Date of Production Date Tot. Pile Penetration Total Wr Ram Stroke (Hr) Final Set Wp Ru Ru PDA Remark
No. Code Pile SF
Bottom Modle Upper Driving Length (m) Depth (m) Blows (ton) (cm) S (cm) K (cm) (ton) (ton) (ton) Keterangan
1 87 87 / (IP.1) 30-8-07 28-09-07 3/6/2010 12/12/12 36.00 550 3.5 C 196.0 0.05 1.50 7.1676 2.5 116.02
2 218 218 / (IP.2) 4/6/2010 12/12/12/12 48.00 1087 3.5 C 196.0 1.47 0.00 9.5568 2.5 99.98
3 185 100 / (IP.3) 1/12/2010 8/5/2010 18/5/2010 5/6/2010 12/12/12 36.00 558 3.5 B 176.0 2.00 0.00 7.1676 2.5 80.84
4 13 1/2/2010 18/05/2010 18/05/2010 13/6/2010 12/12/12 26.00 571 3.5 B 176.0 1.30 0.50 7.1676 2.5 89.83 157
5 87 20/05/2010 19/05/2010 19/05/2010 16/6/2010 12/12/12 26.00 501 3.5 B 176.0 1.92 0.00 7.1676 2.5 84.11 157
6 83 20/05/2010 20/05/2010 20/05/2010 17/6/2010 12/12/12 31.50 386 3.5 7.1676 2.5 #DIV/0! PECAH KEPALA
7 84 19/05/2010 19/05/2010 20/05/2010 17/6/2010 12/12/12 36.00 649 3.5 B 176.0 2.34 0.00 7.1676 2.5 69.17
8 85 2/6/2010 19/05/2010 17/6/2010 12/12/12 36.00 535 3.5 B 176.0 1.70 0.00 7.1676 2.5 95.11
9 86 19/05/2010 20/05/2010 19/05/2010 17/6/2010 12/12/12 36.00 753 3.5 B 176.0 2.31 0.00 7.1676 2.5 69.92
10 1 1/6/2010 1/6/2010 1/5/2010 18/6/2010 12/12/12 36.00 705 3.5 B 176.0 2.11 0.50 7.1676 2.5 61.92 PECAH KEPALA
11 2 2/6/2010 2/6/2010 2/6/2010 18/6/2010 12/12/12 36.00 668 3.5 B 176.0 1.26 0.00 7.1676 2.5 128.61
12 81 4/6/2010 4/6/2010 4/6/2010 18/6/2010 12/12/12 36.00 610 3.5 B 176.0 2.58 0.00 7.1676 2.5 62.79
13 82 2/6/2010 4/6/2010 2/6/2010 18/6/2010 12/12/12 32.00 610 3.5 7.1676 2.5 #DIV/0! PECAH KEPALA
14 3 1/6/2010 1/6/2010 1/6/2010 19/6/2010 12/12/12 36.00 654 3.5 B 176.0 1.90 0.00 7.1676 2.5 85.10
15 4 2/6/2010 2/6/2010 2/6/2010 19/6/2010 12/12/12 36.00 875 3.5 C 196.0 1.56 0.70 7.1676 2.5 79.83
16 5 1/6/2010 13/5/2010 1/6/2010 19/6/2010 12/12/12 36.00 698 3.5 C 196.0 2.38 0.80 7.1676 2.5 56.71
17 6 1/6/2010 2/6/2010 2/6/2010 19/6/2010 12/12/12 36.00 767 3.5 C 196.0 1.76 0.00 7.1676 2.5 102.16
18 8 1/6/2010 1/6/2010 2/6/2010 19/6/2010 12/12/12 36.00 564 3.5 B 176.0 1.39 0.00 7.1676 2.5 116.53
19 7 1/6/2010 2/6/2010 1/6/2010 20/6/2010 12/12/12 36.00 530 3.5 C 196.0 1.61 0.60 7.1676 2.5 81.43
1
Date of Production Date Tot. Pile Penetration Total Wr Ram Stroke (Hr) Final Set Wp Ru Ru PDA Remark
No. Code Pile SF
Bottom Modle Upper Driving Length (m) Depth (m) Blows (ton) (cm) S (cm) K (cm) (ton) (ton) (ton) Keterangan
20 9 2/6/2010 2/6/2010 1/6/2010 20/6/2010 12/12/12 36.00 615 3.5 B 176.0 0.50 0.50 7.1676 2.5 161.69
21 10 4/6/2010 2/6/2010 2/6/2010 20/6/2010 12/12/12 36.00 599 3.5 C 196.0 1.95 1.00 7.1676 2.5 61.04
22 11 1/6/2010 2/6/2010 1/6/2010 20/6/2010 12/12/12 36.00 615 3.5 B 176.0 1.40 1.40 7.1676 2.5 57.74
22 12 2/6/2010 2/6/2010 2/6/2010 20/6/2010 12/12/12 36.00 722 3.5 B 176.0 2.33 0.40 7.1676 2.5 59.33
23 13 4/6/2010 1/6/2010 6/6/2010 20/6/2010 12/12/12 36.00 566 3.5 B 176.0 1.48 1.50 7.1676 2.5 54.35
24 14 1/6/2010 7/6/2010 7/6/2010 21/6/2010 12/12/12 36.00 581 3.5 B 176.0 1.63 0.50 7.1676 2.5 76.09
25 15 7/6/2010 2/6/2010 7/6/2010 21/6/2010 12/12/12 36.00 555 3.5 B 176.0 2.63 0.50 7.1676 2.5 51.60
26 16 7/6/2010 7/6/2010 7/6/2010 21/6/2010 12/12/12 36.00 599 3.5 B 176.0 1.41 1.20 7.1676 2.5 61.89
27 17 1/6/2010 8/6/2010 7/6/2010 21/6/2010 12/12/12 36.00 555 3.5 B 176.0 2.27 0.00 7.1676 2.5 71.33
28 18 2/6/2010 7/6/2010 8/6/2010 21/6/2010 12/12/12 36.00 618 3.5 B 176.0 0.97 0.40 7.1676 2.5 118.02
29 19 7/6/2010 2/6/2010 8/6/2010 22/6/2010 12/12/12 36.00 693 3.5 C 196.0 2.40 0.25 7.1676 2.5 67.95
30 20 2/6/2010 8/6/2010 8/6/2010 22/6/2010 12/12/12 36.00 713 3.5 C 196.0 3.33 0.00 7.1676 2.5 54.02
31 22 8/6/2010 8/6/2010 8/6/2010 22/6/2010 12/12/12 36.00 689 3.5 B 176.0 1.49 1.20 7.1676 2.5 60.13
32 21 1/6/2010 8/6/2010 23/6/2010 12/12/12 36.00 838 3.5 C 196.0 1.53 0.70 7.1676 2.5 80.93
33 219 9/6/2010 14/5/2010 14/5/2010 26/6/2010 12/12/12 36.00 739 3.5 B 176.0 2.21 0.00 7.1676 2.5 73.02
34 88 2/6/2010 14/5/2010 6/6/2010 26/6/2010 12/12/12 36.00 355 3.5 B 176.0 3.03 0.00 7.1676 2.5 53.30
35 89 7/5/2010 14/5/2010 6/6/2010 26/6/2010 12/12/12 36.00 368 3.5 B 176.0 2.92 0.00 7.1676 2.5 55.44
36 90 8/6/2010 11/6/2010 10/6/2010 26/6/2010 12/12/12 36.00 346 3.5 B 176.0 2.99 0.00 7.1676 2.5 54.15
37 91 14/5/2010 10/6/2010 25/5/2010 26/6/2010 12/12/12 36.00 341 3.5 B 176.0 2.72 0.00 7.1676 2.5 59.52
38 92 25/5/2010 25/5/2010 25/5/2010 28/6/2010 12/12/12 36.00 455 3.5 B 176.0 1.58 0.60 7.1676 2.5 74.34
39 94 14/5/2010 14/5/2010 8/6/2010 28/6/2010 12/12/12 36.00 488 3.5 B 176.0 2.93 0.00 7.1676 2.5 55.12
40 95 25/5/2010 10/6/2010 10/6/2010 28/6/2010 12/12/12 36.00 417 3.5 B 176.0 2.17 0.00 7.1676 2.5 74.46
41 96 10/6/2010 11/6/2010 8/6/2010 28/6/2010 12/12/12 36.00 383 3.5 B 176.0 2.75 0.00 7.1676 2.5 58.79
42 97 10/6/2010 8/6/2010 1/6/2010 28/6/2010 12/12/12 36.00 366 3.5 B 176.0 1.71 0.00 7.1676 2.5 94.32
43 93 10/6/2010 8/6/2010 10/6/2010 29/6/2010 12/12/12 36.00 689 3.5 B 176.0 3.31 0.00 7.1676 2.5 48.81
44 103 10/6/2010 3/6/2010 4/6/2010 29/6/2010 12/12/12 36.00 461 3.5 B 176.0 2.12 0.15 7.1676 2.5 71.33
45 104 10/6/2010 12/6/2010 25/5/2010 29/6/2010 12/12/12 36.00 453 3.5 B 176.0 3.19 0.00 7.1676 2.5 50.72
46 105 10/6/2010 11/6/2010 10/6/2010 29/6/2010 12/12/12 36.00 317 3.5 B 176.0 2.93 0.00 7.1676 2.5 55.28
47 106 10/6/2010 9/6/2010 11/6/2010 29/6/2010 12/12/12 36.00 390 3.5 B 176.0 3.14 0.00 7.1676 2.5 51.45
48 109 10/6/2010 2/6/2010 8/6/2010 29/6/2010 12/12/12 36.00 462 3.5 B 176.0 1.90 0.10 7.1676 2.5 80.84
2
Date of Production Date Tot. Pile Penetration Total Wr Ram Stroke (Hr) Final Set Wp Ru Ru PDA Remark
No. Code Pile SF
Bottom Modle Upper Driving Length (m) Depth (m) Blows (ton) (cm) S (cm) K (cm) (ton) (ton) (ton) Keterangan
49 107 14/6/2010 14/06/2010 3/6/2010 30/6/2010 12/12/12 36.00 378 3.5 B 176.0 2.44 0.00 7.1676 2.5 66.14
50 108 8/6/2010 1/6/2010 10/6/2010 30/6/2010 12/12/12 36.00 392 3.5 B 176.0 2.44 0.00 7.1676 2.5 66.14
51 110 1/6/2010 1/6/2010 9/6/2010 30/6/2010 12/12/12 36.00 383 3.5 B 176.0 2.50 0.00 7.1676 2.5 64.67
52 111 9/6/2010 18/06/2010 14/6/2010 30/6/2010 12/12/12 36.00 378 3.5 B 176.0 3.27 0.00 7.1676 2.5 49.50
53 112 14/6/2010 9/6/2010 11/6/2010 30/6/2010 12/12/12 36.00 431 3.5 B 176.0 2.51 0.50 7.1676 2.5 53.64
54 113 8/6/2010 17/06/2010 17/06/2010 30/6/2010 12/12/12 36.00 436 3.5 B 176.0 2.23 0.50 7.1676 2.5 59.15
55 114 3/6/2010 17/06/2010 17/06/2010 30/6/2010 12/12/12 36.00 380 3.5 B 176.0 3.22 0.00 7.1676 2.5 50.18
3
STOCK PILES AND USED OF SPUN PILE
Date No. Pol SPUN PILE STOCK LENGTH (meter) Use of Pile Length (meter)
Keterangan
Delivery Truck Date Product. Bottom 12 m Midle & Upper 12 m Used Date N0. No. Piles Bottom 12 m Midle & Upper 12 m
9 11.50 80.00
8 11.50 45.00
7 11.50 36.00
6 11.50 35.00
5 11.50 36.00
4 11.50 28.00
3 11.50 48.00
2 11.50 39.00
10 11.50 31.00
11 11.50 20.00
12 11.50 33.00
Actual Usage of Piles (Pc)