You are on page 1of 2

MAINTENANCE PROCEDURE NO. IN-AR-001-PM REV.

02 DATE: 17-11-01
TITLE/TAG FUNCTION CHECK BTEX ANALYZER
EQUIPMENT TYPE BTEX ANALYZER
INTERVAL 1 MONTHLY
PRECAUTIONS
Note: Tick boxes to indicate completion.
1. Obtain an approved Work Permit before commencing activities. 

PREPARATION/ISOLATION
2. Check that the equipment tags are as detailed on work order sheet/work permit.  
CAUTION: ONLY QUALIFIED PERSONS ARE AUTHORISED TO PERFORM THIS
PROCEDURE. REFER TO WARNINGS AND PRECAUTIONS IN VENDOR
MANUAL.
MAINTENANCE ACTIVITY
3. Check the unit for any signs of damage. 
4. Check the status of the analyzer control panel. 
5. Check the condition of emitter, receiver & optical-fibre. 
6. Check and adjust as necessary reference calibration of the analyzer. 
7. Check hardware requirements needed for reference calibration of the analyzer.  
8. Check and adjust as necessary analyzer’s if zero response deviates more than 0.025ppm from zero.
Perform reference calibration (Refer to section 5.2.2 of vendor’s manual) 
9. Back up data from the hard disk to Compact Disk. 
10. Keep maintenance records of the analyzer at the monitoring station.  
11. Sign off the work permit. 

REPAIR WORK
12. Is repair work or corrective action required? YES  NO 
13. Has a Work Order been raised? YES  NO 

REFERENCE INFORMATION
Opto-Analyzer for Air Quality Monitoring Hardware Operating Manual
Appendix D of Document Number 5-A-AA-EC-E-0001

You might also like