GENFOCU

SITE ACCEPTANCE TEST REPORT FOR SUB MAIN DISTRIBUTION BOARD


PROJECT: SEA WORLD ABUDHABI SOLAR PV PROJECT
CLIENT M/S. MIRAL/SEA WORLD DATE: 16-03-2024
DEVLOPER M/S. EMERGE/MASDAR PAGE: 1 of 3
SOLAR EPC M/S. GOLDEN FALCON EQUIPMENT MDB-X13-L1
TESTING AGENCY M/S. GENFOCUS SUBSTATION / LOCATION UTILITY LV ROOM

1. BREAKER NAME PLATE DETAILS:

MAKE SCHNEIDER CURRENT RATING 2000A


TYPE MASTERPACT NW20H1 SL.NO DU213349966
VOLTAGE RATING 1000V ASSET DETAIL MDB-X13-L1

2. GENERAL CHECKS:

S No Description Result
1 Check visual inspection of LV PANEL, ACB and other equipment. OK
2 Check any damages, painting and identification label, etc. OK
3 Check the tightness of Cable and Equipment. OK
4 Check tag name of cable. NA
5 Check ACB Cable tightness. OK
6 Verify ACB Rating and panel details as per load schedule. OK
7 Check visual inspection of CT wiring. OK
8 Check the healthiness of the auxiliary fuse. OK
9 Check secondary injection ACB trip test. OK
10 Check torque tightness of Busbar & ACB. OK

3. BREAKER INSULATION RESISTANCE TEST:

ACB Condition Phase Applied Voltage (V) IR Value(GΩ) Remarks


R - R’ >100 OK
OFF Y - Y’ >100 OK
B - B’ >100 OK
500V DC for 1 Min
R-(Y+B+E) >100 OK
ON Y-(R+B+E) >100 OK
B-(R+Y+E) >100 OK

4. ACB CONTACT RESISTANCE TEST:


S No Phase Ref. Measured Value [µΩ] REMARKS
Tested by Witness by/Approved By Witness by/Approved By
Company GENFOCUS GOLDEN FALCON SEA WORLD
Name ABHILASH CHANDRAN
Signature
Date 16-03-2024
GENFOCU
S

SITE ACCEPTANCE TEST REPORT FOR SUB MAIN DISTRIBUTION BOARD


PROJECT: SEA WORLD ABUDHABI SOLAR PV PROJECT
CLIENT M/S. MIRAL/SEA WORLD DATE: 16-03-2024
DEVLOPER M/S. EMERGE/MASDAR PAGE: 2 of 3
SOLAR EPC M/S. GOLDEN FALCON EQUIPMENT MDB-X13-L1
TESTING AGENCY M/S. GENFOCUS SUBSTATION / LOCATION UTILITY LV ROOM

1 R-ɸ 15 OK
2 Y- ɸ 14 OK
3 B-ɸ 14 OK

5. BREAKER TRIP TEST REPORT: Note:(FFK Trip Test File Attached)

6. FINAL PROTECTION SETTING:


Protection curve Protection Setting Delay time Test trip
Long time (Ir) 1 x In 0.5@6Ir PASSED

Short time (Isd) 1.5 x Ir 0.1 I²t PASSED


Instantaneous (Ii) 2.0 x In - PASSED
Ground fault (Ig) A tg 0.1sec PASSED

1. REMARK: NIL

2. EQUIPMENT DETAILS:

Tested by Witness by/Approved By Witness by/Approved By


Company GENFOCUS GOLDEN FALCON SEA WORLD
Name ABHILASH CHANDRAN
Signature
Date 16-03-2024
GENFOCU
S

SITE ACCEPTANCE TEST REPORT FOR SUB MAIN DISTRIBUTION BOARD


PROJECT: SEA WORLD ABUDHABI SOLAR PV PROJECT
CLIENT M/S. MIRAL/SEA WORLD DATE: 16-03-2024
DEVLOPER M/S. EMERGE/MASDAR PAGE: 3 of 3
SOLAR EPC M/S. GOLDEN FALCON EQUIPMENT MDB-X13-L1
TESTING AGENCY M/S. GENFOCUS SUBSTATION / LOCATION UTILITY LV ROOM

SL.NO INSTRUMENT NAME MAKE/MODEL SERIAL NO CALIBRATION VALID


1 IR Tester Megger / MIT515 101283345 08-06-2024
3 Digital Multimeter Fluke / 87V 38030052 31-01-2025
4 MOM Programma / MOM200A 1603262 31-01-2025
7 Secondary Injection Schneider/FFK 10626017424 22-08-2024

Tested by Witness by/Approved By Witness by/Approved By


Company GENFOCUS GOLDEN FALCON SEA WORLD
Name ABHILASH CHANDRAN
Signature
Date 16-03-2024