AGENCY
Training to prepare Member State officials for the audit under IMSAS
Resolution A.1067(28) – Procedures for the IMSAS
Chapter 4 Planning the audit (MS and IMO MSA)
• Due to
• 7-year • not less extraordinary
than 18 circumstances,
in writing and
months six months
before before the
scheduled date
2
Planning
Part II - Para 4 Initial arrangements
All fluent in
the language
of the audit.
Possibly one
speaking the
Planned language of
Selection
and
of auditing the country-
conducted
team
as per MoC
3
Planning the audit – Audit scope
4
Planning the audit – IMO MSA
IMO Responsibilities
• designating a single
point of contact within
the Secretariat (IMO
Audit Officer);
• maintaining appropriate
records of the audit;
5
Planning the audit – Member State
6
MS preparation for the Audit
▪ Start to establish contact with the IMO MSA and the ATL
▪ Confidentiality
4.2.2 An audit will not proceed until a
Memorandum of Cooperation has been
signed and exchanged between the ▪ Responsibilities
Member State and the Secretary General.
▪ Scope (to be agreed)
4.2.3 The Memorandum of Cooperation
will confirm, inter alia, that the audit is to
be conducted in accordance with the ▪ Suspension, modification or
procedures contained therein. cancellation (one month written notice)
8
Planning the audit - MoC
The Member State must ensure that the State is properly named in the
MoC and that below section of the MoC reflect accurately the authorization
for release of audit reports, the scope and that the texts in square
brackets are addressed.
Confidentiality
10
Planning the audit – Selection of
Auditors
• Language
Activity Remarks
IMO notify MS about the Letter from the Secretary-General of IMO to the Minister of the
audit (at least 18 months MS notifying about the IMSAS audit and year/month of the
before) planned audit