E-1 E-2 & E-3 E-4 to E-9 E-10 E-11 E-12 Equipment List
VERTICAL GAS SEPARATOR VERTICAL GAS FILTER DESICCANT DEHYDRATION DEHUMIDIFIER RING GAS BLOWER ELECTRICAL HEATER
Rate : 15 MMSCFD Rate : 15 MMSCFD Rate : 5 MMSCFD/Tower Rate : Rate : Rate : Displayed Text Description Tag Number
350 Psig 350 Psig 350 Psig 350 Psig 350 Psig 350 Psig E-1 Vertical Gas Separator Tower SOB-SEP-001
200 deg F 200 deg F 200 deg F 200 deg F 200 deg F 200 deg F E-2 Gas Filter Tower SOB-FIL-001
H E-3 Gas Filter Tower SOB-FIL-002 H
E-4 Desiccant Dehydration Tower SOB-DDU-001
E-5 Desiccant Dehydration Tower SOB-DDU-002
E-6 Desiccant Dehydration Tower SOB-DDU-003
E-7 Desiccant Dehydration Tower SOB-DDU-004
E-8 Desiccant Dehydration Tower SOB-DDU-005
E-9 Desiccant Dehydration Tower SOB-DDU-006
E-10 Dehumidifier SOB-DEHUM-001
E-11 Ring Blower SOB-BLOWER-001
E-12 Electrical Heater SOB-HEATER-001

G G

To Vent/Flare

F F
E-2 E-4 E-5 E-6

To Drain Tank
E E
E-1

From Separator To Vent/Flare

E-3

E-12
D E-11 E-10
D
E-7 E-8 E-9
To Metering

DATE No RELEASE REVISION RECORD DRN CHK APP

C To Drain Tank ISUED FOR COMMENT C

CONTRACTOR AND ENGINEERING :

CLIENT :

B B
E-44

OPEN CLOSE TITLE


CLIENT CONTRACT No. :
-
DESSICANT DEHYDRATION UNIT
PROCESS FLOW DIAGRAM DESIGN/DRAWN :
CHECKED :
A SCALE DATE A
APPROVED :
1: 1 3/27/2024
DRAWING No. SHEET REVISION
PROJ.MGR APPROVAL :
PFD-DDU-KRG-01 1 OF 1 0 OWNER APPROVAL :
8 7 6 5 4 3 2 1

You might also like