You are on page 1of 20

SUMMARY SITE VISIT

PT. KOLAKA MINERAL RESOURCES – TO


PT. MULIA MAKMUR PERSADA - JO
TOLALA, NORTH KOLAKA, SOUTHEAST SULAWESI
•2.100 Ha IUP OP KMR 16 JULY 2009 valid to 15 JULY 2029
•Nickel tpye of LIMONITIC SAPROLITE Ni 1,7 to 1,8% with Fe ≥35%
•Potential area approx. 350 Ha has ore resources 4,9 million WMT
•Logistic to BANTAENG SMELTER as far as 254,2 nmiles (Ni>1,6%)
•Potential JO of IUP OP MMP area 10 to 20 Ha with nickel grade
>1,8%
BUSSINES OVERVIEW
PT. MMP located west of PT. KMR, with
the following details ;
-Area of 2.400 Ha (IPPKH 1.300 Ha & 1.100
Ha on APL)
- Offered on Joint Operation for 10 to 20
Ha potential area, with royalty $6/WMT
(included details should be confirm to the
owner)

PT. KMR offered on take over as much as IDR 35 billion, with IPPKH 953 Ha and 1.147 Ha of APL
ACCESSIBILITY

Both of IUP OP KMR & MMP located on Northwest of Kendari with approx. Distance 550 km on 14
hours travel distance by LV, trough province road. Others access Jakarta-Makasar-Pomala 3 hours by air
travel, carry on to land travel about 10 hours.
FORESTRY

PT. KMR – 2.100 Ha

PT. MMP –
PT. KMR–
2.400 Ha
2.100 Ha

IUP OP PT. KMR & PT. MMP has the same owner, with land condition on forestry concession approx. 953 Ha of KMR &
1.300 Ha of MMP (both of them has IPPKH PERMIT) and remaining area as APL/FOREST CONVERTION (others usage
land) on 1.147 Ha of KMR & 1.100 Ha of MMP.
GEOMORPHOLOGY REVIEW

The IUP OP of KMR & MMP composed of weak to moderately undulating hills geomorphological unit. The
slope on ranging 5% to 20% with ranging elevation 280 to 830 meter from sea level which is controlled
by young streams to adults with dendritic flow patterns. This geomorphological unit consist of resistant
rock / ultramafic rocks unit, which has possibility as forming nickel deposits .
LAND USED & SITUATION
IUP OP PT. KMR

HP APL

Udulating hills geomorphological unit at IUP OP of PT. KMR on relatively west to east ridges direction. Land used as
Production Forest and APL (civilian garden of pepper and clove).

IUP OP PT. MMP


HP

APL

Undulating hills geomorphological unit at IUP OP of PT. MMP on relatively northwest to southeast ridges direction .
Land used as Production Forest and APL (civilian garden of pepper and clove).
GEOLOGY REGIONAL

The IUP OP KMR & MMP based on regional geology map of Bungku sheet, Sulawesi, consist of 2 (two)
rocks formation, that are :
1. Kompleks Ultramafik (Ku)/Ultramafic Complex rocks with Harzburgit, lherzolit, wehrlit, websterit,
serpentinit, dunit, diabas and gabro, which are has possibility as forming nickel deposits with almost
90% covering area.
2. Formation Matano (Kml): as sediment clastic which composed of clastical sandstone & limestone.
GEOLOGY REGIONAL REVIEW

Clastic sediment

Clastic sediment

Regional geological review carried out by tracing outcrops in the both of two IUP OP prospect area
THE OUTCROPS ON IUP OP KMR

Oc_S1KMR as regolith/rocky saprolite type


THE OUTCROPS ON IUP OP KMR

Limonite

Regolith

Oc_S3KMR as regolith/rocky saprolite type


Oc_S6KMR as soft saprolite type

Limonite

Regolith

Oc_S2KMR as regolith/rocky saprolite type


The outcrops has been discovered on the southwest hill of IUP OP KMR, as soft to rocky saprolite type
THE OUTCROPS ON IUP OP KMR

Oc_S5KMR as regolith/rocky saprolite


type

Oc_S4KMR as soft to rocky saprolite type

The outcrops has been discovered on the northeast hill of IUP OP KMR, as soft to rocky saprolite type
THE OUTCROPS ON IUP OP MMP
SAPROLITE ON IUP OP MMP Oc_S3MMP as soft saprolite type
Limonite Limonite Limonite

Soft to medium grained of saprolite


Soft saprolite Soft saprolite

Oc_S1MMP as soft saprolite type Oc_S2MMP as soft saprolite type

Limonite

Soft saprolite

Oc_S2MMP as soft saprolite type


PROSPECTING AREA

Laterite
distribution
Laterite
distribution

Laterite
distribution

Based on laterite distribution in IUP OP of KMR, obtained potential area approx. 350 Ha, which is
confirmatory by saprolite outcrop.
HAULING ACCESS

Hauling access used existing road (ex-logging activity) on approx. Distance 15,57 km to the Jetty MMP.
The existing road composed by km road on 5 to 7 meter width, concreted by split rocks and
km road on 3 meter width un-concreted yed (access to the civiliant plantation)
HAULING ACCESS _

Crossing
Bridge province road
installation

Hauling access on existing road along 10.25km with 5 to 7 meter width and has concreted. This road access
required widening up to 15 meter width, installation of one bridge and several culverts (3 till 5 culverts).
HAULING ACCESS _

Hauling access on existing road along 5.57km with 3to 5 meter width and un-concreted yet. This road access
required widening up to 10 meter width, installation of one bridge and several culverts (3 culverts).
JETTY CONDITION
EFO 2

EFO 1

EFO

JETTY

Jetty plan belongs to PT. MMP with EFO stock yard on capacity approx. 25.000WMT of ore. Jetty required
ground pilling and dolphin & tower support pilling and EFO stock yard widening to increased ore capacity
storage.
NICKEL LOGISTIC

Indoferro Bantaeng

Nickel logistic access preferred to Bantaeng Smelter-South Sulawesi on approx. Distance


254,2 Nmiles and Ciwandan-Indoferro-Cilegon-West Java on approx. Distance 1.276 Nmiles,
whih is access from Jetty MMP.
RECOMENDATION
1. Validating all legal aspects of the IUP OP PT. Kolaka Mineral resources & PT. Mulia Makmur Perkasa,
on the regulations of the Ministry of ESDM and Environment & Forestry
2. Validating TERMINAL KHUSUS permit of PT. MMP from Ministry of Transportation
3. Validating all exploration data base (topographic data, drill holes data & sample analysis)
4. Social issues that are currently developing related to activities in IUP OP PT. Kolaka Mineral resources
(land acquisition, local employment absorption).
5. Conducted due diligent as the basis mineable reserves verification (topographic mapping, geology
mapping details, test pit and drilling confirmatory).
6. Resources estimation based on prospecting block 350 Ha in the assumption 350x10.000x1m = 3,5
million m3 similar to 4,9 million WMT (saprolite thickness 1 m & density 1,4).
7. Nickel product on ranging 1,7% up to >1,9%, with Fe >35% and Si/Mg >2% (acceptable for all
smelter which has resources High Grade nickel)
8. Exploration drilling and development should be conducted in order to obtain a high level of confidence
in the calculation of mineable reserves and long-term mining design.
9. Capex_2 required approx. USD 4,9 million, according to preliminary general development,
construction mining, haul road and port of this IUP OP.
10. Nickel logistic access preferred to Bantaeng Smelter on 254,2 nmiles (Bantaeng Smelter received Ni-
>1,6% product & Si/Mg > 2,5) and Ciwandan-Indoferro-Cilegon with approx.distance 1.276 nmiles,
from Jetty MMP.

You might also like