Ru = Daya Dukung Ultimate Tiang Pancang

eh 2 Wr Hr Wr + n2 Wp. 1 eh = Faktor efisiensi dari Hammer (0.85 - 1.00) diambil 1


Ru = ----------------- . ------------------ -----
S+K Wr + Wp. SF Wr. = Berat Ramp, (ton)
Wp. = Berat Tiang Pancang, (ton)
SF = Safety faktor / Angka Keamanan diambil 3 - 4
S = Penurunan Terakhir perpukulan
K = Safety faktor / Angka Keamanan diambil 2.5

Date of Production Date Tot. Pile Penetration Total Wr Ram Stroke (Hr) Final Set Wp Ru Ru PDA Remark
No. Code Pile SF
Bottom Modle Upper Driving Length (m) Depth (m) Blows (ton) (cm) S (cm) K (cm) (ton) (ton) (ton) Keterangan

1 87 87 / (IP.1) 30-8-07 28-09-07 3/6/2010 12/12/12 36.00 550 3.5 C 196.0 0.05 1.50 7.1676 2.5 116.02
2 218 218 / (IP.2) 4/6/2010 12/12/12/12 48.00 1087 3.5 C 196.0 1.47 0.00 9.5568 2.5 99.98
3 185 100 / (IP.3) 1/12/2010 8/5/2010 18/5/2010 5/6/2010 12/12/12 36.00 558 3.5 B 176.0 2.00 0.00 7.1676 2.5 80.84

4 13 1/2/2010 18/05/2010 18/05/2010 13/6/2010 12/12/12 26.00 571 3.5 B 176.0 1.30 0.50 7.1676 2.5 89.83 157

5 87 20/05/2010 19/05/2010 19/05/2010 16/6/2010 12/12/12 26.00 501 3.5 B 176.0 1.92 0.00 7.1676 2.5 84.11 157

6 83 20/05/2010 20/05/2010 20/05/2010 17/6/2010 12/12/12 31.50 386 3.5 7.1676 2.5 #DIV/0! PECAH KEPALA
7 84 19/05/2010 19/05/2010 20/05/2010 17/6/2010 12/12/12 36.00 649 3.5 B 176.0 2.34 0.00 7.1676 2.5 69.17
8 85 2/6/2010 19/05/2010 17/6/2010 12/12/12 36.00 535 3.5 B 176.0 1.70 0.00 7.1676 2.5 95.11
9 86 19/05/2010 20/05/2010 19/05/2010 17/6/2010 12/12/12 36.00 753 3.5 B 176.0 2.31 0.00 7.1676 2.5 69.92

10 1 1/6/2010 1/6/2010 1/5/2010 18/6/2010 12/12/12 36.00 705 3.5 B 176.0 2.11 0.50 7.1676 2.5 61.92 PECAH KEPALA
11 2 2/6/2010 2/6/2010 2/6/2010 18/6/2010 12/12/12 36.00 668 3.5 B 176.0 1.26 0.00 7.1676 2.5 128.61
12 81 4/6/2010 4/6/2010 4/6/2010 18/6/2010 12/12/12 36.00 610 3.5 B 176.0 2.58 0.00 7.1676 2.5 62.79
13 82 2/6/2010 4/6/2010 2/6/2010 18/6/2010 12/12/12 32.00 610 3.5 7.1676 2.5 #DIV/0! PECAH KEPALA

14 3 1/6/2010 1/6/2010 1/6/2010 19/6/2010 12/12/12 36.00 654 3.5 B 176.0 1.90 0.00 7.1676 2.5 85.10
15 4 2/6/2010 2/6/2010 2/6/2010 19/6/2010 12/12/12 36.00 875 3.5 C 196.0 1.56 0.70 7.1676 2.5 79.83
16 5 1/6/2010 13/5/2010 1/6/2010 19/6/2010 12/12/12 36.00 698 3.5 C 196.0 2.38 0.80 7.1676 2.5 56.71
17 6 1/6/2010 2/6/2010 2/6/2010 19/6/2010 12/12/12 36.00 767 3.5 C 196.0 1.76 0.00 7.1676 2.5 102.16
18 8 1/6/2010 1/6/2010 2/6/2010 19/6/2010 12/12/12 36.00 564 3.5 B 176.0 1.39 0.00 7.1676 2.5 116.53

19 7 1/6/2010 2/6/2010 1/6/2010 20/6/2010 12/12/12 36.00 530 3.5 C 196.0 1.61 0.60 7.1676 2.5 81.43

1
Date of Production Date Tot. Pile Penetration Total Wr Ram Stroke (Hr) Final Set Wp Ru Ru PDA Remark
No. Code Pile SF
Bottom Modle Upper Driving Length (m) Depth (m) Blows (ton) (cm) S (cm) K (cm) (ton) (ton) (ton) Keterangan

20 9 2/6/2010 2/6/2010 1/6/2010 20/6/2010 12/12/12 36.00 615 3.5 B 176.0 0.50 0.50 7.1676 2.5 161.69
21 10 4/6/2010 2/6/2010 2/6/2010 20/6/2010 12/12/12 36.00 599 3.5 C 196.0 1.95 1.00 7.1676 2.5 61.04
22 11 1/6/2010 2/6/2010 1/6/2010 20/6/2010 12/12/12 36.00 615 3.5 B 176.0 1.40 1.40 7.1676 2.5 57.74
22 12 2/6/2010 2/6/2010 2/6/2010 20/6/2010 12/12/12 36.00 722 3.5 B 176.0 2.33 0.40 7.1676 2.5 59.33
23 13 4/6/2010 1/6/2010 6/6/2010 20/6/2010 12/12/12 36.00 566 3.5 B 176.0 1.48 1.50 7.1676 2.5 54.35

24 14 1/6/2010 7/6/2010 7/6/2010 21/6/2010 12/12/12 36.00 581 3.5 B 176.0 1.63 0.50 7.1676 2.5 76.09
25 15 7/6/2010 2/6/2010 7/6/2010 21/6/2010 12/12/12 36.00 555 3.5 B 176.0 2.63 0.50 7.1676 2.5 51.60
26 16 7/6/2010 7/6/2010 7/6/2010 21/6/2010 12/12/12 36.00 599 3.5 B 176.0 1.41 1.20 7.1676 2.5 61.89
27 17 1/6/2010 8/6/2010 7/6/2010 21/6/2010 12/12/12 36.00 555 3.5 B 176.0 2.27 0.00 7.1676 2.5 71.33
28 18 2/6/2010 7/6/2010 8/6/2010 21/6/2010 12/12/12 36.00 618 3.5 B 176.0 0.97 0.40 7.1676 2.5 118.02

29 19 7/6/2010 2/6/2010 8/6/2010 22/6/2010 12/12/12 36.00 693 3.5 C 196.0 2.40 0.25 7.1676 2.5 67.95
30 20 2/6/2010 8/6/2010 8/6/2010 22/6/2010 12/12/12 36.00 713 3.5 C 196.0 3.33 0.00 7.1676 2.5 54.02
31 22 8/6/2010 8/6/2010 8/6/2010 22/6/2010 12/12/12 36.00 689 3.5 B 176.0 1.49 1.20 7.1676 2.5 60.13

32 21 1/6/2010 8/6/2010 23/6/2010 12/12/12 36.00 838 3.5 C 196.0 1.53 0.70 7.1676 2.5 80.93

33 219 9/6/2010 14/5/2010 14/5/2010 26/6/2010 12/12/12 36.00 739 3.5 B 176.0 2.21 0.00 7.1676 2.5 73.02
34 88 2/6/2010 14/5/2010 6/6/2010 26/6/2010 12/12/12 36.00 355 3.5 B 176.0 3.03 0.00 7.1676 2.5 53.30
35 89 7/5/2010 14/5/2010 6/6/2010 26/6/2010 12/12/12 36.00 368 3.5 B 176.0 2.92 0.00 7.1676 2.5 55.44
36 90 8/6/2010 11/6/2010 10/6/2010 26/6/2010 12/12/12 36.00 346 3.5 B 176.0 2.99 0.00 7.1676 2.5 54.15
37 91 14/5/2010 10/6/2010 25/5/2010 26/6/2010 12/12/12 36.00 341 3.5 B 176.0 2.72 0.00 7.1676 2.5 59.52

38 92 25/5/2010 25/5/2010 25/5/2010 28/6/2010 12/12/12 36.00 455 3.5 B 176.0 1.58 0.60 7.1676 2.5 74.34
39 94 14/5/2010 14/5/2010 8/6/2010 28/6/2010 12/12/12 36.00 488 3.5 B 176.0 2.93 0.00 7.1676 2.5 55.12
40 95 25/5/2010 10/6/2010 10/6/2010 28/6/2010 12/12/12 36.00 417 3.5 B 176.0 2.17 0.00 7.1676 2.5 74.46
41 96 10/6/2010 11/6/2010 8/6/2010 28/6/2010 12/12/12 36.00 383 3.5 B 176.0 2.75 0.00 7.1676 2.5 58.79
42 97 10/6/2010 8/6/2010 1/6/2010 28/6/2010 12/12/12 36.00 366 3.5 B 176.0 1.71 0.00 7.1676 2.5 94.32

43 93 10/6/2010 8/6/2010 10/6/2010 29/6/2010 12/12/12 36.00 689 3.5 B 176.0 3.31 0.00 7.1676 2.5 48.81
44 103 10/6/2010 3/6/2010 4/6/2010 29/6/2010 12/12/12 36.00 461 3.5 B 176.0 2.12 0.15 7.1676 2.5 71.33
45 104 10/6/2010 12/6/2010 25/5/2010 29/6/2010 12/12/12 36.00 453 3.5 B 176.0 3.19 0.00 7.1676 2.5 50.72
46 105 10/6/2010 11/6/2010 10/6/2010 29/6/2010 12/12/12 36.00 317 3.5 B 176.0 2.93 0.00 7.1676 2.5 55.28
47 106 10/6/2010 9/6/2010 11/6/2010 29/6/2010 12/12/12 36.00 390 3.5 B 176.0 3.14 0.00 7.1676 2.5 51.45
48 109 10/6/2010 2/6/2010 8/6/2010 29/6/2010 12/12/12 36.00 462 3.5 B 176.0 1.90 0.10 7.1676 2.5 80.84

2
Date of Production Date Tot. Pile Penetration Total Wr Ram Stroke (Hr) Final Set Wp Ru Ru PDA Remark
No. Code Pile SF
Bottom Modle Upper Driving Length (m) Depth (m) Blows (ton) (cm) S (cm) K (cm) (ton) (ton) (ton) Keterangan

49 107 14/6/2010 14/06/2010 3/6/2010 30/6/2010 12/12/12 36.00 378 3.5 B 176.0 2.44 0.00 7.1676 2.5 66.14
50 108 8/6/2010 1/6/2010 10/6/2010 30/6/2010 12/12/12 36.00 392 3.5 B 176.0 2.44 0.00 7.1676 2.5 66.14
51 110 1/6/2010 1/6/2010 9/6/2010 30/6/2010 12/12/12 36.00 383 3.5 B 176.0 2.50 0.00 7.1676 2.5 64.67
52 111 9/6/2010 18/06/2010 14/6/2010 30/6/2010 12/12/12 36.00 378 3.5 B 176.0 3.27 0.00 7.1676 2.5 49.50
53 112 14/6/2010 9/6/2010 11/6/2010 30/6/2010 12/12/12 36.00 431 3.5 B 176.0 2.51 0.50 7.1676 2.5 53.64
54 113 8/6/2010 17/06/2010 17/06/2010 30/6/2010 12/12/12 36.00 436 3.5 B 176.0 2.23 0.50 7.1676 2.5 59.15
55 114 3/6/2010 17/06/2010 17/06/2010 30/6/2010 12/12/12 36.00 380 3.5 B 176.0 3.22 0.00 7.1676 2.5 50.18

3
STOCK PILES AND USED OF SPUN PILE

OWNER PT. SIGMA KARYA BUANA


KONTRAKTOR CV. INDOTEKNOTAMA LESTARI
LOCATION Desa Semudun , kecamatan sungai Kunyit,
Kabupaten Mempawah , Kalimantan Barat

Date No. Pol SPUN PILE STOCK LENGTH (meter) Use of Pile Length (meter)
Keterangan
Delivery Truck Date Product. Bottom 12 m Midle & Upper 12 m Used Date N0. No. Piles Bottom 12 m Midle & Upper 12 m

20 Mei 2010 BK.9922 BP 40180 17 17/05/2010 1 3


20/01/10 17/05/2010 1 3
2/1/10
21/11/10
8/12/09 13/06/2010 1 2
10/12/09 14/06/2010
2/2/10 15/06/2010
2/2/10 16/06/2010 1 2
17/06/2010 4 8
20 Mei 2010 BK 8314 BH 23/11/09 17 18/06/2010 4 8
1/2/09 19/06/2010 5 10
21/02/09 20/06/2010 6 12
9/12/09 21/06/2010 5 10
5/12/09 22/06/2010 3 6

Stoc of Files (Pc) 34 0 31 64


Sisa 3 -64
TOTAL LENGTH (M) 408 0 465 768
Panjang total Delivery 408 1233
Progress 249
STOCK PILES AND USED OF MINI PILES
OWNER PT. SIGMA KARYA BUANA
KONTRAKTOR CV. INDOTEKNOTAMA LESTARI
LOCATION Desa Semudun , kecamatan sungai Kunyit,
Kabupaten Mempawah , Kalimantan Barat

Date No. Pol PILE STOCK Use of Pile Lengt


Delivery Truck Bottom 6 m Midle / Upper 6 m Date of Used N0.

12/6/2023 BM8272 RO 35 13/6/2010 1


2
3
4
5
6
14/6/2023 BM8272 RO 27 14/6/2010 7
8
9
10
11
Stoc of Files (Pc) 62 0 Actual Usage of Piles (Pc)

Tot Length (m) 372 Actual Tot Length of usage (m

Design of length piles @ 12 m 2352 Design usage of length piles

Progress Delivery (%) 15.82 Progress Installation (%)


USED OF MINI PILES

Use of Pile Length (meter)


Keterangan
No. Piles used pile Bottom Midle / Upper

9 11.50 80.00
8 11.50 45.00
7 11.50 36.00
6 11.50 35.00
5 11.50 36.00
4 11.50 28.00
3 11.50 48.00
2 11.50 39.00
10 11.50 31.00
11 11.50 20.00
12 11.50 33.00
Actual Usage of Piles (Pc)

Actual Tot Length of usage (m)

Design usage of length piles @ 12 m

Progress Installation (%)