You are on page 1of 29
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS (RAILWAY BOARD) 2024/10) Kanpur/DBRI30/71 New Delhi, dated 16.02.2024 Managing Director, Uttar Pradesh Metro Rail Corporation Limited (UPMRCL) Administrative Building, Near Dr. Bhimrao Ambedkar ‘Samajik Parivartan Sthal, Vipin Khand Gomi Nagar, Lucknow = 226010 Sub: Approval of Design Basis Reports (DBRs) for Underground Bored Tunnols and Elevated Metro Stations of Mass Rapid Transit System for Kanpur Metro Rail Project of Uttar Pradesh Metro Rall Corporation Limited (UPMRCL). Ref: DBRs uploaded on ROSO's ontine portal by UPMRCL on 11.01.2024 ‘The Design Basis Reports (OBRs) for Underground Bored Tunnels and Elevated Metro Stations of Mass Rapid Transit System for Kanpur Metro Rail Project of Uttar Pradesh Metro Rail Corporation Limited (UPMRCL) have been examined in consultation with RDSO and approval of Raliway Board is hereby conveyed forthe same, Accordingly, approved copies of DBRS are enclosed. Enel: As above nti “ rere eerey Tay Board er eee Copy to: 1, Executive Director/UTHS, RDSO, Manak Nagar, Lucknow wrt letter No. UTHSIUPMRCIKMRCIPO1/012021 dated 08.02.2024 2. OSDIUT & ExOfficio Joint Secrotary, Ministty of Housiig & Urban Affairs (MoHUA), Nirman Bhavan, New Delhi-1 10001 File No. 2024/Pro}./Kanpur/DBR/30/71 (Computer No. 3455813) ea74a7/2004/Prject Call soap bene: UPHRC/besian/PBR/UG [202% /o4. Ree E SRE og [aa laae ) Interpretation fresh data and carelion wit prwous information ©) Prediction of roune cantons lel fo be encountered | 6} vestigation on the surface fr the resenco of water wel / bre walls for domeste use a residential ares that inorect he alignment. (€) Grou evomatin fom allcnsttonacties shall be coated ad interete, ‘53 Tunnol Lining segment (1) The design ef the segments sal be adequate for al stestes iced dxng acing, tng, ‘ransport,erecon acing ard impee, cluding isavic sess & mac, (2) The design shall consider insity gun stresses and shall provide evidence andor "measurements support of he parameters adopted in the design as part ofthe calculations. The {round cad onthe tunnel shall be based on the aetal height of overburden soove the tonne! ‘ning andthe celexa eath pressure ates othe sl svat surounding te tunna. | | (9) The design fhe bortunnel ning shal ak ino account th promi of bre tune ‘one te anoter, the sequoncs and ining of construction andthe posit of adacant EBS. (4) Tha dasign sal alsa conser the relate rates of adinglunoscing ue o TAK jacking force in both the lateral and verical vectons, and the result induced tunel deformations whether | temporary or permanant (6) The sagmon: has obo csigned fr Ah fre ating as por 1858, (6) The design method shal tke nto aosount the Interaction between the ining an the ground, tha datlacton ef the ling snd tha reitbuton of th lading dependent coon the relative oxy of te ning, the varsity and comareesty of he oun (7) The cosines anal consider and conform toa curatity pects of he remanent bored tunel ning ieking pemeabiiylranamissvty and otc! oxy ‘ Examined and found in order ao A te Director T/C ROsO Pu ea aS. File No, 20247Pr0j./Kanpur/D8R/20/71 (Computer No. 1697497 /2024/Project Cell " P ee! Design Basis Report for Underground Bored Tunnels (@) The design shal take no account the proxi ofthe ning othe tunnel ace atthe te of "staleton and he pote for atonal ground loads as te face advances (0) The design shall alow forthe expected vataton in ground condtons an ne ze, proximity, tering and metiad of construction of adacert excavators. The ning exit sal make de tllomancs fo Waly deflection ofthe ning ding constucion and operation (10) Where @ pacmanent or second ning it be stale iid a temporsry er pimary Ein, the ground loads used in permanent ning design shall consier al oads es SeserBad inthe ‘Contact and any adienal ground loa hat may ars rm ime-dependent gourd sain, (11) The stress of the permanant tring should be such thatthe defisions are within permis ims as per 8S: 81:0-art and IS: 458, (12) The thickness of segments shal suk the method of constuction and shallot be so large that part shoving ofthe alas becomes a general nocossy, (19) The thickness of the segments shal be condstnt with tho capac of he cle boting frrangements to wihsland tne shee forces isuced in rngs ult wt laggaed nts and for the planned enforcement an requ concrete cover (14) groove fora singl elastomeric gasket sal be provid onal ont faces of each segment ‘nd key in accordance withthe gael dimensions. Tho easter gasket shal be vied tothe Conditions under whic i requred lo operate forthe cesgn ite, The gasket groves hal alow foc accurate mang ofthe gaskets of acjcent segments (15) A groove for postanstrustiongroutngleaukng as necessary shal be provided onthe Inrados foreach segment ont. (16) The lengths of sagmonts shal be chosen with ceca to bancng stresses cing handing ‘orage and erection and the long tam esses due to ground losing and the resultant Sofecbons (17) The design of rings shal include tapered ingsin order to negotiate the alignment cxvature ‘nd to correct for ine and evel ding consrun with the miimum use of cieunferentia ie packers consent with ating the fequlred degree of waterighness ofthe bored tunel in fsocorcance with the contact (18) The design ‘or segment ning shal aes aspects incluing the folowing 8 appropiate comes ror ae eae ssonenoe _ Sites tiee ee : pee reo a Cee rentee rere y re vo s0t18 ‘Examined and found in order (CoP. Singny ee sions ay yy 5 onc SF PRAM aN bean, Deere TICIMOSO ‘pupae File No. 2024/Pro}./Kanpur/DBR/30/71 (Computer No. 3455813) 1627497/2024/2rojact Cal Design Basis Repor for Underground Bored Tunnels «tolerances in production and insti o segments sal be accountod inthe delon 2) Instaaten of Otrer components, such as rout hoe vals: sacks boding ard packing materials 1) Cavity rut, between ining and ground 4) Instuentton and monitoring te demonstae perormance afte insta tnngs ') Shorten (ouingconsrucion)internecate(rmeditaly ater constuction) and fog term (fl design te) nang condona 9 Stresses ced by grouting and ground pretreatment, where apocable 6. DESIGN LOADS AND LOADING CONDITIONS 6: Loads Linings shall be designed to withstand all envronmental loans sisiorions and other affcts wthout detriment. In general, bored tunnel Inings shall be designed to ull the fling ‘euirements and to est te flowing lads: | 2) Dead Load ) Superimposed surface lnds from tafe, existing stuctures over and adjacent to the bored tunel, and any specie fur loads ©) Appropriate ground loads, water pressure, and selmi lacs | ©) Rally ease where appropriate | ©) Long- and shatterm grouns yd ar aqueze 1) Unequal grouting presses, 8) Adjacent bore tunneing or excavation 1) Long. shartsarm lead induced by construction 1) Temperature and hvinkage |) Handing loads, incu impact, aspecay in he case of unsinfrced segments 1 Jacking ores, where sporoprit, 1 Actderal loading suchas fre and deriiment 6.2 Loading Conditions 2} Dead load comprises te sofiansight ofthe basic eructure and secondary elements supported ‘and te woight of earth cover. The depth of cover shal a the actual depth er minum one | lareter of tunnel The depth of cover sal be measured fem the ground suet the ura 1 Tale sucharge shal boas per the eaing of IRCARS a8 appicabe, Examined and found in order te emt retor/UT/CNMIYROSO File No, 2024/Proj./Kanpur/DBR/30/71 (Computer No. 3455813) sear4a7/2024/Praject Cal Director UTICMIOSO Design Basis Report for Underground 2ored Tunnels Loads ftom existing a known flue aciacent structures above or win the ae o inuence, “ahi wil remanin place above the bored unl, or any spoctied future oacing The aplcabe founda oad ands nfusnce shal be computed basedon the ype and use, asthe foundation ype uhich supports that structure 1) Adcona suppor ground veatent oF atonal rng thickening shall be povided unless i ‘canbe show that adequate provision aed exes. Any suctre surrounding nna should Be supported by pouting and shotretg tchniques, should et be s:pparted fom tunna ining. 1) Winer provision fora spacti Kaur stueture fs not nade 2 minimum unifemly stbuted ‘Surcharge of 80 lo-Pacal at he cesign igheagrouns iva shale assume Hyrostatc pressure, lgnccing pore pressure releasing Kom any seepage ins the turn. ‘Water a ground evel to be consisered for dosign. 9) Loads andfoad changes duet known construction activity inthe vcnty of be bored tunnel, Such aa tha excavation and the formation of underpaesse, bacemens, ple soups, brieges, ‘Sephragm wal anc cabo ground anchors The sroting pressure wi not exceed the hycrosai pressure ay mar thar 1 ba, however the actual pressure wil be decided by incharge Chief Engnser based or the geological condos, ) Siuctura equemante fr resting bucking isto be chocked ence tunel is being designed 8 compression mamber. |) Aditions toads tresses n adjacent ngs due to openings a cross passages locabons to be considered 6. Floatation For fosaton ehack the war table is assumed to coinciée with the ground lav Where the ‘ored tunnels ae relatively shal they shall be checked fr the possibly 0 otaion due to Soren water prossure at rpresortalve typical locations Up ue ocspisced water to be ‘Conseed inthe design. The overall factor of safe against flotation sal net loss than 1.1 for any ofthe condo 64 crack wath [A structural concrete elements shall be designed to prevent excossve cracking due to ene, tary & long term age thermal shrinkage Flexural cack width small be checked in accordance tnt Append F ofS 486. The ts specie ine 35.3.2 ofS: 456 has to bellowed 155 Load Cases, Load Factors and Combinations [Al analy shal cary show the design achieve the design feces of eet. g en Page 713 banned ant n order (@.P. Singh a he nl et posto) Fe ie xcoltcrnnnentlonmaie's.. fi, OS See File No. 20247Pro}./Kanpur/DBR/30/71 (Computer No. 3455813) warsa7/2024/Project Cal Design Basis Report for Underground 3ored Tunnels 6.54 Load c ‘The flowing fad cases wil be considered at each design secon |. Load caset: Ground wate table a :h ground surface wth untorm suchas of 60 KNin? 4, Load case-2: Grouna water table atte ground surface wth no surcharge. i, Load case: Ground water table at 3m balow axing ground water lel wih unfom surcharge of 60 KN Ne. Load ease: Ground water tbl at 3m below existing groundwater evel wen no surcharge \ Load eases: Ground water abe at exome waar eval wth ae surcharge, | 6.5.2 Load factors and Combinations The design forces wil be datved based onthe flowing load factors Based on: 456-2000, BS atop 1867 Load Case Dees Load Eases arth Pressure | Syroharge Load case Ta cr ia Taser Cate? i = 14 Gate 3 te ta a ase ase 4 1, a 1a see aces eee ta 1 Senseeabiay 7 a i i # Surcharge fais taken as por Bish standards then load fctr should be 1.8 If Surcharge load is akon as par Indian stands hen oad fate should be 1.5 = For Special cases of conseratine surchage foad (sich ab fue fyowr ‘construction eto factor 1.4 can be adopt, “Load fair fr ertreme wate table (ooding cae) can be reduced 0.0. “Water oval or servicebiy ito be a round let 7. GENERAL CONSTRUCTION METHODS (1) Inia! ground suppor forthe bored tunnels is expecta to comprise ground predreatment (were necessary) andr precast concrete segments (2) Metnods or excavation, spl removal grouné eatery, nealaton oil support andthe permanent ining consruton obo prepared (8) Excavation stl be caried out in a urifrm and cantralld manner, overcutng shabe kept oaminmum, (8) Arpopite methods and racesary steps to be akan to corral ows and moverent to, | and tomaiian the sabi of he excavation Page aot 13, famine and found in order siooh) C.F. ae ah ec Y eanenio ot BS cite a ovectrtr/cwm0s0 se fen OY File No. 2024/Proj./Kanpur/DBR/30/71 (Computer No. 3455813) 1697497/2024/Proect Call Design Basle Report for Underground Jered Tunnels (6) nerumentaton and montedag arangements for ground are exiting bulding stucures {EBS} movement and diorion and changes tothe rounamaarabas) and be Wager (Alert ‘Aton & Ale) loves foreach and every ertiled EBS tobe performed Desige has o spect the requires instrumentation and mentoring arrangement to martan the sey e the EBS. 114 Tunnel Lining General 4.4 Tunnel Ling - Temporary Support (1) Stee sate ara ation arch girders sal be ote to sul the dimensional requirements of he ‘designed opening. The Contractor shal pronde dmansionaldotais ofthe sto! cas or latice farchee gicors ana npging which include all calculations regaring imposed lads Cefore and alter any ground preeament. (2) Splice sha be sto! rods or tubs of ouside diameter not ess than 2 miners, (2) Pipe piles shal be ste ubes of outside ameter not ss than 100 ames (4) Rock dowels shall be unensloned seo! bare threaded at one en and provded witha face Dal, shim plates ands conc ested washer adm, oF spit deformed ste ubes, or lass fore reinforcad resin oss (6) Rock bts sallbe tesonas ba manufactured out 2s one of folowing ips - so ste! ‘at, sl or deforma eae tbe, ola Me einarces resin rods (61 Atecnative store shall be subject tothe netic of the Employer's Représeniative 174.2 Tunnel Lining -Permanont Support (1) The permanent bores tuna supper or iing shall ganerally comprise segrental sper ‘raphe ron (Sor precast eanerete (pan or rinfoced ngs tat are held securely place She the same wal ema so fora know possbie fre concion, (2) Exception to those permanent tings may be at coss-passages (inks between tunnel), fnlegemants ofthe bore tunnel and a he juncion between eu-ané- oes ass antmorctr) Ky ene Diteetor/UT/CvI/RDSO ral KPRAMRNAORRL COMER wc eiNGA File No, 2024/Proj./Kanpur/DBR/30/71 (Computer No. 3455813) 16s 497720247 Poject Coll Bzuraecee, DESIGN BASIS REPORT FOR ELEVATED METRO STATIONS FOR UTTAR PRADESH METRO RAIL CORPORATION UTTAR PRADESH METRO RAIL CORPORATION LTD ADMINISTRATIVE BUILDING, VIPIN KHAND, GOMTI NAGAR, LUCKNOW “@ x eet singh) ror ‘Examined and found inorder 6. P. SO ls), oe Wat cen oh ait be Dec renos0 ate Ee 7 spe IS [Ee owner simu gas ott ss has NBS Hina gad of eoneee fr bing lye an lve courses stall be at par 15-88, Hoare rinmam grade salva es an MT. Conte chratnisics ap etied above might need to be iptoved fr funn the Stacie sooronpant ound to be aukcusry apes (so or wat) The thal be ‘Sssesadon com pene bass ‘As par clsse 284 of S458 for in an Renoeas Conse Sots acne 1232 of | (Sai srentenand concrete ecu. Covr fo prenensg sel tel Ye f Sudatca winoaue {ote wis | | 222 Fire Resiatanc paved Ate scr dena ini gon Sng nb ets a mm eee FF his adr Gonsutasurkse an n pr Sestn Too e0 fo Stn Sc | 224, crack iat Check 1 steal cote err al tp pov ei cashes fe 9 Spat aie see ter Pan ona enone Cnarate Srosuas tn late 20.2 ond 202 fist for Prostesaa Conor tacts 23, Clearances (Gcharaee for Rows. Tat: Ae per rlavant IRC sectcators and Road Aubonty outers, ‘sso at 3 220m (0225m (i of he ttih ea ye crash bara) ©0125 (erence Seven ash bara la hat fom safe Ine WN Figure. Clearance or Road Tate amen ote (EF Sieh es a lace) aoe Uirhat Reems Se ESI ‘elt ae a nl Si (SAPS ODO 1083 baa an a IEE SO TE a be CT ee AI ee File No. 2024/Pro}./Kanpur/DBR/30/71 (Computer No. 3455813) ‘ears 7aaTETPraject Ca ERENT/OS (0 ieee Rabun Tati non Relay Sched f Omenons (£00) shal bs (i) tesranes Mao Tate: As pa spprves S00 of pec evo system, (x) Forutity sares- The caoances tus, dana te shal be x manda ty he tly ne depen 1 Clastanas for Ring Stock Vaal & Horzunial harances for ling sock te ‘atuleaep! as par Last S00 er Sars Gane 24 Design Lords amentay loads ob constaras te design ae Deas Lose 1 Suparimpesed Leads sa. Imposed Crom ive) Loads uw arauake Loads 0 Wins Load we CollcersnpsetLeadeDemimenttoace CL" Conetcton& Erection Lease a Tenpersie oats or | Sage s rsp c ar 5 wat Presire ° Surcharge oes (Tafle budgets) SR Prosuess Fee pr Long Wie Rall Force wR Deerenta Satoment os | “ood as sppoatie shal beaten, 244, Deed Loads ‘eas os sal be based on he actual cose sacton aes and ut wags of mie an ‘al nde be welt tho mearle al are stl companeie of Lente Staton repeal ate 242. Superimposed Deed Loads (S101) | Superimposed deed emis inci waits of mates on the wack sche tae nt | eit lomo bul are pemaen Note, The SIL can be of to pes: Fed or non-varbe, and van, I 88 Neo | fates tat 9 gorton cf SOL af faed or ronsarble pe and tl ty fay | Sontcanty dung the ie of fe sce ands spac) cae ‘orang he sre | Incperatesn th srs antonanes man, ooo acts pata de ed may | Becznsored or the conporantar SOC 4 Dek has ere eer eres File No. 20247Proj./Kanpur/DBR/30/71 (Computer No. 3455813) 169 7 7BORRTPFRICE Cell | “The rine dita and concerted oa shal en acetone to 175, where: ‘Tale rtemaing Wo stuay sal spay loads ‘+ Leas de to for fh ot pation wal, eons in lbs nd any other ‘chiseled lad tha os cones epee sentra equrena + Sipereon ona wi be tonsiara Se lod ef fle cling. pany 2 lta cupmantEeesaar Pe Ss pa equrenons This aa ppslevnerver «+ Uiena Ecaisar apes be celgnos as per mantacurer cat. Uisircuew ator coer doar PSD} and soar panos shot be cvsisr 2 par + IDL for UPS room, ASS/TSS room and other technical shall be at per specie 243. Impased (Crows Lo) Load Ingose lasian aaon bulsnge ae tose mis om ecparcy ard to values ‘lees nara ona by persons, ria and moveate abet ves ra vets wh [Ss conernons pp and lumrure, othe moving er aacing anes cng tm of ‘rgansoion snd rfrismen: hi sha bu porlaso 1818 486 244 Earthquaio Loads ethuate das ehal flow the saenic sequen of 81803 (Par 12018) The Dlon s pr Desgn Beas Repo for Vast of Maro Sylar sel be lowes hors ete ring ovngioase mo. Ducati sabe a par $1302 8 184828, | 2444. Ds Lintation “ie stecey stn tba Duin shal aay tM de maton speciied nck 7.1.1 Buea | 2442 seismic detang (Fer rnerced cones scrape 161380 Foran swcnres a peiS-028 “he wins pl be cae spa 18878 pat 248, Collslosimpact LoadtDerament Lauds (9 Forrod tae per RCS. (@ Focmavo sper Brie Rule 2.47. Conetrtion and erection nds “he weigh fal emporary and pernanet taal og: wih a cherfoces and aes “ic an operete on any parte dug secon shal be conscre. Aowanees sal onae fhe pana gel foray losed ny svosees couse my mba Sua coat ise U (C.F. Singh) pc ete) : Mentone Ss ‘a Rut bn Sr SCS REPT STE ONE) ee 38 ea a Sy SAT ASD TCT HD TARGET ARE BOTS SWRA OH Berd ‘examined and foundin order aN File No. 2024/Proj./Kanpur/DBR/30/71 (Computer No. 3455813) esr esrreaereeet Cater | 248, Temperature ‘As par cause 185 01S: 488 Tempers grasen oho be considered asp Clute 215 of | ICS aoptcane 248, Shrinkage “he shiniago sins shat be evahted 8 per clase 624 oS 458 fr Plan and Rehoved Conc Stucues and waiea 682 a1 14a presassed anerea eae For sucture supporting Mato scng the efetof Shnkege a8 Her CL. 523 of RE- CBC ‘alo coneders 2440. cr00p ‘The cep sis sal be eva a por cause 625 cf 18458 €r plan and Rents (Concie Srucres ape cause 525 oS 163 fr oeaeatad corre seuss fof ep ws 2a CI 5:24 of RS CRC onal be 2.4.11. nt a WaterPressure in in teers oar ct rts bow zo a 8 ng we ed ‘egies root tr thw procured Slower orto alts Gay | _accouria for. When a portion or who ofthe sls below fe feo war surace theta earth | bese shal be eval fer wag of ol amiss by Sunyancy and Pe al hola Dressue (ar parisa7s Pan ‘AL cundton sabeotnge suse a waa restr sabe designed ots 2 uoeiy ‘Fred lt exalt al rec presse Checking ot reigns see ‘Submesed conto shal be don corer Soyer wah funn tay oft soc supporing Meo basing ujocua aoa sees, leds ae oats ‘alle ccs acarsanan ih G6 of Re Sutera Coe | nate, sureharge Load | Ine dtign of stvcres pars of stucures teow sound oe sich a8 wing was and Una! pur roomate the pressure tates y share for Sonar ot ‘oig boa shal be ay ssa 24.9, Pretrssing Fores (PR) | “Tho reseeang foe shoul ba a per 1288, | Ral Scie ineactn [RS] aaj i Yeuked because be contrac) valde ing {alse contrucus ote deck xual ons Tha ration eos estas eats 9 | | ‘Gtecycomace wha sea yong nom, (nateeclencnantinacnecaad | ricerca crepe See IL Mt atten! sess nila enon ae al as cnpressn cn acount ora | 1. Maem vor! defecon oe gecer toc 2) Sere and ganar aoa fo Le a ingot a Stacie eatin ene | ‘rosie alan bt song tes 2), Reprsointve stan mstbe choren cay out Ral Sac Iason, | ——i“‘“(«‘niodanine ss) Res 7. | | 4 Deco (Hak & saa ect, _-smaatireanans, Bs- ien Daigo ea oma cw File No. 2024/Proj./Kanpur/DBR/30/71 (Computer No. 3sssai3)—___ Wa 7AS7 OT RGfect Call 1 rm rab pata a nt oni nui cn aces 5) RDSO Gusts for carving out RSI shuts sal be peered 1) vm fcr shal bs consaered 9 appopi s eornton os par RS Cone ge ase cman le rere ted pat 3 2488 otra ce seperdam e008 24 Dein od Contre 254, UNimats Load Combinations Each component of he tie el oe aaa and ehesat fo posh combiaon of tse ey wa oe he wearin, Fora a 1 Loa cine and acoso se Table 18 f S45 Pan and Rice Conrle (Loa amin a fre Table 71S 183 fe resvesad conta sic | [8 Looe cambinion a pe Sacton 3 an ace pr Sete ofS 800 Ste tes lin) Lee erintan a erase 6 of 1895 Par. (01 Load comoinaos a8 ger IRS CBC ant ROSO audnes foc Semi tg of Ray ‘Sapos ohare ero ive macs psa Note: () Load cman fr cnuitn led cate stat be decd by Mere 25 oo menessegyatcoatucton (iReterene of be uk for coin cas cls ead vei ae nae 1282. Serviceailty Load Combinations ‘The folow'ng bad einen and ba fers habe use fr es for ervsby Ir tt (0 toed contains ad acre par Table 18 of S486 for Pin ana Reno Cnet Sivan (@ Loa combina cars pr Tala 716 194 for reabesed con uc, fit Loo cembinatin 2 par Sacton 9 ana ar ab pr Saco 5 1:00 for Sel aces, | fe Lead corkinaene a per RS CBC whore Mt eds are appesbi | ‘As ne den era or enekig pera cresos for SLS Load Combines ent covers Imig aie eaes terre we arto RS.CBC. 26, Deflection Criteria Tho deacon intone as par clusa 23.2 of S466 foe Pan ard Renee Cuneta | roshiee once 20.2 oftot er Pesresas conte Sruauoe sa telus 268. Lateral sway “Theatr saya ep of he lng deo Win ads rout ot exe 00, where H Teteragita' te bulang [aa a r a Seatac hw ae Ferment ere K nell TPRGRETT STEP I WRT Bg = Hei ; File No. 2024/Proj./Kanpur/DBR/30/71 (Computer No. 2455813) Lepr RBETIRC CAR 27. Fatigue Cheek Fig pharamaron rons tbe ataoas ony for tose sucha sles ha ee sje reper o sigicae ass vara naval) Fagor otf (RCC and PSC srucures— Aa pr cuss 134 RS CE. (i Ste svete — (oat of ae onto oc 35 oS Stel ip Code sa orem. ‘nine mao sal eed Obes, aed suingct ope she sce, (0 Frome cass pa Secon 19 803, “Damage esuiionce fac As periRS Set Sipe Cate) 28 Foundations 4. Types otFoundaton Consserig fe ats of gourd ye of posoossbucues, pets és an tons, tretlowrg pet canon ae costed pavien 3) Spreader pot tong 8) Ratenaton ©), Pitounsaon Ne mater hep of facaon to be sdopled. he lawing perimans citi sal bo tial. 4) Foundation un otf sa. 2 punta ust sot sae by or an he eters pam = oe Tale of 282 Design of Pile 18-201 sabe foton for eto =, oad apy Pl Setement| atoge of extmaig te selena of op ounce dpard pon te yp ode ‘oindatn and be manner wens fads Fant erat Beak Toone eaesak atten shal be dane ecreaoe wh 5 6003 Po by mating ert so ‘noe ph fa ook oma, ‘The setemant of each ple andor ple grup should ba cetera, and t shoud be uenstated ht sch an trons stem ca ca lorone oy be sare, 25, Shalow & Ovap Foundations | |S: 180 sabe lowed fr Gos eundton so. Teele ening cae er satow ‘eundton hab caste nsocaraanc wn a3, a ‘Computation of Settoments of Foundations <6 ‘Tho cplalaten fo stare oun sal don as pee y + 151000 Part fer shtowtounstons| + 132008 Pater orp fondene ‘ied od diner a ste = er nm at carte SeceyTiowiees, =p Des Hes Rat i ne sory SES REPANT STE 0000-68 i Pee nih ean File No. 2024/Pro}./Kanpur/D8R/30/71 (Computer No. 3455813) Waqterreoeertoject ca 29 Design of ater Retaining Structure eho designs es er18 370 3. List of Design Codes and Standards | “ne gs of son bulcngs shal ue caved oil ab pee powsiens of ths O80 ‘Spectenne Rae ert be me's along codes oa adioal ns maio. vara alent ofc alba lone ire | N BSereye ooces Reatard the soprovalof UPA. ‘coe and sansa uth eet eins ncun at eens rains and crecon lbs shal onybeuse ‘caine nd fou rer te Drecr/rons0 a ec a Bow emt SS sgn as Hepat a Ete Susi GCS-REPIVTL-STE COONS) Page 20 mtn

You might also like