4C
810.0
B 3 5
E

01/10/2023

01/10/2023

01/10/2023
AS 4
6
809.9

E
E
SIDE

R SLOP
R SLOP
S WA
LE

P 5

E
INCLIN

ADDED INTERSECTION AT SETHI RD AND ADDED EVERETT THOMAS WAY


E

E R EA
805.4

E R EA

PE
T SLOP

NE

OPE
803.6

NT SLO
E
809.2

T INC LI
D

T SWAL

AY SL
ER

R EAR

ECT IV
ECT IV

. FR O N
6
NI

OPE
7

E FRO

ADDED INTERSECTION AT AUTUMN SUE LN AND ELLIE MAE RD


F RO N

T
PAR KW
N

F RO N

STR EE
802.3

P RO T
802.5

P RO T

AY SL
FA 1

P RO T
804.3

ECT IV

T
PAR KW

STR EE
SIDE S
LOPE
7 808.9

P RO T
SIDE
N 8

RENAMED ELLIE MAE RD TO AUTUMN SUE LN


802.0
S WA
LE
O 802.2

NY
804.2
8
D 2 E
CA
801.4
LOT GRADING TYPE C LOT GRADING TYPE B Y 31 801.7 9 808.2
BO
ALL DRAINAGE TO REAR LOT LINE DRAINAGE BOTH TO STREET & REAR LOT LINE 801.9
9 0 60' 120'
W 3 803.7
3
CO 800.6
GRAPHIC SCALE 60'
801.4
10 801.4 807.5
30
1803.2
0 LEGEND
801.0 4 801.4
11 PHASE LINE
B 801.1

3
801.4

2
1
806.7
SLOPE

29 FP 675.00 PROPOSED FINISHED PAD ELEVATION

PE

D
NT SLO

R
501 12 801.4 801.1 802.9
R EAR

D
5 55.5 PROPOSED SPOT ELEVATION

IE
1 R

OPE
AE

N
IE M
E FRO 4C
AY SL
ELL

N
800.4 EXISTING SPOT ELEVATION

FA
801.1 805.4
ECT IV

T
PAR KW
28

STR EE
SIDE S
LOPE

SE 13
??? 802.8
PROPOSED REAR YARD SWALE
P RO T

800.8
6
S ID E
S WA
LE
H A 14
2
800.4 800.6 1 804.1
LOT DRAINAGE FLOW DIRECTION

STREET DRAINAGE FLOW DIRECTION


P 27
801.8 INDICATES SIDE OF LOT WHERE DRIVEWAY

*
??? 800.5
LOT GRADING TYPE A
ALL DRAINAGE TO STREET 15
7 MUST BE LOCATED DUE TO GRADE
DIFFERENTIAL OR CONFLICT
800.3
20 3 799.8 2 2 803.4

AU T
26 PROPOSED CONTOUR
800.7

U
16 ??? EXISTING CONTOUR
8 800.2

MN
21
4 D 800.0 801.7
3

SUE
25 799.5 EXISTING TREE
17

LN
800.4

SIE
??? 799.9
22 9

NN
799.7 SIDEWALK TO BE BUILT BY DEVELOPER
800.8
5
24 799.1 I 4

AB
800.1

EAR
??? SIDEWALK TO BE BUILT MY HOME-BUILDER

©
799.6
19 10 799.4
6

RD
500 798.8 799.3
23 5
D ???
18
7
11 799.1
798.7
798.3
GRADING GENERAL NOTES
24
799.1 1. CONTRACTOR SHALL CUT 3' BEHIND BACK OF CURB TO SUBGRADE ELEVATION.
C 22
798.6
798.0
6 2. ALL PERIMETER SLOPES TO NATURAL GROUND ARE TO BE 4:1 MAX, UNLESS OTHERWISE
NOTED.
25 8 798.9 798.0 797.2
SE

F
17 12 3. ALL SIDEWALKS SHALL NOT EXCEED A MAXIMUM 2% CROSS SLOPE & A 5% LONGITUDINAL
SLOPE.
TH

7
IR

26 21 ??? 798.2 798.7 7. CONTRACTOR TO MATCH EXISTING GRADES AT ALL PHASE BOUNDARIES
D

23 798.6 797.5 796.5 8. GRADES PROVIDED ARE TO TOP OF PAVEMENT AND/OR TOP OF GROUND. CONTRACTOR TO
C 9 MASS GRADE TO TOP OF PAVEMENT SUBGRADE FOR FUTURE ROADWAYS, AND TO TOP OF
27
16 13 FINISHED PAD, AND TO TOP OF GROUND FOR LOTS/LANDSCAPE AREAS.
March 7, 2024 F-928
E RD 8
N I 20 ??? 798.0 798.4 9. REFER TO GEOTECH REPORT BY PSI REPORT NO.03031154.
N
FA

AUTUMN SUE LN
798.3 797.0 795.6
10. ALL PROPOSED ELEVATIONS (SPOT GRADES AND CONTOURS) ARE TO FUTURE TOP OF
28 22
10 GROUND AND PAVEMENT. CONTRACTOR TO CONSTRUCT ROADWAYS AND R.O.W. TO FINAL
503 14 TOP OF PAVEMENT, CURB, AND GROUND ELEVATIONS PER THESE PLANS. CONTRACTOR TO
F 15 9 VERIFY EXISTING TOP OF SUBGRADE ELEVATIONS PRIOR TO CONSTRUCTION AND NOTIFY

SMUDGE WAY
19 ??? 797.8 798.1 ENGINEER IMMEDIATELY IF ANY DISCREPANCIES.
29 795.0
798.0 796.8
21 11. INDIVIDUAL LOT OWNERS/BUILDERS ARE REQUIRED TO SUBMIT A DETAILED LOT GRADING
11
3 30 15 10 PLAN THAT CONFORMS TO THE DRAINAGE PATTERNS SHOWN ON SHEET #### IN THE
APPROVED CIVIL CONSTRUCTION PLANS FOR THE DEVELOPMENT, THAT IS SIGNED AND
797.8 796.6 ??? SEALED BY A TEXAS REGISTERED P.E., TO THE CITY ALONG WITH THEIR BUILDING PERMIT
G 31 14 18 ??? 797.7 797.8
APPLICATION.
19
20 12. ALL REQUIRED RETAINING WALLS TO BE DESIGNED & CONSTRUCTRD BY THE HOMEBUILDER.
4 ???
12
11
???
16 797.5
797.5 796.3 794.0 13. HOMEBUILDER MUST MAINTAIN LOT GRADING CRITERIA AS FOLLOWS:
~ FRONT YARD: 1.1% - 6% (MAX DRIVEWAY SLOPE OF 10%)
13 17 ~ MINIMUM LOT SLOPE: 1.1% FOR A & C LOTS, 1.5% FOR B LOTS

GRADING PLAN
??? 797.6 ~ MAX BACKYARD SLOPE: 10% - 15%
5
32 18
796.5 796.8
12
789.2
???
797.2 796.0 793.3
786.7 ???
789.2 DAVEE PL
DAVEE PL
784.1
33 796.6 797.1 797.6 13
PHASE 1

6 789.3 ???
SETH

796.6 795.6 793.0


790.1 17 796.6
786.6
789.5
I RD

783.7
34 14
7 789.6 790.9
795.1 792.0 NTS
790.4 796.1
786.4 6 5 4 3 ??? 795.8
789.9 13 12 11 10 9 8 7
2 1
783.2
35 791.2
16 15
8 790.0 NTS
F 14 F 794.7 791.7
502

795.5
786.3
790.7 15
791.4
782.7 790.3
36 16
9 790.3
794.1 794.1 794.2 794.2 794.3 794.3 794.4 794.4 794.5 794.5 794.6 794.8 795.1

794.9 794.3 ???


791.7
786.2 791.2 792.5
793.3 793.5 793.8793.8
37 F 17 BENCHMARKS
782.2 10 790.4
TBM# 101 "(" SET IN HEADWALL OF CULVERT
794.4 793.9 790.3
501

LOCATED IN THE MEDIAN OF STATE HIGHWAY AND


BONNET LANE.

BERRY CREEK
791.0 794.3

WILLIAMSON COUNTY, TEXAS


786.4 F791.3 793.3 793.4 793.7 793.7 793.8 793.8 793.9 793.9 794.1 794.3 794.3
55 56 18
ELEVATION =821.82 FEET (AS SHOWN)

11 G 38 51 52 53 54

HIGHLANDS
790.7
49 50
41 792.4 42 792.7 43 44 46 47 48

CITY OF GEORGETOWN
790.8 40
791.8 792.9793.0 45 789.7
794.2 793.6
781.7

PHASE 5
794.1
39 791.0 19
12 787.5 791.2
1 793.6
793.9 794.1 794.3 794.0 793.8 789.2
792.8 793.0 793.2 793.4 793.7 793.9 793.4
787.4 791.8 792.0792.1 792.3 792.5
791.3 791.6
790.7

13 790.6
I 20
EVERETT THOMAS WAY
781.3 EVERETT THOMAS WAY 794.3 794.0 793.7 793.6 793.6 793.1 788.8
790.4 793.3 793.5 793.7 793.9 794.2
792.1 792.4 792.6 792.8 793.0
788.3 791.2 791.5 791.7 791.9
781.0

14 793.2
21
H H
SETH

792.4 792.3 788.4


788.1
1
787.9 2787.6 3 4 14 15 16 17 18 19 20
13 22
I RD

5 10 11 12 790.8 790.9 790.6 790.7

AUTUMN SUE LN
790.7
787.9 787.9 788.2 6 788.4 7 788.5 8 788.7 9 788.9 789.0 789.1 789.4 789.5 790.5

778.5
15 787.6
WARNING: CONTRACTOR IS TO
VERIFY PRESENCE AND EXACT
790.2 789.2
LOCATION OF ALL UTILITIES
PRIOR TO CONSTRUCTION. SHEET NUMBER
23
780.3 782.6 784.0 784.7 784.8 785.0 785.3 785.2 785.5 785.6 785.6 785.6 785.7 785.9 787.6 787.8 787.6 787.5 787.4 787.4
787.5 787.4
787.1 C-07
OF C-37

2022-29-CON