Top 10 Primavera Interview Questions and Model Answers

The most common Management Interview Questions for Primavera interview and what is
the model answer to all of them, Best Interview Questions and Answers

Popular Interview Questions:


Preparing for a Primavera Interview is not difficult if you know what you are doing.
Just read and search about the company history and current ongoing projects and
check sample interview questions and answers for your job position. For the
Primavera interview, check out these Primavera interview questions and answers for
your reference.

Q1: What are the differences between free float, and total float, and what is
different between Float and Slack?

This is a very common question in a primavera interview, Float and slack are two
different words with the same meaning.
Free Float: amount of time, an activity can be delayed without delaying the
successor activity
Total Float: amount of time, an activity can be delayed without delaying the project
finish date.

Q2: What is a constraint in primavera?

Constraints in primavera is to fix the early or late start or finish date of an activity as
per the following options:
1) The Project Must be finished by.
2) Mandatory Start / Mandatory Finish.
3) Start / Finish On or After.
4) Start / Finish On or Before.
5) Start / Finish On.
6) Expected Finish.

Business Centre, Sharjah


+971 563 444 875
Publishing City Free Zone, Sharjah,
info@PlanningEngineer.Net https://planningengineer.net/
Page 1 of 5
Planning Engineer FZE Project Management & Planning Services and Training
‫بالنينغ إنجينير م م ح‬ ‫خدمات وتدريب إدارة المشروعات والتخطيط‬

Q3: How can you define the Critical Path in Primavera?

The sequence of activities describes the longest path from the data date to the end
of the project. In a schedule without any constraints, this will be all activities with
zero total float.

(If you have constraints that force negative float, simply filtering on total float equal
to or less than zero can bring up activities that are not on the critical path)

Q4:What is WBS?

WBS means Work Breakdown Structure. It represents a hierarchical breakdown of a


project into elements and deliverables.

Q5: What is an open-end activity in primavera?

An open-end activity is an activity that does not have any successor. Normally open-
end activity is not accepted in the schedule because the total float will be calculated
from the end of the project and these entire activities' late dates gather at the end of
the project and can not be prepared for a logical late start plan.

Q6: What is the difference between Retained Logic & Override Logic in progress
update?

If a project is generally running according to plan and activities are not progressed
out of sequence then there will be virtually no difference between the two methods.

BIG differences come when activities are progressed out of sequence. I believe in
retained logic. Invariably that will produce the longest critical path but if activities
have progressed out of sequence, there could be some resulting illogical
dependencies remaining, in particular resulting from dependencies with durations.

Progress override invariably produces a shorter critical path and again there could be
some illogical lack of dependencies resulting from activities having been progressed
out of sequence.

Business Centre, Sharjah


+971 563 444 875
Publishing City Free Zone, Sharjah,
info@PlanningEngineer.Net https://planningengineer.net/
Page 2 of 5
Planning Engineer FZE Project Management & Planning Services and Training
‫بالنينغ إنجينير م م ح‬ ‫خدمات وتدريب إدارة المشروعات والتخطيط‬

Q7: How do you measure & compare the progress using Primavera?

This is one of the hard Primavera interview questions, try to explain without
confusion.

Progress is measured primarily against the baseline. If the baseline has been loaded
with cost and/or resources, earned value management can be used for this purpose.

If not, progress is measured as variance to baseline dates.

• Budget at Completion (BAC)


• Planned Value (PV) = budget at Completion (BAC) x Planned % Complete
• Earned Value (EV) = budget at Completion (BAC) x Actual% Complete
• Actual Cost (AC) = No formula What you’ve spent on the project
• Schedule Performance Index (SPl) =Earned Value (EV) / Planned Value (PV)
• Schedule Variance (SV) =Earned Value (EV) – Planned Value (PV)
• Cost Performance Index (CPI) =Earned Value (EV) / Actual Cost (AC)
• To Complete Performance Index (TCPI) =(Budget at Completion (BAC) –
Earned Value (EV) ) / (Budget at Completion (BAC) -Actual Cost (AC) )
• Cost Variance (CV) = Earned Value (EV) -Actual Cost (AC)
For more information see this article: EVM earned value management

Q8: What is resource allocation and resource leveling?


Resource allocation is assigning resources to activities, and determining the amount
of labor, equipment, and money required for any activity.
Resource leveling is the resource requirements of all scheduled activities that are
compared to the maximum quantity available at the time of leveling.
An activity is delayed if too few resources are available at any time during the
activity’s duration. The maximum quantity for a resource is determined through the
max units/time for a particular resource in the “Resources” tab.

Q9: What is an S-Curve and how to create a curve in primavera?

An S-curve is a graph showing cumulative cost or value (measured in terms of money


or manhours) against time. On a typical project, these graphs follow an “S” shape,
hence the name. Typical data to be plotted on an S-Curve includes:

• Actual Cost (ACWP)


• Planned Value (BCWS) –Early dates
• Planned Value (BCWS) –Late dates
• Earned Value (BCWP)
• Forecast Value –Early dates
Business Centre, Sharjah
+971 563 444 875
Publishing City Free Zone, Sharjah,
info@PlanningEngineer.Net https://planningengineer.net/
Page 3 of 5
Planning Engineer FZE Project Management & Planning Services and Training
‫بالنينغ إنجينير م م ح‬ ‫خدمات وتدريب إدارة المشروعات والتخطيط‬

• Forecast value –Late dates


• Forecast Cost –Early dates
• Forecast cost –Late dates

Q10: What are the differences between flag and milestone activity in primavera?

This is one of the tricky Primavera interview questions.


Milestones & flags both are events rather than activities. Some client likes to use
flags rather than milestone due to the following differences.

• With the use of flags, the logic of the main event can be easily tracked as
these can not be created without a predecessor as a stand-alone allocating
the constraint. Whereas milestones can.
• Flags can not be updated manually as Primavera automatically update the
status as milestone can be updated manually.
• Flags can not be constrained only driven by predecessors as milestones can.
Advice: At the end of your primavera interview thank the interviewer by sending him
a thanking interview email following your interview.
You can also read Planning Engineer Interview Guide – 90 Questions and Model Answers

Article Link: https://planningengineer.net/top-10-primavera-interview-questions-and-


model-answers/

Business Centre, Sharjah


+971 563 444 875
Publishing City Free Zone, Sharjah,
info@PlanningEngineer.Net https://planningengineer.net/
Page 4 of 5
Planning Engineer FZE Project Management & Planning Services and Training
‫بالنينغ إنجينير م م ح‬ ‫خدمات وتدريب إدارة المشروعات والتخطيط‬

---------------
Useful links:
Join our email Newsletter, we send useful free content regularly:
https://planningengineer.net/newsletter/
Our Services https://planningengineer.net/our-services/
Our Courses: https://planningengineer.net/lp-courses/
Free Arabic Basic Course Playlist:
https://youtube.com/playlist?list=PL7qHhNmknL6F5IOHAsNnPVMt1X-fvYe3J
---------------
Keep in Touch:
WhatsApp: +201277767728
Email: Info@PlanningEngineer.Net
English YouTube Channel: https://www.youtube.com/c/PlanningengineerNet/videos
Arabic YouTube Channel: https://www.youtube.com/@planningengineer3906
Linked in: https://www.linkedin.com/company/planning-engineer-est/
Facebook Page: https://www.facebook.com/PlanningEngineerDotNet
Facebook Group: https://www.facebook.com/groups/1138400132963230
Twitter: https://twitter.com/PlanningEEst
Instagram: https://www.instagram.com/planningengineerest/
TikTok: https://www.tiktok.com/@planningengineerest
---------------

Business Centre, Sharjah


+971 563 444 875
Publishing City Free Zone, Sharjah,
info@PlanningEngineer.Net https://planningengineer.net/
Page 5 of 5