
4000
ENTREPRISE GENERALE
BATIMENT - TRAVAUX PUBLICS
D
SUN TERRACE
Nº 43 Sihanouk Boulevard,
4000
LOBBY
2000
STORAGE
7580 7790 7790 7790
7860
7860
+28.520
PROJECT NAME
9696
SUITE L8
11
SUITE L8
05
SUITE L8
03
SUITE L8
02
SUN AND MOON THE
RIVERSIDE
DRAWING PHASE :
CORRIDOR DRAWING
7461 4255 1080
B
DRAWING TITLE :
1705
600 600 600 600
x 1000 x 1000 x 1000 x 1000
MEP
AS BUILT LEVEL 08
DESIGNED BY ADA
8000
DRAWN BY LBL
7840
HOUSE KEEPING
12 10 08 01
HK CHECKED BY LBL
DELUXE DELUXE DELUXE 06 DELUXE
SL/FL 2
KING TWIN KING HANDICAP APPROVED BY ADA
600 600 600
LINEN 600
DATE 25-May-22 SCALE
A
x 1000 x 1000 x 1000 x 1000
A3,As shown
No. DATE DESCRIPTION
4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 09 13.10.21 General Modif.
44000 10 29.12.21 General Modif.
56000 11 29.01.22 General Modif.
12 04.04.22 General Modif.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
AS BUILT STRUCTURE
LAYOUT PLAN 08 13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/325 SMR-LBL-ARC-AL-SD-L4 Rev.13
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
4000
6. FOR CONCRETE STRUCTURE DETAIL REFER TO
i = 5% FDL 1 ENGINEER DRAWINGS.
F
400 7. FOR STEEL STRUCTURE DETAIL REFER TO
1500
i = 5% ENGINEER DRAWINGS
800
1200
H
C
KEY PLAN
1500
200
HANDS
SINK
C
4000
1500
69696
G
4000
F OWNER/ CLIENT
4000
E
4000
D
SUN TERRACE
Consultant Architecture Design
4000
C
600
x 1000
600
x 1000
600
x 1000
600
x 1000
600
x 1000
ADA
ADRIEN DESPORT ARCHITECTURE
LOBBY Apartment A0105 Block A,
2000
STORAGE
Hoang Anh River View
7580 7790 7790 7790 Thao Dien Ward, District 2,
7860
7860
Ho Chi Minh City, Vietnam
+28.520
projects@desport-architects.com
www.desport-architects.com
9696
L.B.L. INTERNATIONAL
CORRIDOR ENTREPRISE GENERALE
7461 4255 1080
BATIMENT - TRAVAUX PUBLICS
B
1705
600 600 600 600
x 1000 x 1000 x 1000 x 1000
HOUSE KEEPING
12 10 08 01
06 HK PROJECT NAME
DELUXE DELUXE DELUXE SL/FL 2 DELUXE
KING TWIN KING HANDICAP SUN AND MOON THE
600
x 1000
600
x 1000
600
x 1000
LINEN 600
x 1000
RIVERSIDE
A
DRAWING PHASE :
DRAWING
DRAWING TITLE :
4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 AS BUILT LEVEL 08
44000
56000 DESIGNED BY ADA
DRAWN BY LBL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
CHECKED BY LBL
APPROVED BY ADA
DATE 25-May-22 SCALE
A3,As shown
No. DATE DESCRIPTION
09 13.10.21 General Modif.
10 29.12.21 General Modif.
11 29.01.22 General Modif.
12 04.04.22 General Modif.
AS BUILT STRUCTURE
LAYOUT PLAN 08 13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/225 SMR-LBL-ARC-AL-SD-L4 Rev.13
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
KEY PLAN
P
4000
OWNER/ CLIENT
O
INFINITY SWIMMING POOL
CABANAS
4000
N
4000
M
Consultant Architecture Design
CABANA
4000
TERRACE
L ADA
ADRIEN DESPORT ARCHITECTURE
4000
L.B.L. INTERNATIONAL
J ENTREPRISE GENERALE
BATIMENT - TRAVAUX PUBLICS
GO Down
4000
to L7 Nº 43 Sihanouk Boulevard,
Chaktomuk, Daun Penh
Phnom Penh, Cambodia
tel: +855(0)23.722.532
2360
I BAR TERRACE PANTRY
fax: +855(0)23.214.272
1400
lblinternational@lbl-group.com
www.lbl-group.com
1500
4000
2320
i = 5% FDL 1
F
400 PROJECT NAME
1500
i = 5%
SUN AND MOON THE
800
1200
H
C
RIVERSIDE
1500
200
DRAWING PHASE :
HANDS
SINK
C
4000
DRAWING
1500
69696
DRAWING TITLE :
AS BUILT LEVEL 08
G
DESIGNED BY ADA
4000
DRAWN BY LBL
CHECKED BY LBL
APPROVED BY ADA
DATE 25-May-22 SCALE
A3,As shown
No. DATE DESCRIPTION
09 13.10.21 General Modif.
10 29.12.21 General Modif.
11 29.01.22 General Modif.
12 04.04.22 General Modif.
AS BUILT STRUCTURE
LAYOUT PLAN 08 13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/225 SMR-LBL-ARC-AL-SD-L4 Rev.13
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
KEY PLAN
C
DINING ROOM
600 600 600 600 600 600
x 1000 x 1000 x 1000 x 1000 x 1000 x 1000
OWNER/ CLIENT
LUXURY KING STORAGE KITCHEN
DELUXE
TWIN
RECEPTION
9695
CHAIRMAN'S ROOM
CABINETS CABINETS
Consultant Architecture Design
17695
600
x 1000
600
x 1000
600
x 1000
600
x 1000
B
ADA
ADRIEN DESPORT ARCHITECTURE
MEP Apartment A0105 Block A,
Hoang Anh River View
Thao Dien Ward, District 2,
Ho Chi Minh City, Vietnam
projects@desport-architects.com
www.desport-architects.com
8000
MEP ARCHITECT & ENGINEER
7840
12 10 08 06 L.B.L. INTERNATIONAL
HK ENTREPRISE GENERALE
DELUXE DELUXE DELUXE DELUXE SL/FL 2 BATIMENT - TRAVAUX PUBLICS
TWIN KING TWIN KING DELUXE TRIPLE
Nº 43 Sihanouk Boulevard,
Chaktomuk, Daun Penh
600 600 600 LINEN 600 Phnom Penh, Cambodia
x 1000 x 1000 x 1000 x 1000
A tel: +855(0)23.722.532
fax: +855(0)23.214.272
lblinternational@lbl-group.com
www.lbl-group.com
PROJECT NAME
4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 SUN AND MOON THE
40000 RIVERSIDE
DRAWING PHASE :
DRAWING
DRAWING TITLE :
4 5 6 7 8 9 10 11 12 13 14
AS BUILT LEVEL 09
DESIGNED BY ADA
DRAWN BY LBL
CHECKED BY LBL
APPROVED BY ADA
DATE 25-May-22 SCALE
A3,As shown
No. DATE DESCRIPTION
09 13.10.21 General Modif.
10 29.12.21 General Modif.
11 29.01.22 General Modif.
12 04.04.22 General Modif.
AS BUILT STRUCTURE
LAYOUT PLAN 09 13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/150 SMR-LBL-ARC-AL-SD-L4 Rev.13
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
KEY PLAN
%
2
2
=
=
SLOPE
SLOPE
SLOPE
SLOPE
SLOPE
i
i
% % % % %
2 2 2 2 2
= = = = =
2 2 2 2 2
% % % % %
% % % % %
2 2 2 2 2
= = = = =
C
600 600 600 600 600 600
x 1000 x 1000 x 1000 x 1000 x 1000 x 1000
9695
Consultant Architecture Design
17695
600
x 1000
600
x 1000
600
x 1000
600
x 1000
B
ADA
ADRIEN DESPORT ARCHITECTURE
MEP Apartment A0105 Block A,
Hoang Anh River View
Thao Dien Ward, District 2,
Ho Chi Minh City, Vietnam
projects@desport-architects.com
www.desport-architects.com
8000
MEP ARCHITECT & ENGINEER
7841
12 10 08 06 L.B.L. INTERNATIONAL
01 ENTREPRISE GENERALE
HK
DELUXE DELUXE DELUXE DELUXE 11.64 m2 SL/FL 2 BATIMENT - TRAVAUX PUBLICS
KING KING TWIN TWIN DELUXE TRIPLE
Nº 43 Sihanouk Boulevard,
Chaktomuk, Daun Penh
600 600 600
LINEN 600
x 1000 x 1000 x 1000 x 1000
Phnom Penh, Cambodia
A tel: +855(0)23.722.532
fax: +855(0)23.214.272
2725 lblinternational@lbl-group.com
5
4055 www.lbl-group.com
PROJECT NAME
4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 SUN AND MOON THE
40000 RIVERSIDE
DRAWING PHASE :
DRAWING
DRAWING TITLE :
4 5 6 7 8 9 10 11 12 13 14
AS BUILT LEVEL 10
DESIGNED BY ADA
DRAWN BY LBL
CHECKED BY LBL
APPROVED BY ADA
DATE 25-May-22 SCALE
A3,As shown
No. DATE DESCRIPTION
09 13.10.21 General Modif.
10 29.12.21 General Modif.
11 29.01.22 General Modif.
12 04.04.22 General Modif.
AS BUILT STRUCTURE
LAYOUT PLAN 10 13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/150 SMR-LBL-ARC-AL-SD-L4 Rev.13
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
KEY PLAN
%
2
2
=
=
SLOPE
SLOPE
SLOPE
SLOPE
i
i
% % % %
2 2 2 2
= = = =
2 2 2 2
% % % %
% % % %
2 2 2 2
= = = =
C
600 600 600 600 600 600
x 1000 x 1000 x 1000 x 1000 x 1000 x 1000
OWNER/ CLIENT
LUXURY KING DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE
KING KING TWIN KING TWIN KING TWIN TWIN
14
13 11 09 07 05 04 03 02
7860
9695
Consultant Architecture Design
17695
600
x 1000
600
x 1000
600
x 1000
600
x 1000
B
ADA
ADRIEN DESPORT ARCHITECTURE
MEP Apartment A0105 Block A,
Hoang Anh River View
PL-3 PL-4 PL-5 Thao Dien Ward, District 2,
Ho Chi Minh City, Vietnam
projects@desport-architects.com
www.desport-architects.com
8000
MEP ARCHITECT & ENGINEER
ST-B
7840
12 10 08 06 L.B.L. INTERNATIONAL
HK 01 ENTREPRISE GENERALE
DELUXE DELUXE DELUXE DELUXE 11.64 m2 SL/FL 2 BATIMENT - TRAVAUX PUBLICS
TWIN TWIN KING KING DELUXE TRIPLE
Nº 43 Sihanouk Boulevard,
Chaktomuk, Daun Penh
600 600 600
LINEN 600
x 1000 x 1000 x 1000 x 1000
Phnom Penh, Cambodia
A tel: +855(0)23.722.532
fax: +855(0)23.214.272
lblinternational@lbl-group.com
www.lbl-group.com
PROJECT NAME
4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 SUN AND MOON THE
40000 RIVERSIDE
DRAWING PHASE :
DRAWING
DRAWING TITLE :
4 5 6 7 8 9 10 11 12 13 14
AS BUILT LEVEL 11
DESIGNED BY ADA
DRAWN BY LBL
CHECKED BY LBL
APPROVED BY ADA
DATE 25-May-22 SCALE
A3,As shown
No. DATE DESCRIPTION
09 13.10.21 General Modif.
10 29.12.21 General Modif.
11 29.01.22 General Modif.
12 04.04.22 General Modif.
AS BUILT STRUCTURE
LAYOUT PLAN 11 13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/150 SMR-LBL-ARC-AL-SD-L4 Rev.13
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
KEY PLAN
%
2
2
=
=
SLOPE
SLOPE
SLOPE
SLOPE
SLOPE
i
i
% % % % %
2 2 2 2 2
= = = = =
2 2 2 2 2
% % % % %
% % % % %
2 2 2 2 2
= = = = =
C
600 600 600 600 600 600
x 1000 x 1000 x 1000 x 1000 x 1000 x 1000
DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE OWNER/ CLIENT
LUXURY KING KING KING TWIN KING TWIN KING TWIN TWIN
14 13 11 09 07 05 04 03 02
7860
9695
Consultant Architecture Design
17695
600
x 1000
600
x 1000
600
x 1000
600
x 1000
B
ADA
ADRIEN DESPORT ARCHITECTURE
MEP Apartment A0105 Block A,
Hoang Anh River View
PL-3 PL-4 PL-5 Thao Dien Ward, District 2,
Ho Chi Minh City, Vietnam
projects@desport-architects.com
www.desport-architects.com
8000
MEP ARCHITECT & ENGINEER
01
7840
PROJECT NAME
4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 SUN AND MOON THE
40000 RIVERSIDE
DRAWING PHASE :
DRAWING
DRAWING TITLE :
4 5 6 7 8 9 10 11 12 13 14
AS BUILT LEVEL 12
DESIGNED BY ADA
DRAWN BY LBL
CHECKED BY LBL
APPROVED BY ADA
DATE 25-May-22 SCALE
A3,As shown
No. DATE DESCRIPTION
09 13.10.21 General Modif.
10 29.12.21 General Modif.
11 29.01.22 General Modif.
12 04.04.22 General Modif.
AS BUILT STRUCTURE
LAYOUT PLAN 12 13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/150 SMR-LBL-ARC-AL-SD-L4 Rev.13
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
KEY PLAN
%
2
2
=
=
SLOPE
SLOPE
SLOPE
SLOPE
i
i
% % % %
2 2 2 2
= = = =
2 2 2 2
% % % %
% % % %
2 2 2 2
= = = =
C
600 600 600 600 600 600
x 1000 x 1000 x 1000 x 1000 x 1000 x 1000
OWNER/ CLIENT
LUXURY KING DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE
KING KING TWIN KING TWIN KING TWIN TWIN
14 13 11 09 07 05 04 03 02
7860
9695
Consultant Architecture Design
17695
600
x 1000
600
x 1000
600
x 1000
600
x 1000
B
ADA
ADRIEN DESPORT ARCHITECTURE
MEP Apartment A0105 Block A,
Hoang Anh River View
PL-3 PL-4 PL-5 Thao Dien Ward, District 2,
Ho Chi Minh City, Vietnam
projects@desport-architects.com
www.desport-architects.com
8000
MEP ARCHITECT & ENGINEER
7840
12 10 08 06 L.B.L. INTERNATIONAL
HK 01 ENTREPRISE GENERALE
DELUXE DELUXE DELUXE DELUXE 11.64 m2 SL/FL 2 BATIMENT - TRAVAUX PUBLICS
TWIN KING TWIN KING DELUXE TRIPLE
Nº 43 Sihanouk Boulevard,
Chaktomuk, Daun Penh
600 600 600
LINEN 600
x 1000 x 1000 x 1000 x 1000
Phnom Penh, Cambodia
A tel: +855(0)23.722.532
fax: +855(0)23.214.272
lblinternational@lbl-group.com
www.lbl-group.com
PROJECT NAME
4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 SUN AND MOON THE
40000 RIVERSIDE
DRAWING PHASE :
DRAWING
DRAWING TITLE :
4 5 6 7 8 9 10 11 12 13 14
AS BUILT LEVEL 13
DESIGNED BY ADA
DRAWN BY LBL
CHECKED BY LBL
APPROVED BY ADA
DATE 25-May-22 SCALE
A3,As shown
No. DATE DESCRIPTION
09 13.10.21 General Modif.
10 29.12.21 General Modif.
11 29.01.22 General Modif.
12 04.04.22 General Modif.
AS BUILT STRUCTURE
LAYOUT PLAN 13 13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/150 SMR-LBL-ARC-AL-SD-L4 Rev.13
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
KEY PLAN
%
2
2
=
=
SLOPE
SLOPE
SLOPE
SLOPE
SLOPE
i
i
% % % % %
2 2 2 2 2
= = = = =
2 2 2 2 2
% % % % %
% % % % %
2 2 2 2 2
= = = = =
C
600 600 600 600 600 600
x 1000 x 1000 x 1000 x 1000 x 1000 x 1000
9695
Consultant Architecture Design
17695
600
x 1000
600
x 1000
600
x 1000
600
x 1000
B
ADA
ADRIEN DESPORT ARCHITECTURE
MEP Apartment A0105 Block A,
Hoang Anh River View
Thao Dien Ward, District 2,
Ho Chi Minh City, Vietnam
projects@desport-architects.com
www.desport-architects.com
8000
MEP ARCHITECT & ENGINEER
7841
12 10 08 06 L.B.L. INTERNATIONAL
01 ENTREPRISE GENERALE
HK
DELUXE DELUXE DELUXE DELUXE 11.64 m2 SL/FL 2 BATIMENT - TRAVAUX PUBLICS
KING KING TWIN TWIN DELUXE TRIPLE
Nº 43 Sihanouk Boulevard,
Chaktomuk, Daun Penh
600 600 600
LINEN 600
x 1000 x 1000 x 1000 x 1000
Phnom Penh, Cambodia
A tel: +855(0)23.722.532
fax: +855(0)23.214.272
lblinternational@lbl-group.com
www.lbl-group.com
PROJECT NAME
4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 SUN AND MOON THE
40000 RIVERSIDE
DRAWING PHASE :
DRAWING
DRAWING TITLE :
4 5 6 7 8 9 10 11 12 13 14
AS BUILT LEVEL 14
DESIGNED BY ADA
DRAWN BY LBL
CHECKED BY LBL
APPROVED BY ADA
DATE 25-May-22 SCALE
A3,As shown
No. DATE DESCRIPTION
09 13.10.21 General Modif.
10 29.12.21 General Modif.
11 29.01.22 General Modif.
12 04.04.22 General Modif.
AS BUILT STRUCTURE
LAYOUT PLAN 14 13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/150 SMR-LBL-ARC-AL-SD-L4 Rev.13
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
KEY PLAN
%
2
2
=
=
SLOPE
SLOPE
SLOPE
SLOPE
i
i
% % % %
2 2 2 2
= = = =
2 2 2 2
% % % %
% % % %
2 2 2 2
= = = =
C
600 600 600 600 600 600
x 1000 x 1000 x 1000 x 1000 x 1000 x 1000
OWNER/ CLIENT
LUXURY KING DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE
KING KING TWIN KING TWIN KING TWIN TWIN
14
13 11 09 07 05 04 03 02
7860
9695
Consultant Architecture Design
17695
600
x 1000
600
x 1000
600
x 1000
600
x 1000
B
ADA
ADRIEN DESPORT ARCHITECTURE
MEP Apartment A0105 Block A,
Hoang Anh River View
PL-3 PL-4 PL-5 Thao Dien Ward, District 2,
Ho Chi Minh City, Vietnam
projects@desport-architects.com
www.desport-architects.com
8000
MEP ARCHITECT & ENGINEER
ST-B
7840
12 10 08 06 L.B.L. INTERNATIONAL
HK 01 ENTREPRISE GENERALE
DELUXE DELUXE DELUXE DELUXE 11.64 m2 SL/FL 2 BATIMENT - TRAVAUX PUBLICS
TWIN TWIN KING KING DELUXE TRIPLE
Nº 43 Sihanouk Boulevard,
Chaktomuk, Daun Penh
600 600 600
LINEN 600
x 1000 x 1000 x 1000 x 1000
Phnom Penh, Cambodia
A tel: +855(0)23.722.532
fax: +855(0)23.214.272
lblinternational@lbl-group.com
www.lbl-group.com
PROJECT NAME
4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 SUN AND MOON THE
40000 RIVERSIDE
DRAWING PHASE :
DRAWING
DRAWING TITLE :
4 5 6 7 8 9 10 11 12 13 14
AS BUILT LEVEL 15
DESIGNED BY ADA
DRAWN BY LBL
CHECKED BY LBL
APPROVED BY ADA
DATE 25-May-22 SCALE
A3,As shown
No. DATE DESCRIPTION
09 13.10.21 General Modif.
10 29.12.21 General Modif.
11 29.01.22 General Modif.
12 04.04.22 General Modif.
AS BUILT STRUCTURE
LAYOUT PLAN 15 13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/150 SMR-LBL-ARC-AL-SD-L4 Rev.13
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
KEY PLAN
%
2
2
=
=
SLOPE
SLOPE
SLOPE
SLOPE
SLOPE
i
i
% % % % %
2 2 2 2 2
= = = = =
2 2 2 2 2
% % % % %
% % % % %
2 2 2 2 2
= = = = =
C
600 600 600 600 600 600
x 1000 x 1000 x 1000 x 1000 x 1000 x 1000
DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE OWNER/ CLIENT
LUXURY KING KING KING TWIN KING TWIN KING TWIN TWIN
14 13 11 09 07 05 04 03 02
7860
9695
Consultant Architecture Design
17695
600
x 1000
600
x 1000
600
x 1000
600
x 1000
B
ADA
ADRIEN DESPORT ARCHITECTURE
MEP Apartment A0105 Block A,
Hoang Anh River View
PL-3 PL-4 PL-5 Thao Dien Ward, District 2,
Ho Chi Minh City, Vietnam
projects@desport-architects.com
www.desport-architects.com
8000
MEP ARCHITECT & ENGINEER
01
7840
PROJECT NAME
4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 SUN AND MOON THE
40000 RIVERSIDE
DRAWING PHASE :
DRAWING
DRAWING TITLE :
4 5 6 7 8 9 10 11 12 13 14
AS BUILT LEVEL 16
DESIGNED BY ADA
DRAWN BY LBL
CHECKED BY LBL
APPROVED BY ADA
DATE 25-May-22 SCALE
A3,As shown
No. DATE DESCRIPTION
09 13.10.21 General Modif.
10 29.12.21 General Modif.
11 29.01.22 General Modif.
12 04.04.22 General Modif.
AS BUILT STRUCTURE
LAYOUT PLAN 16 13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/150 SMR-LBL-ARC-AL-SD-L4 Rev.13
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
KEY PLAN
%
2
2
=
=
SLOPE
SLOPE
SLOPE
SLOPE
i
i
% % % %
2 2 2 2
= = = =
2 2 2 2
% % % %
% % % %
2 2 2 2
= = = =
C
600 600 600 600 600 600
x 1000 x 1000 x 1000 x 1000 x 1000 x 1000
OWNER/ CLIENT
LUXURY KING DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE
KING KING TWIN KING TWIN KING TWIN TWIN
14 13 11 09 07 05 04 03 02
7860
9695
Consultant Architecture Design
17695
600
x 1000
600
x 1000
600
x 1000
600
x 1000
B
ADA
ADRIEN DESPORT ARCHITECTURE
MEP Apartment A0105 Block A,
Hoang Anh River View
PL-3 PL-4 PL-5 Thao Dien Ward, District 2,
Ho Chi Minh City, Vietnam
projects@desport-architects.com
www.desport-architects.com
8000
MEP ARCHITECT & ENGINEER
7840
12 10 08 06 L.B.L. INTERNATIONAL
HK 01 ENTREPRISE GENERALE
DELUXE DELUXE DELUXE DELUXE 11.64 m2 SL/FL 2 BATIMENT - TRAVAUX PUBLICS
TWIN KING TWIN KING DELUXE TRIPLE
Nº 43 Sihanouk Boulevard,
LINEN Chaktomuk, Daun Penh
600 600 600 600
x 1000 x 1000 x 1000 x 1000
Phnom Penh, Cambodia
A tel: +855(0)23.722.532
fax: +855(0)23.214.272
lblinternational@lbl-group.com
www.lbl-group.com
PROJECT NAME
4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 SUN AND MOON THE
40000 RIVERSIDE
DRAWING PHASE :
DRAWING
DRAWING TITLE :
4 5 6 7 8 9 10 11 12 13 14
AS BUILT LEVEL 17
DESIGNED BY ADA
DRAWN BY LBL
CHECKED BY LBL
APPROVED BY ADA
DATE 25-May-22 SCALE
A3,As shown
No. DATE DESCRIPTION
09 13.10.21 General Modif.
10 29.12.21 General Modif.
11 29.01.22 General Modif.
12 04.04.22 General Modif.
AS BUILT STRUCTURE
LAYOUT PLAN 17 13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/150 SMR-LBL-ARC-AL-SD-L4 Rev.13
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
KEY PLAN
%
2
2
=
=
SLOPE
SLOPE
SLOPE
SLOPE
SLOPE
i
i
% % % % %
2 2 2 2 2
= = = = =
2 2 2 2 2
% % % % %
% % % % %
2 2 2 2 2
= = = = =
C
600 600 600 600 600 600
x 1000 x 1000 x 1000 x 1000 x 1000 x 1000
9695
Consultant Architecture Design
17695
7500 4217
B
ADA
68
600 600 600 600
x 1000 x 1000 x 1000 x 1000
1000
Thao Dien Ward, District 2,
Ho Chi Minh City, Vietnam
projects@desport-architects.com
1200 www.desport-architects.com
2620
4407 3790 3790 3790
8000
MEP ARCHITECT & ENGINEER
7841
12 10 08 06 L.B.L. INTERNATIONAL
01
HK ENTREPRISE GENERALE
DELUXE DELUXE DELUXE DELUXE 11.64 m2 SL/FL 2 BATIMENT - TRAVAUX PUBLICS
KING KING TWIN TWIN DELUXE TRIPLE
Nº 43 Sihanouk Boulevard,
LINEN Chaktomuk, Daun Penh
600 600 600 600
x 1000 x 1000 x 1000 x 1000
Phnom Penh, Cambodia
A tel: +855(0)23.722.532
fax: +855(0)23.214.272
2725 lblinternational@lbl-group.com
5
4055 www.lbl-group.com
PROJECT NAME
4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 SUN AND MOON THE
40000 RIVERSIDE
DRAWING PHASE :
DRAWING
DRAWING TITLE :
4 5 6 7 8 9 10 11 12 13 14
AS BUILT LEVEL 18
DESIGNED BY ADA
DRAWN BY LBL
CHECKED BY LBL
APPROVED BY ADA
DATE 25-May-22 SCALE
A3,As shown
No. DATE DESCRIPTION
09 13.10.21 General Modif.
10 29.12.21 General Modif.
11 29.01.22 General Modif.
12 04.04.22 General Modif.
AS BUILT STRUCTURE
LAYOUT PLAN 18 13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/150 SMR-LBL-ARC-AL-SD-L4 Rev.13
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
KEY PLAN
%
2
2
=
=
SLOPE
SLOPE
SLOPE
SLOPE
i
i
% % % %
2 2 2 2
= = = =
2 2 2 2
% % % %
% % % %
2 2 2 2
= = = =
C
600 600 600 600 600 600
x 1000 x 1000 x 1000 x 1000 x 1000 x 1000
OWNER/ CLIENT
LUXURY KING DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE
KING KING TWIN KING TWIN KING TWIN TWIN
14
13 11 09 07 05 04 03 02
7860
9695
Consultant Architecture Design
17695
600
x 1000
600
x 1000
600
x 1000
600
x 1000
B
ADA
ADRIEN DESPORT ARCHITECTURE
MEP Apartment A0105 Block A,
Hoang Anh River View
PL-3 PL-4 PL-5 Thao Dien Ward, District 2,
Ho Chi Minh City, Vietnam
projects@desport-architects.com
www.desport-architects.com
8000
MEP ARCHITECT & ENGINEER
ST-B
7840
12 10 08 06 L.B.L. INTERNATIONAL
HK 01 ENTREPRISE GENERALE
DELUXE DELUXE DELUXE DELUXE 11.64 m2 SL/FL 2 BATIMENT - TRAVAUX PUBLICS
TWIN TWIN KING KING DELUXE TRIPLE
Nº 43 Sihanouk Boulevard,
LINEN Chaktomuk, Daun Penh
600 600 600 600
x 1000 x 1000 x 1000 x 1000
Phnom Penh, Cambodia
A tel: +855(0)23.722.532
fax: +855(0)23.214.272
lblinternational@lbl-group.com
www.lbl-group.com
PROJECT NAME
4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 SUN AND MOON THE
40000 RIVERSIDE
DRAWING PHASE :
DRAWING
DRAWING TITLE :
4 5 6 7 8 9 10 11 12 13 14
AS BUILT LEVEL 19
DESIGNED BY ADA
DRAWN BY LBL
CHECKED BY LBL
APPROVED BY ADA
DATE 25-May-22 SCALE
A3,As shown
No. DATE DESCRIPTION
09 13.10.21 General Modif.
10 29.12.21 General Modif.
11 29.01.22 General Modif.
12 04.04.22 General Modif.
AS BUILT STRUCTURE
LAYOUT PLAN 19 13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/150 SMR-LBL-ARC-AL-SD-L4 Rev.13
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
KEY PLAN
%
2
2
=
=
SLOPE
SLOPE
SLOPE
SLOPE
SLOPE
i
i
% % % % %
2 2 2 2 2
= = = = =
2 2 2 2 2
% % % % %
% % % % %
2 2 2 2 2
= = = = =
C
600 600 600 600 600 600
x 1000 x 1000 x 1000 x 1000 x 1000 x 1000
DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE DELUXE OWNER/ CLIENT
LUXURY KING KING KING TWIN KING TWIN KING TWIN TWIN
14 13 11 09 07 05 04 03 02
7860
9695
Consultant Architecture Design
17695
600
x 1000
600
x 1000
600
x 1000
600
x 1000
B
ADA
ADRIEN DESPORT ARCHITECTURE
MEP Apartment A0105 Block A,
Hoang Anh River View
PL-3 PL-4 PL-5 Thao Dien Ward, District 2,
Ho Chi Minh City, Vietnam
projects@desport-architects.com
www.desport-architects.com
8000
MEP ARCHITECT & ENGINEER
01
7840
PROJECT NAME
4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 SUN AND MOON THE
40000 RIVERSIDE
DRAWING PHASE :
DRAWING
DRAWING TITLE :
4 5 6 7 8 9 10 11 12 13 14
AS BUILT LEVEL 20
DESIGNED BY ADA
DRAWN BY LBL
CHECKED BY LBL
APPROVED BY ADA
DATE 25-May-22 SCALE
A3,As shown
No. DATE DESCRIPTION
09 13.10.21 General Modif.
10 29.12.21 General Modif.
11 29.01.22 General Modif.
12 04.04.22 General Modif.
AS BUILT STRUCTURE
LAYOUT PLAN 20 13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/150 SMR-LBL-ARC-AL-SD-L4 Rev.13
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
KEY PLAN
%
2
2
=
=
SLOPE
SLOPE
SLOPE
SLOPE
i
i
% % % %
2 2 2 2
= = = =
2 2 2 2
% % % %
% % % %
2 2 2 2
= = = =
C
600 600 600 600 600 600
x 1000 x 1000 x 1000 x 1000 x 1000 x 1000
90
9695
93
1760
85
1300
60
17695
600
x 1000
600
x 1000
600
x 1000
600
x 1000
B
ADA
ADRIEN DESPORT ARCHITECTURE
MEP Apartment A0105 Block A,
Hoang Anh River View
Thao Dien Ward, District 2,
Ho Chi Minh City, Vietnam
projects@desport-architects.com
www.desport-architects.com
8000
MEP 01 ARCHITECT & ENGINEER
7840
PROJECT NAME
4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 SUN AND MOON THE
40000 RIVERSIDE
DRAWING PHASE :
DRAWING
DRAWING TITLE :
4 5 6 7 8 9 10 11 12 13 14
AS BUILT LEVEL 21
DESIGNED BY ADA
DRAWN BY LBL
CHECKED BY LBL
APPROVED BY ADA
DATE 25-May-22 SCALE
A3,As shown
No. DATE DESCRIPTION
09 13.10.21 General Modif.
10 29.12.21 General Modif.
11 29.01.22 General Modif.
12 04.04.22 General Modif.
AS BUILT STRUCTURE
LAYOUT PLAN 21 13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/150 SMR-LBL-ARC-AL-SD-L4 Rev.13
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
KEY PLAN
%
2
2
=
=
SLOPE
SLOPE
SLOPE
SLOPE
SLOPE
i
i
% % % % %
2 2 2 2 2
= = = = =
2 2 2 2 2
% % % % %
% % % % %
2 2 2 2 2
= = = = =
C
1255
600 600
600 600 600 600 600
x 1000 xx 1000
1000 x 1000 x 1000 x 1000 x 1000
1000
1000
1000
1000
700
700
700
700
OWNER/ CLIENT
1900
1900
1900
14 7790 7790 7790 8205
5025 1300 770 1480 1300 770 1480 1300 770 1480 1300 770 1895
6605
900
900
900
900
90
9695
SUITE KING SUITE KING SUITE KING SUITE KING
11 05 03 02
17695
600
x 1000
600
x 1000
600
x 1000
600
x 1000
B
ADA
ADRIEN DESPORT ARCHITECTURE
MEP Apartment A0105 Block A,
Hoang Anh River View
01
1000
Thao Dien Ward, District 2,
Ho Chi Minh City, Vietnam
projects@desport-architects.com
1200 www.desport-architects.com
DELUXE TRIPLE
4411 3790 3790 3790 ST-A
8000
MEP ARCHITECT & ENGINEER
ST-B
7790
12 10 08 06 L.B.L. INTERNATIONAL
HK ENTREPRISE GENERALE
DELUXE DELUXE DELUXE DELUXE SL/FL 2 BATIMENT - TRAVAUX PUBLICS
KING KING TWIN TWIN
Nº 43 Sihanouk Boulevard,
LINEN Chaktomuk, Daun Penh
600 600 600 600
x 1000 x 1000 x 1000 x 1000
Phnom Penh, Cambodia
A tel: +855(0)23.722.532
fax: +855(0)23.214.272
lblinternational@lbl-group.com
www.lbl-group.com
PROJECT NAME
4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 SUN AND MOON THE
40000 RIVERSIDE
DRAWING PHASE :
DRAWING
DRAWING TITLE :
4 5 6 7 8 9 10 11 12 13 14
AS BUILT LEVEL 22
DESIGNED BY ADA
DRAWN BY LBL
CHECKED BY LBL
APPROVED BY ADA
DATE 25-May-22 SCALE
A3,As shown
No. DATE DESCRIPTION
09 13.10.21 General Modif.
10 29.12.21 General Modif.
11 29.01.22 General Modif.
12 04.04.22 General Modif.
AS BUILT STRUCTURE
LAYOUT PLAN 22 13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/150 SMR-LBL-ARC-AL-SD-L4 Rev.13
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
KEY PLAN
C
600 600
x 1000 x 1000
C1
600 600
x 1000 x 1000 OWNER/ CLIENT
EQ
MOVABLE WALL
EQ
EQ
EQ
2580 60 1230 60 60 90 60 1950 1950 60 90 60
90
90
90
1900 1900 1900
8 99 8
8 99 8
8 99 8
60
60
60
85
85
85
1455 1220 1220
1100
1100
1100
94
94
Consultant Architecture Design
Storage
B
ADA
ADRIEN DESPORT ARCHITECTURE
MEP Apartment A0105 Block A,
Hoang Anh River View
Thao Dien Ward, District 2,
Ho Chi Minh City, Vietnam
projects@desport-architects.com
www.desport-architects.com
12 10 08 06 L.B.L. INTERNATIONAL
HK 01 ENTREPRISE GENERALE
DELUXE DELUXE DELUXE DELUXE BATIMENT - TRAVAUX PUBLICS
SL/FL 2
TWIN TWIN KING KING DELUXE TRIPLE
Nº 43 Sihanouk Boulevard,
LINEN Chaktomuk, Daun Penh
Phnom Penh, Cambodia
A tel: +855(0)23.722.532
fax: +855(0)23.214.272
lblinternational@lbl-group.com
www.lbl-group.com
PROJECT NAME
SUN AND MOON THE
RIVERSIDE
DRAWING PHASE :
DRAWING
DRAWING TITLE :
4 5 6 7 8 9 10 11 12 13 14
AS BUILT LEVEL 23
DESIGNED BY ADA
DRAWN BY LBL
CHECKED BY LBL
APPROVED BY ADA
DATE 25-May-22 SCALE
A3,As shown
No. DATE DESCRIPTION
09 13.10.21 General Modif.
10 29.12.21 General Modif.
11 29.01.22 General Modif.
12 04.04.22 General Modif.
AS BUILT STRUCTURE
LAYOUT PLAN 23 13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/150 SMR-LBL-ARC-AL-SD-L4 Rev.13
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
KEY PLAN
C
C1
OWNER/ CLIENT
B
2030
ADA
AHU ADRIEN DESPORT ARCHITECTURE
1205 Apartment A0105 Block A,
Hoang Anh River View
Thao Dien Ward, District 2,
Ho Chi Minh City, Vietnam
projects@desport-architects.com
EW2 H=600mm From FFL www.desport-architects.com
GoDown
to L23
ARCHITECT & ENGINEER
L.B.L. INTERNATIONAL
ENTREPRISE GENERALE
BATIMENT - TRAVAUX PUBLICS
A Nº 43 Sihanouk Boulevard,
Chaktomuk, Daun Penh
Phnom Penh, Cambodia
tel: +855(0)23.722.532
fax: +855(0)23.214.272
lblinternational@lbl-group.com
www.lbl-group.com
PROJECT NAME
SUN AND MOON THE
RIVERSIDE
4 5 6 7 8 9 10 11 12 13 14 DRAWING PHASE :
DRAWING
DRAWING TITLE :
AS BUILT LEVEL 24
DESIGNED BY ADA
DRAWN BY LBL
CHECKED BY LBL
APPROVED BY ADA
DATE 25-May-22 SCALE
A3,As shown
No. DATE DESCRIPTION
09 13.10.21 General Modif.
10 29.12.21 General Modif.
11 29.01.22 General Modif.
12 04.04.22 General Modif.
AS BUILT STRUCTURE
LAYOUT PLAN 24 13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/150 SMR-LBL-ARC-AL-SD-L4 Rev.13
RELEASE
25-May-22
NOTE:
1. ALL DIMENSION ARE IN mm UNLESS SHOWN
OTHERWISE
KEY PLAN
C1
OWNER/ CLIENT
VERTICAL STIFFENER
INSTALL ALREADY (190x190mm)
VERTICAL STIFFENER
INSTALL ALREADY (190x190mm)
B
GUTTER
BRONZE THREAD DN50 BRONZE THREAD DN50
ADA
MEP ADRIEN DESPORT ARCHITECTURE
GUTTER VIOD FROM_L24 Apartment A0105 Block A,
AIR VENT
ø=60mm 7
AIR VENT
7 Hoang Anh River View
Thao Dien Ward, District 2,
Ho Chi Minh City, Vietnam
projects@desport-architects.com
6 6 www.desport-architects.com
SUNG IL SUNG IL
Nº 43 Sihanouk Boulevard,
A Chaktomuk, Daun Penh
Phnom Penh, Cambodia
tel: +855(0)23.722.532
LADDER TO ACCESS TOP ROOF fax: +855(0)23.214.272
lblinternational@lbl-group.com
www.lbl-group.com
PROJECT NAME
SUN AND MOON THE
RIVERSIDE
DRAWING PHASE :
DRAWING
4 5 6 7 8 9 10 11 12 13 14
DRAWING TITLE :
AS BUILT LEVEL 24
DESIGNED BY ADA
DRAWN BY LBL
CHECKED BY LBL
APPROVED BY ADA
DATE 25-May-22 SCALE
A3,As shown
No. DATE DESCRIPTION
09 13.10.21 General Modif.
10 29.12.21 General Modif.
11 29.01.22 General Modif.
12 04.04.22 General Modif.
AS BUILT STRUCTURE
LAYOUT PLAN 25 13 25.05.22 General Modif.
DRAWING NUMBER
SCALE :1/150 SMR-LBL-ARC-AL-SD-L4 Rev.13
RELEASE
25-May-22