June 2012 Camama Electrical Project


Bills of Quantities
Phase 3
Electrical Infrastructure works
Camama
Electrical Infrastructure works

Item Description Unit Estimated Unit Rate Amount


Quantity
0.00
for Phase 3

16025 Builder's Works 0.00


0.00
16025.1 Foundations for Street lighting poles 0.00
Construct the following foundations for street lighting
poles, complete including all necessary excavation,
concrete works using ordinary Portland cement to ASTM
C150, Type I, 11 MPa on Cylinder for blinding and 30
MPa on Cylinder for reinforced concrete works, all
necessary formwork, reinforcement, accessories,
application of two coats of bituminous paint to concrete
surfaces in contact with soil, backfilling, compaction,
removal of resulting materials to approved dumping areas,
and all other related works, all as specified, shown on
drawings, to the satisfaction of the Engineer, and in full
coordination with relevant local authorities.

0.00
16025.1.1 Foundation for 8m high street lighting pole with single
bracket. № 22 0.00 0.00
Unit Rate in Words: 0.00
0.00
0.00
16025.1.2 Foundation for 8m high street lighting pole with double
bracket. № 5 0.00 0.00
Unit Rate in Words: 0.00
0.00
0.00
16025.2 Manholes for LV Power Supply 0.00
Supply all required materials, and construct the following
manholes complete including, but not limited to, all
necessary excavation, concrete works using ordinary
Portland cement to ASTM C150, Type I, 11 MPa on
Cylinder for blinding and 30 MPa on Cylinder for
reinforced concrete works, all necessary formwork,
reinforcement, accessories, application of two coats of
bituminous paint to concrete surfaces in contact with soil,
backfilling, compaction, removal of surplus materials to
approved dumping areas, covers and frames, authority
marking and all other related works, all as specified, shown
on the drawings, to the satisfaction of the Engineer, and in
full coordination with relevant local authorities.

0.00
16025.2.1 Manhole with Heavy duty cover and frame for LV power
supply network, internal size 1000 x 1000 x 1200 mm.
№ 3 0.00
Unit Rate in Words: 0.00
0.00
0.00
16025.2.2 Pull Boxes to be installed every 25 m of ducts run LS 0.00
Unit Rate in Words: 0.00
0.00
0.00

Carried to Collection ____________


_________________________________________________________________________________
740287883.xls
6.2.1
Date: 03/30/2024
June 2012 Camama Electrical Project
Bills of Quantities
Phase 3
Electrical Infrastructure works
Camama
Electrical Infrastructure works

Item Description Unit Estimated Unit Rate Amount


Quantity
0.00
for Phase 3

16025.3 Duct Banks with PVC Ducts for LV Network 0.00


Supply all required materials, and construct the following
duct banks with PVC ducts, complete including ducts,
excavation, concrete bed and surround using ordinary
Portland cement to ASTM C150, Type I, 30 MPa on
Cylinder, all necessary formwork, reinforcement,
accessories, backfilling, compaction, removal of surplus
material to approved dumping areas, warning tape,
protection tiles and all other related works, all as specified,
shown on the drawings, to the satisfaction of the Engineer,
and in full coordination with relevant local authorities.

0.00
16025.3.1 Duct banks with PVC ducts, 2 x 100 mm diameter lm 350 0.00
Unit Rate in Words: 0.00
0.00
0.00
16025.4 Duct Banks with PVC Ducts for Street Lighting Network 0.00
Supply all required materials, and construct the following
duct banks with PVC ducts, complete including ducts,
excavation, concrete bed and surround using ordinary
Portland cement to ASTM C150, Type I, 30 MPa on
Cylinder, all necessary formwork, reinforcement,
accessories, backfilling, compaction, removal of surplus
material to approved dumps, warning tape, protection tiles
and all other related works, all as specified, shown on
drawings, to the satisfaction of the Engineer, and in full
coordination with relevant local authorities.

0.00
16025.4.1 Duct banks with PVC ducts, 1 x 100 mm diameter lm 700 0.00
Unit Rate in Words: 0.00
0.00

16025.50 Manholes or Handholes for Telecommunication system 0.00


Supply all required materials, and construct the following
manholes or handholes complete including all necessary
excavation, concrete works using ordinary Portland cement
to ASTM C150, Type I, 11 MPa on Cylinder for blinding
and 30 MPa on Cylinder for reinforced concrete works, all
necessary formwork, reinforcement, accessories,
application of two coats of bituminous paint to concrete
surfaces in contact with soil, backfilling, compaction,
removal of surplus materials to approved dumping area,
covers and frames, and all other related works, all as
specified, shown on the drawings, to the satisfaction of the
Engineer, and in full coordination with relevant local
authorities.

0.00
16025.5.1 Handhole with one cover, type "HH1C" № 5 0.00 0.00
Unit Rate in Words: 0.00
0.00
0.00
16025.5.2 Handhole with two covers, type "HH2C" № 0.00 0.00
Unit Rate in Words: 0.00
0.00
0.00
16025.5.3 Handhole with two covers, type "HH3C" № 0.00 0.00
Unit Rate in Words: 0.00
0.00
0.00

Carried to Collection ____________


_________________________________________________________________________________
740287883.xls
6.2.2
Date: 03/30/2024
June 2012 Camama Electrical Project
Bills of Quantities
Phase 3
Electrical Infrastructure works
Camama
Electrical Infrastructure works

Item Description Unit Estimated Unit Rate Amount


Quantity
0.00
for Phase 3

16025.60 Duct Banks for Telecommunication System 0.00


Supply all required materials, and construct the following
duct banks with PVC ducts, complete including ducts,
excavation, concrete bed and surround using ordinary
Portland cement to ASTM C150, Type I, 30 MPa on
Cylinder, all necessary formwork, reinforcement,
accessories, backfilling, compaction, removal of surplus
material to approved dumping areas, and all other related
works, all as specified, shown on the drawings, to the
satisfaction of the Engineer, and in full coordination with
relevant local authorities.

0.00
16025.6.1 Duct banks with PVC ducts, 2 x 100 mm diameter lm 350 0.00
Unit Rate in Words: 0.00
0.00
0.00
16025.6.2 Duct banks with PVC ducts, 4 x 100 mm diameter lm 80 0.00
Unit Rate in Words: 0.00
0.00
0.00
16025.6.3 Duct banks with PVC ducts, 6 x 100 mm diameter lm 120 0.00
Unit Rate in Words: 0.00
0.00
0.00

Carried to Collection ____________


_________________________________________________________________________________
740287883.xls
6.2.3
Date: 03/30/2024
June 2012 Camama Electrical Project
Bills of Quantities
Phase 3
Electrical Infrastructure works
Camama
Electrical Infrastructure works

Item Description Unit Estimated Unit Rate Amount


Quantity
0.00
for Phase 3

16025.70 Transformers Rooms 0.00


Supply all required materials and construct the following
transformers rooms, complete including excavation,
concrete works using ordinary Portland cement to ASTM
C150, Type I, 11 MPa on Cylinder for blinding and 30
MPa on Cylinder for reinforced concrete works, all
necessary formwork, reinforcement, accessories, block
work, plaster, waterproofing and roofing systems, and all
necessary civil, architectural and mechanical works to the
satisfaction of the Engineer and in full coordination with
relevant local authorities.

0.00

16025.7.1 Transformer rooms, 16 m²/unit dedicated to allocate one


U
transformer of any size 0.00
0.00
16025.7.1.1 Fair forced concrete columns, parapets and lintels. m³ 25 0.00
Unit Rate in Words: 0.00
0.00
0.00
16025.7.1.2 Concrete for foundations, tie beams and slab on grade and
roof slabs. m³ 150 0.00
Unit Rate in Words: 0.00
0.00
0.00
16025.7.1.3 Block Work, type Best or similar approved. m² 450 0.00
Unit Rate in Words: 0.00
0.00
0.00
16025.7.1.4 High tensile steel bar reinforcement including laps, dowels,
starters, any type, diameter and any length. Ton 25 0.00
Unit Rate in Words: 0.00
0.00
0.00
16025.7.1.5 Louvers, doors, windows, concrete tiles for internal
trenches and all accessories. Item 5 0.00
Unit Rate in Words: 0.00
0.00
0.00
16025.7.1.6 All necessary waterproofing and roofing systems Item 5 0.00
Unit Rate in Words: 0.00
0.00
0.00
16025.7.1.7 All necessary mechanical works. LS 1 0.00
Unit Rate in Words: 0.00
0.00

Carried to Collection ____________


_________________________________________________________________________________
740287883.xls
6.2.4
Date: 03/30/2024
June 2012 Camama Electrical Project
Bills of Quantities
Phase 3
Electrical Infrastructure works
Camama
Electrical Infrastructure works

Item Description Unit Estimated Unit Rate Amount


Quantity
0.00
for Phase 3

16025.7.2 Transformer rooms, 24 m²/unit dedicated to allocate two


U 2
transformers of any size 0.00
0.00
16025.7.2.1 Fair forced concrete columns, parapets and lintels. m³ 100 0.00
Unit Rate in Words: 0.00
0.00
0.00
16025.7.2.2 Concrete for foundations, tie beams and slab on grade and
roof slabs. m³ 400 0.00
Unit Rate in Words: 0.00
0.00
0.00
16025.7.2.3 Block Work, type Best or similar approved. m² 1,200 0.00
Unit Rate in Words: 0.00
0.00
0.00
16025.7.2.4 High tensile steel bar reinforcement including laps, dowels,
starters, any type, diameter and any length. Ton 60 0.00
Unit Rate in Words: 0.00
0.00
0.00
16025.7.2.5 Louvers, doors, windows, concrete tiles for internal
trenches and all accessories. Item 20 0.00
Unit Rate in Words: 0.00
0.00
0.00
16025.7.2.6 All necessary waterproofing and roofing systems Item 20 0.00
Unit Rate in Words: 0.00
0.00
0.00
16025.7.2.7 All necessary mechanical works. LS 1 0.00
Unit Rate in Words: 0.00
0.00

16065 Earthing System 0.00


0.00
Supply, install, connect, test and commission the following
earthing system complete including all necessary
electrodes, pits, excavation, backfilling, compaction, and all
other related works, all as specified, shown on the
drawings, to the satisfaction of the Engineer, and in full
coordination with relevant local authorities.
0.00
0.00
16065.1 Earthing system for substation neutral Item 2 0.00 0.00
Unit Rate in Words: 0.00
0.00
0.00
16065.2 Separate Earthing system for step-down transformers
Item 4 0.00 0.00
Unit Rate in Words: 0.00
0.00
0.00
16065.3 Earthing Pit for each 6 street lighting poles. Item 5 0.00 0.00
Unit Rate in Words: 0.00
0.00
0.00

Carried to Collection ____________


_________________________________________________________________________________
740287883.xls
6.2.5
Date: 03/30/2024
June 2012 Camama Electrical Project
Bills of Quantities
Phase 3
Electrical Infrastructure works
Camama
Electrical Infrastructure works

Item Description Unit Estimated Unit Rate Amount


Quantity
0.00
for Phase 3

16121 Medium and Low Voltage Cables 0.00


0.00
16121.1 MV Buried Cables 0.00
Supply, Install, connect, test and commission the following
MV buried cables, complete including all necessary
excavation, bedding, concrete tiles, warning tapes,
backfilling, compaction, removal of resulting material to
approved dumps, and all other related works, all as
specified, shown on the drawings, to the satisfaction of the
Engineer, and in full coordination with relevant local
authorities.
This rate shall also include cost of all wastage related to
cabling.
0.00
16121.1.1 3C 240 mm² CU/XLPE/SWA/PVC (Taken into account in
phase 1 works) lm 0 0.00 0.00
Unit Rate in Words: 0.00
0.00
0.00
16121.2 LV Cables 0.00
Supply, Install, connect, test and commission the following
LV cables from MDBs to Feeder Pillars and SMDBs and
from Feeder Pillars to street lighting poles, complete
including all necessary accessories and all other related
works, all as specified, shown on the drawings, to the
satisfaction of the Engineer, and in full coordination with
relevant local authorities. This rate shall also include
cost of all wastage related to cabling.

0.00
16121.2.1 4C240 CU/PVC/PVC lm 700 0.00 0.00
Unit Rate in Words: 0.00
0.00
0.00
16121.2.2 4C120 CU/PVC/PVC lm 0.00 0.00
Unit Rate in Words: 0.00
0.00
0.00
16121.2.3 4C25 CU/PVC/PVC lm 50 0.00
Unit Rate in Words: 0.00
0.00
0.00
16121.3 LV Cables for Street Lighting 0.00
Supply, install, connect, test and commission the following
LV cables, complete including all necessary accessories
and all other related works, all as specified, shown on the
drawings, to the satisfaction of the Engineer, and in full
coordination with relevant local authorities.
This rate shall also include cost of all wastage related to
cabling.

0.00

16121.3.1 4C70 CU/PVC/PVC lm 650 0.00


Unit Rate in Words: 0.00
0.00
0.00

Carried to Collection ____________


_________________________________________________________________________________
740287883.xls
6.2.6
Date: 03/30/2024
June 2012 Camama Electrical Project
Bills of Quantities
Phase 3
Electrical Infrastructure works
Camama
Electrical Infrastructure works

Item Description Unit Estimated Unit Rate Amount


Quantity
0.00
for Phase 3

16270 Transformers 0.00

16270.1 Transformers 0.00


Supply, install, connect, test and commission the following
oil type MV/LV distribution transformer complete
including all necessary cable terminations, cable glands,
auxiliary cables, all cable supports, all earthing materials,
all builders' work and all other related works, all as
specified, shown on the drawings, to the satisfaction of the
Engineer, and in full coordination with relevant local
authorities.
0.00

16270.1.1 MV/LV transformers rated 1000kVA № 3 0.00 0.00


Unit Rate in Words: 0.00
0.00
0.00
16270.1.2 MV/LV transformers rated 630kVA № 1 0.00 0.00
Unit Rate in Words: 0.00
0.00
0.00
16305 MV Transmission & Distribution 0.00
0.00
16305.1 MV Switchgears 0.00
Supply, Install, connect, test and commission the following
MV switchgears complete including all necessary related
cabling and connections, accessories, and all other related
builders' works, all as specified, shown on the drawings, to
the satisfaction of the Engineer, and in full coordination
with local authority.
0.00
0.00
16305.1.1 In/Out MV cells for 1000kVA Transformer № 6 0.00 0.00
Unit Rate in Words: 0.00
0.00

16305.1.2 Protection cells for 1000kVA Transformer № 3 0.00 0.00


Unit Rate in Words: 0.00
0.00
0.00
16305.1.3 In/Out MV cells for 630kVA Transformer № 2 0.00 0.00
Unit Rate in Words: 0.00
0.00
0.00
16305.1.4 Protection cells for 630kVA Transformer № 1 0.00 0.00
Unit Rate in Words: 0.00
0.00

Carried to Collection ____________


_________________________________________________________________________________
740287883.xls
6.2.7
Date: 03/30/2024
June 2012 Camama Electrical Project
Bills of Quantities
Phase 3
Electrical Infrastructure works
Camama
Electrical Infrastructure works

Item Description Unit Estimated Unit Rate Amount


Quantity
0.00
for Phase 3

16435 Feeder Pillars and LV Switchgears 0.00


0.00
16435.1 Feeder Pillars 0.00
Supply, install, connect, test and commission the following
feeder pillars complete including all necessary excavation,
concrete works using ordinary Portland cement to ASTM
C150, Type I, 11 MPa on Cylinder for blinding and 30
MPa on Cylinder for reinforced concrete works, necessary
formwork, reinforcement, accessories, galvanized steel
plate for cable protection, louvers with screen, galvanized
steel protection barriers, PVC sleeves, internal cabling, and
all other related works, all as specified, shown on drawings,
to the satisfaction of the Engineer, and in full coordination
with relevant local authorities.

0.00
16435.1.1 FP-SL-01 (Street Lighting Feeder Pillar) № 0.00 0.00
Unit Rate in Words: 0.00
0.00
0.00
16435.1.2 FP-SL-02 (Street Lighting Feeder Pillar) № 0.00 0.00
Unit Rate in Words: 0.00
0.00
0.00
16435.1.3 FP-SL-03 (Street Lighting Feeder Pillar) № 0.00 0.00
Unit Rate in Words: 0.00
0.00
0.00
16435.2 Main Distribution Boards (Located in substations) 0.00
Supply, install, connect, test and commission the following
Main Distribution Boards in substations, complete
including all necessary enclosure, circuit breakers, busbars
internal wiring, contactor, switches, control, necessary
transformer, concrete pad, steel plate, conduits, devices,
accessories, and all other related works, all as specified,
shown on the drawings, to the satisfaction of the Engineer,
and in full coordination with relevant local authorities.

0.00
16435.2.1 MDB-Z9-a № 1 0.00 0.00
Unit Rate in Words: 0.00
0.00
0.00
16435.2.2 MDB-Z9-b № 1 0.00 0.00
Unit Rate in Words: 0.00
0.00
0.00
16435.2.3 MDB-Z10-a № 1 0.00
Unit Rate in Words: 0.00
0.00
0.00
16435.2.4 MDB-Z10-b № 1 0.00 0.00
Unit Rate in Words: 0.00
0.00
0.00
16435.3 LV Panelboards in Substations 0.00
Supply, install, connect, test and commission the following
LV panelboards in substations, complete including all
necessary enclosure, circuit breakers, busbars internal
wiring, contactor, switches, control, necessary transformer,
concrete pad, steel plate, conduits, LV cables between
transformers and LV panels, devices, accessories, and all
other related works, all as specified, shown on the
drawings, to the satisfaction of the Engineer, and in full
coordination with relevant local authorities.

0.00

16435.3.1 LV panel in substation rooms. № 2 0.00 0.00


Unit Rate in Words: 0.00
0.00
0.00

Carried to Collection ____________


_________________________________________________________________________________
740287883.xls
6.2.8
Date: 03/30/2024
June 2012 Camama Electrical Project
Bills of Quantities
Phase 3
Electrical Infrastructure works
Camama
Electrical Infrastructure works

Item Description Unit Estimated Unit Rate Amount


Quantity
0.00
for Phase 3

16525 Street Lighting Installations 0.00


0.00
16525.1 Lighting Poles with Fixtures 0.00
Supply, install, connect, test and commission the following
lighting poles with fixtures complete including all
necessary corrosion protection, fuses, luminaire, control
gear, arms, internal cabling, connection box and protective
devices, pull box (if needed), accessories, necessary
photocells and all other related works, all as specified,
shown on the drawings, to the satisfaction of the Engineer,
and in full coordination with relevant local authorities.

0.00
16525.1.1 Decorative pole, 8 m high, with single bracket, including
water protected lighting fixture equipped with 1x150 W
HPS lamp, IP65. № 22 0.00 0.00
0.00
0.00
16525.1.2 Decorative pole, 8m high, with double brackets, each with
water protected lighting fixture equipped with 2x150 W
HPS lamps, IP65. № 5 0.00 0.00
Unit Rate in Words: 0.00
0.00
0.00

Carried to Collection ____________


_________________________________________________________________________________