Professional Documents
Culture Documents
Cost
ost Esti
Estim
matio
ation
n Man
Manual ._T
22 NOV 2011
-
DEPARTMENT ORDER ) SUBJ
SUBJEC
ECT:
T: Cost
Cost Esti
Estima
mati
tion
on Manu
Manual
al for
for Low
Low
Rise Buildings
NO. 137 l
.)
Series of 201~ ~.""'"'7
In line
line with
with thethe Depa
Depart
rtme
ment
nt's
's Qual
Qualitityy Poli
Policy
cy to impl
implem
emen
entt proj
projec
ects ts at the
the righ
rightt cost
cost,, all
all
Impl
Implem
emen
enti
ting
ng OffiOffice
ces
s are
are here
hereby
by dire
direct
cted
ed to adop
adoptt the
the here in Cost Estimat
herein Estimation
ion Manual
Manual
for Low RiseRise Buildi
Buildings
ngs inin the
the dete
determrmin
inat
atio
ion
n of unit
unit cost
cost of Pay
Pay IteItems
ms of Work
Work invo
involv
lved
ed in
the constru
constructi
ction
on and
and repair/
repair/ret
retro
rofit
fittin
ting
g of low rise rise build
building
ing proje
projects
cts..
This
This Order
rder shal
shalll be cons
consis
iste
tent
nt with
with the
the impl
implem
emen
enta
tati
tion
on of D.O.
D.O. No.
No. 163,
163, Seri
Series
es of 2015
2015
"Stan
"Standar
dardd Forms
Forms of Progr
Program
am of Works
Works (POW)
(POW) and Appro
Approved
ved Budge
Budgett for the Contra
Contract
ct (ABC)"
with
with modi
modifi
fica
cati
tion
on on its forma
formatt and
and desc
descri
ript
ptio
ion
n of item numb
numb8'
8'rr and
and scop
scopee of work
workss (Ann
(Annex
ex
A) to conform with the DPWH Standard Specifications
Specifications for Public Works Structures, Volume
III (Build
(Building
ings,
s, Ports
Ports and Harbo
Harbors,
rs, Flood
Flood Contr
Controlol and Drainag
Drainagee Struct
Structur
ures
es and
and Water
Water Suppl
Supplyy
System
Systems)
s) and
and Standa
Standardi
rdized
zed Pay
Pay Items
Items of Work
Work for Buildi
Buildings
ngs as embod
embodied D.O. OS, Series
ied in D.O.
of 2017.
2017.
~~----
('
MARK A. VILLAR'
SecretarY
6.1.3 CSSD/BOC
CSSD/BOC
Depa,t
Depa,trre
rrent
nt of Publi
Public
c Works
Works and Highw
Highways
ays
Office
ce of the Secretary
Secretary
1111111111111I11111111111111111111111
WIN7W02039
FOREWORD
Consi
nsiste
stent with
with its
its com
commitm
itment to exc
excelle
ellenc
nce,
e, the
the Dep
Departme
tment of Pub
Public
lic Works
rks and
High
Highwa
ways
ys (DPW
(DPWH)
H) has
has contin
continuo
uous
usly
ly form
formul
ulat
ated
ed and
and deve
develo
lope
ped
d guid
guides
es and
and tech
techni
niqu
ques
es in
variou
various
s fields
fields of the constr
construct
uction
ion proces
process.
s. This is to ensur
ensure
e the highe
highest
st stand
standard
ards
s of outputs
outputs
at the
the righ
rightt cost
cost.. The
The DPWH
DPWH has
has alwa
always
ys ende
endeav
avor
ored
ed to stan
standa
dard
rdiz
ize
e all
all its
its proc
proces
esse
ses
s to
facili
facilitat
tate
e promp
promptt and efficie
efficient
nt respo
response
nse to the needs
needs of the Filipi
Filipino
no peop
people.
le.
This
This Cost
Cost Esti
Estima
mati
tion
on Manu
Manual
al for
for Low
Low Rise
Rise Build
Buildin
ings
gs prov
provid
ides
es Stan
Standa
dard
rd Cost
Cost Shee
Sheets
ts for
for
commo
common
n pay items
items of work
work in buildi
building
ng constr
construct
uction
ion in accor
accorda
dance
nce with
with the DPWH
DPWH Stand
Standard
ard
Spec
Specif
ific
icat
atio
ions
ns for
for Publ
Public
ic Struct
Structur
ures
es (Vol
(Volum
ume
e III)
III).. This
This manu
manual
al was
was purp
purpos
osel
ely
y deve
develo
lope
ped
d to
provi
provide
de unifo
uniform
rm refer
referen
ence/
ce/ba
basis
sis in unit
unit cost
cost estimati
estimation
on and
and in the
the prep
prepara
aratio
tion
n of Program
Program of
Work
Works
s (POW
(POW)) and
and Appr
Approv
oved
ed Budg
Budget
et of Cont
Contra
ract
ct (ABC
(ABC)) in tt1e
tt1e imp
imple
leme
ment
ntat
atio
ion
n of vario
various
us
DPWH infrastru
infrastructur
cture
e projects.
projects.
~~
MARK A. VILLAR
Secretary
Departmen
Departmentt of Public
Public Works and Highways
Highways
Office of the Secretary
1111111111111111111111111111111111111
WIN7W02039
COST
COST ESTIMAT
ESTIMATION
ION MANU
MANUAL
AL FOR LOW
LOW RISE
RISE BUILDI
BUILDINGS
NGS
TABLE OF CONTENTS
F()FlE:,",()Fl[)
F()FlE:,",()Fl[) ------------------
---------------------------
------------------
-----------------
-----------------
------------------
------------------
------------------
------------------
------------------
---------
TABL
TABLE:
E: ()F C()
C() NTE
TE::NT
NTS
S- - - - ---
------ - - - -----
------
----- - - ---- - ---- - - --- - - ---
------
--- - - - ----
---- - ---
---- - ---
--- - ii
[)E:FINITI()N
[)E:FINITI()N () F TE:FlMS ---------------------
------------------------------
------------------
------------------
------------------
------------------
------------------
----------------
------- i ii
UNIT
UNITS,
S, ABBF
ABBFlE
lE:V
:VIA
IATI
TI()
()NS
NS [) ACFl()NYMS-----------------------------------------------
AN[)
AN vi
PFlE:FACE:------ - - - - - - - - - - - ------- - - - ---------- - - ---- - ---- - - ---- - - ----- - - - ----- - ---- ---- ----- - vii
INTFl()[)UCTI()N-
INTFl()[)UCTI()N----------
-----------------
-----------------
-----------------
-----------------
-----------------
-----------------
-----------------
---------------.
-------. 1
B. STAN[
STAN[)AF
)AFl[)
l[) [)E:T
[)E:TAIL
AILE:[
E:[)) UNI
UNIT
T PFlICE
PFlICE:: ANA
ANALYS
LYSIS
IS ([)UP
([)UPA)
A) SHE:E:
SHE:E:TS
TS -----
--------
------
------
------
------
------
-----
-- 10
B.1 Summa
Summary
ry Table
Table of Items
Items of Work
Work and Descri
Descripti
ption
on -------
----------
-----
-----
------
-----
-----
-----
-----
------
-----
-----
------
-----
-----
---.. 11
Part
Part A - Earth
Earthwor
works
ks -----
--------
-----
-----
------
-----
-----
------
-----
-----
-----
-----
------
-----
-----
------
-----
-----
------
-----
-----
-----
-----
------
-----
-----
------
-----
-----
-----.
--. 23
.f
Part
Part B - Plain
Plain and
and Rein
Reinfor
forced
ced Concr
Concrete
ete Work
Work -----
-------
-----
------
-----
-----
------
-----
-----
------
-----
-----
-----
-----
------
-----
-----
------
----- 38
Part
Part C - Finishing-
Finishing----
-----
-----
------
-----
-----
-----
-----
------
-----
-----
------
-----
-----
------
-----
-----
-----
-----
------
-----
-----
------
-----
-----
------
-----
-----
-----
-----
------
-----
--,, 49
Part
Part D - Elec
Electr
tric
ical
al ----
------
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
---- 202
202
Part
Part E - Mech
Mechan
anic
ical
al ----
------
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
----
---- 252
252
C. CALCUL
CALCULATI(
ATI()N
)N ()F CYCLE: TIME: F()Fl
F()Fl HAULING
HAULING E:QUIPME:N
E:QUIPME:NT
T --------
------------
--------
--------
--------
--------
------
-- 272
C.1 Estima
Estimated
ted travel
travel speed
speed,, loadin
loading/u
g/unlo
nload
ading
ing time
time & allowa
allowance
nce for delay
delay ------
--------
-----
-----
-----
------
----- 273
273
C.2 Formu
Formula
la for
for the
the calc
calcula
ulatio
tion
n of dump
dump truck
truck trave
travell time -----
--------
------
-----
-----
------
-----
-----
-----
-----
------
-----
-----
------
---.. 273
273
C.3 Comput
Computati
ation
on of cycle
cycle time
time -----
--------
-----
-----
-----
-----
------
-----
-----
------
-----
-----
------
-----
-----
-----
-----
------
-----
-----
------
-----
-----
------
-----
-----
-----
--.. 273
273
D.1 Basis
Basis of Computati
Computation
on'' -----
--------
------
-----
-----
-----
-----
------
-----
-----
------
-----
-----
------
-----
-----
-----
-----
------
-----
-----
------
-----
-----
-----
-----
------
-----
-----
---.. 275
D.2 Condi
Conditio
tion
n for the usage
usage of the labor
labor rate
rates
s ----
-------
------
-----
-----
------
-----
-----
------
-----
-----
-----
-----
------
-----
-----
------
-----
-----
-----.
--. 275
D.3 Sampl
Sample
e tabula
tabulatio
tion
n of labor
labor rates
rates for NCR -----
--------
-----
-----
------
-----
-----
-----
-----
------
-----
-----
------
-----
-----
------
-----
-----
-----
-----
----- 276
Program of Works
Works (POW)
_ - is the total estimated cost of the project which covers the Civil Works Cost,
Engine
Engineeri
ering
ng Superv
Supervisi
ision
on and
and Adminis
Administra
trativ
tive
e Overh
Overhead
ead,, Road
Road Right-
Right-of-
of-Way
Way Acquis
Acquisiti
ition
on Cost,
Cost,
Const
Constru
ructi
ction
on Contin
Contingen
gency,
cy, etc.
etc. The POW
POW shall
shall include
include infor
informa
matio
tion
n about
about the proje
project
ct locati
location
on
and
and limi
limits
ts,, quan
quanti
tity
ty and
and unit
unit cost
cost for
for each
each item
item of work
work,, cons
constr
truc
ucti
tion
on dura
durati
tion
on,, fund
fundin
ingg
source
source,, equipm
equipmen
entt requir
requirem
ement
ents,
s, etc.
etc.
Approved
Approved Budget
Budget for the Contract
Contract (ABC)
(ABC)
- is the
the tota
totall esti
estima
mate
ted
d agen
agency
cy esti
estima
mate
te (dir
(direc
ectt cost
cost,, indi
indire
rect
ct cost
cost and
and tax)
tax) for
for civi
civill
work
workss cont
contraract
ct of infras
infrastr
truc
uctu
ture
re proj
projec
ects
ts,, wher
wherei
ein
n it is the
the ceil
ceilin
ing
g of awar
awardd of cont
contra
ract
ct for
for
gover
governme
nmentnt locall
locally-f
y-fund
unded
ed proje
projects
cts and
and refer
referen
ence
ce for comparis
comparison on of bid costs
costs of contra
contracto
ctors
rs
for both
both locall
locally-f
y-fund
undeded and
and foreign
foreign-a
-assi
ssiste
sted d proje
projects
cts..
Oetailed
Oetailed Unit Price Analysis
Analysis (OUPA)
(OUPA)
- is the
the dete
determ
rmin
inat
atio
ion
n of reas
reason
onab
able
le unit
unit cost
cost of each item
item of work
work whic
which
h refl
reflec
ects
ts the
the
brea
breakdo
kdownwn showin
showing g the quanti
quantitie
ties
s of work
work items,
items, unit
unit price
prices
s of material
materials,
s, equip
equipmen
mentt renta
rentall
rates
rates,, labor
labor rates
rates and
and DPWH-p
DPWH-pre
rescr
scribe
ibed
d indire
indirect
ct costs
costs includ
including
ing taxes.
taxes.
Standard
Standard Labor Rates
Rates
.J
- are
are matr
matric
ices
es prep
preparared
ed and
and issu
issued
ed by Depa
Depart
rtme
ment
nt of Publ
Public
ic Work
Works
s and
and High
Highwa
ways
ys
(DPW
(DPWH) H) peri
period
odic
ical
ally
ly show
showin ing
g the
the requ
requir
ired
ed comp
compen
ensa
sati
tion
on for
for manp
manpow
ower
er work
workfo
forc
rce
e of
diff
differ
eren
entt cate
catego
gori
ries
es,, whic
whichh comp
compri
rise
ses
s the
the mini
minimu
mum
m wage
wage as app
appro
rove
ved
d by the
the NWPC
NWPC,, DOL
DOLE
E
plus
plus the monet
monetar
ary
y benefi
benefits.
ts.
ACEL
ACEL Guideb
Guidebook
ook 2014
2014
- is a guide
guidebo
book
ok wher
wheree rent
rental
al rate
rates
s of comm
common
only
ly used
used equip
equipme
ment
nt for
for infr
infras
astr
truc
uctu
ture
re
projec
projects
ts are based.
based. It is publ
publish
ished
ed by Assoc
Associat
iation
ion of Carrier
Carriers
s and
and Equipm
Equipment
ent Lessor
Lessors,
s, (ACEL)
(ACEL)
Inc..
Construct
Construction
ion Materials
Materials Price
Price Oata
Oata (CMPO)
- is a comp
compililat
atio
ion
n of unit
unit pric
prices
es of cons
constr
truc
ucti
tion
on mate
materirial
als
s upda
update
tedd quar
quarte
terl
rly
y per
per
Distri
District
ct Engine
Engineeri
ering
ng Office
Office to be used
used asas refer
referen
ence
ce in the
the pricin
pricing
g of materia
materials
ls compo
compone
nentnt of
the
the pay
pay item
items
s of work
work in the
the prep
prepar
arat
atio
ion
n of DUPA
DUPA,, ABC
ABC & POW,
POW, including
including new items
items .of work
work
.involv ed in a va.
.involved
DPWH Standard Specifications for Public Works and Highways
RC Reinforced Concrete
RCD Return Ceiling Diffuser
RCPC Reinforced Concrete Pipe Culvert
RLD Return Linear Diffuser
RO Regional Office
RPM Raised Pavement Markers
RSB Reinforcing Steel Bar
R_SC Rigid Steel Conduit
SCD Supply Ceiling Diffuser
SLD Supply Linear Diffuser
SPT Standard Penetration Test
SSS Social Security System
THHN Thermoplastic High Heat Nylon-coated
TW Thermoplastic Wire
TWHN Thermoplastic Water and Heat resitant
Nylon-coated
UPMO Unified Project Management Office
UPVC Unplasticized Polyvinyl Chloride
VO Variation Order
VRF Variable Refrigerant Flow
XLPE Cross-Linked Polyethylene
PREPARATION OF DETAILED UNIT PRICE ANALYSIS
1. General
a. Determine the scope of works based on approved plans and specification including
other requirements adopting the standard pay items of works per Department Order
No. 96, Series of 2016.
b. Calculate the quantity and cost of material component of every item of work based
on plans and specifications and prevailing prices of construction materials in the
Construction Materials Price Data (CMPD) with consideration of allowance for waste
and/or losses not to exceed 5% of the material's requirement.
c. Determine the appropriate quantity based on best norms and practices in the
construction industry and cost for manpower and equipment requirement to be used
based on Standard Labor Rates per Region and latest ACEL rates.
d. Determine the unit cost per item of work as presented in Item 5.
Forema n------------------------------------1
Skilled Worker (Mason, carpenter)----- 2
Unskilled Labor---------------------------- 6
The production output per hour of an item of work should be derived based on the
number of days and appropriate manpower and equipment utilized to complete the work
in accordance with the right construction methodology. In this manual, the production
output was derived by the Bureau of Construction (BOC) Engineers based on actual study
and best practices during the construction of BOC implemented projects.
Number of hours to complete the work which includes setting of equipment and
accessories, batching, delivery and pouring of concrete= 6 hours and 21 minutes
(6.85 hr)
The percentages of OCM, Profit and VAT to be applied to the estimated direct cost (i.e.
cost of material, labor and equipment rental) should be based on Department Order
(DO) No. 197, Series of 2016 (Guidelines in the Preparation of Approved Budget for the
Contract) or latest issuance.
A. Labor
Name and Capacity No of Unit/s No. of HourIs Hourly Rate Amount (PhPI
B. Equipment
F. Materials
.J
SECTION B
.J
B.1 SUMMARYTABLEOF ITEMSOFWORKAND DESCRIPTION
PART A EARTHWORKS
2
800( 1) Clearing and Grubbing (m ) 23
I-
800(2) Clearing and Grubbing (I.s.) 24
A. labor
Sub
Sub - Tot
Total
al for
for A
.
Name
Name and Capaci
Capacity
ty No of Unitls No. of HourIs Hourly
Hourly Rate
Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
a. Concre
Concrete
te Vibrat
Vibrator
or 2 1.
1.00 See latest
latest ACEL rental
rental rates.
rates.
b. Pumpcrete
Pumpcrete 1 0.27
Mino
Minorr Tool
Tools
s (10%
(10% of lab
labor
or Cost
Cost))
Sub
Sub - Tot
Total
al for
for B
C. Total (A + B)
Total
D. Outp
Output
ut per
per Hour
Hour = 3.72 m3
3.72
E. Dire
Direct
ct Unit
Unit Cost (C + D)
F. Materials
a. Ready
Ready Mix,
Mix, Class
Class AAlClas
AAlClass
s B/Class C/Class P, 7 Prices
Prices of materials
materials are variable
variable per Regionl
Regionl
3
days/14
days/14 daysl 28 days m 1.05 District
District based
based on the prevailin
prevailing
g unit
unit prices
prices in
the locality
locality which include
include payment of local
taxes
taxes and hauling
hauling cost to the project
project site.
Refer to the Construction
Construction Material
Material Price Data
establish
established
ed quarterly
quarterly by Central
Central Office
Office Price
Monitoring Committee.
Sub
Sub - Tot
Total
al for
for F
G. Direct
Direct Unit Cost (E + F)
Unit Cost
H. Overhe
Overhead,
ad, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contr
Contract
actor'
or's
s Profit
Profit (CP) 10%/8% ofG
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Tota
Totall Unit
Unit Cost
Cost (G + H + I + J)
Note:
Note: 1. This
This cost
cost sheet
sheet shall
shall be used
used for concr
concrete
ete pourin
pouring
g by pump
pumpcre
crete.
te. Item
Item Nos.
Nos. 900(1
900(1 )a1,
)a1, 900(1
900(1 )b1,
)b1, 900(1
900(1 )c1,
)c1, 900(2)a
900(2)a,,
900(2)
900(2)b,
b, 900(2)
900(2)c,
c, 900(3)
900(3)a,
a, 900(3)
900(3)b,
b, 900(3)
900(3)c,
c, 900(4)
900(4)a,
a, 900(4)
900(4)b,
b, 900(4)
900(4)c,
c, 900(5)
900(5) and 900(6
900(6)) shall
shall used this
this cost sheet
sheet..
DETAILE
DETAILED
D UNIT
UNIT PRICE
PRICE ANALYSIS
ANALYSIS (DUPA)
(DUPA)
A. Labor
Sub
Sub - Tota
Totall for
for A
Name
Name and Capaci
Capacity
ty No of Unitls No. of HourIs Hourly Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
.f
Sub
Sub - Tot
Total
al for
for B
C. Total (A + B)
=
3
D. Output
Output per Hour
Hour 3.32
3.32 m
E. Dire
Direct
ct Unit
Unit Cost (C + D)
F. Materials
Materials
a. Read
Ready
y Mix
Mix Concr
Concret
ete,
e, 7 days/14 days 3
1.05 Prices of material
materials
s are variable
variable per Region/
Region/
m
District
District based
based on the prevailing
prevailing unit prices
prices in
the locality which include payment of local
taxes
taxes and hauling
hauling cost to the project
project site.
site.
Refer to the Construction
Construction Material
Material Price Data
establish
established
ed quarterly
quarterly by Central
Central Office
Office Price
Monitoring Committee.
Sub
Sub - Tota
Totall F
G. Dir
Direc
ectt Unit
Unit Cost (E + F)
H. Overhe
Overhead,
ad, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Cont
Contrac
ractor
tor's
's Profit
Profit (CP) 10%/8% ofG
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Tota
Totall Unit
Unit Cost
Cost (G + H + I + J)
Note
Note:: 1. This
This cost
cost sheet
sheet shal
shalll be use
used
d for
for concr
concret
etin
ing
g foot
footin
ings
gs and
and slab on fill
fill by usin
using
g read
ready
y mix
mix conc
concre
rete
te and
and manu
manual
al pour
pourin
ing
g of
concre
concrete
te applic
applicabl
able
e for Item
Item Nos.
Nos. 900(1
900(1 )b2
)b2 and
and 900(1
900(1 )c2.
)c2.
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANALYSI
ANALYSIS
S (DUPA)
(DUPA)
A. Labor
B. Equipment
a. Concrete Vibrator
Vibrator 2 1.00 See latest
latest ACEL rental
rental rates.
rates.
Minor Tools (10% of Labor Cost)
,J
F. Materials
Materials
Sub - Total F
G. Direct Unit Cost (E + F)
H. Overhead,
Overhead, Contingenc
Contingencies
ies & Miscellaneous
Miscellaneous (OCM) Expenses
Expenses 15%/12%/10%/8% of G
I. Contractor's
Contractor's Profit (CP) 10%/8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
Note: 1. This cost sheet
sheet shall be used for
for concreting
concreting footing
footing tie beam, column,
column, suspende
suspended
d slab, girderlbea
girderlbeam
m by using
using ready mix
mix
concrete
concrete and manual
manual pouring
pouring of concrete applicable
applicable for Item Nos. 900(1)a3,
900(1)a3, 900(1)a4, 900(1)a5,
900(1)a5, 900(1)a6,
900(1)a6, 900(1)b3,
900(1)b4, 900(1)b5, and 900(1)b6.
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANAL
ANALYSIS
YSIS (DUPA)
(DUPA)
A. labor
Sub
Sub - Tot
Total
al for
for A
Name
Name and Capaci
Capacity
ty No of Unitls No. of Houris Hourly Rate Amount (PhP)
B. Equipment
a. One
One Bagger
Bagger Mixer
Mixer 1 1.
1 .00 See latest
latest ACEL rental
rental rates.
rates.
Mino
Minorr Tool
Tools
s (10%
(10% of labo
laborr Cost
Cost))
Sub
Sub - Tot
Total
al for
for B 0.00
C. Total (A + B) 0.00
3
D. Outp
Output
ut per
per Hour = 0.35
0.357
7 m
E. Dire
Direct
ct Unit
Unit Cost
Cost (C + D)
F. Materials
3 Prices
Prices of materials
materials are variable
variable per Region/
Region/
a. Gravel
Gravel m 1.00
District
District based
based on the prevaili
prevailing
ng unit prices
prices in
b.Sand m3 0.50 the locality
locality which include
include payment
payment of local
c. Portla
Portland
nd Cement
Cement bags 9.10 taxes and hauling
hauling cost to the project
project site.
Refer to the Construction
Construction Material
Material Price Data
establish
established
ed quarterly
quarterly by Central
Central Office
Office Price
Monitoring Committee.
Sub
Sub - Tot
Total
al for
for F
G. Dir
Direc
ectt Unit
Unit Cost
Cost (E + F)
H. Overhe
Overhead,
ad, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Cont
Contrac
ractor
tor's
's Profit
Profit (CP) 10%1 8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Tota
Totall Unit
Unit Cost
Cost (G + H + I + J)
Note
Note:: 1. This
This cost
cost sheet
sheet shal
shalll be use
used
d for
for concr
concret
etin
ing
g foot
footin
ings
gs and
and slab
slab on fil
filll by usi
using
ng manu
manual
al mixi
mixing
ng and
and manu
manual
al pour
pourin
ing
g of
concrete.
DETAILE
DETAILED
D UNIT
UNIT PRICE
PRICE ANALYSI
ANALYSIS
S (DUPA)
(DUPA)
Unit of Measuremen
Measurementt
Output
Output per hour
hour
A. labor
-
Labor Rates are variable per Region/District
a. Const
Construc
ructio
tion
n Forema
Foreman
n 1 1.00
based
based on minimum
minimum wage as approved
approved by
b. Skilled
Skilled laborer
laborer 1 1.00 DOLE. Refer to the Schedule of Labor Rates.
b. Unskilled laborer 4 1.00
Sub
Sub - Tot
Total
al for
for A
Name
Name and Capaci
Capacity
ty No of Unitls No. of Hour/s Hourly Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
Sub
Sub - Tot
Total
al for
for B .
C. Total (A + B)
D. Outp
Output
ut per
per Hour
Hour = 0.270 m3
0.270
E. Dire
Direct
ct Unit Cost (C + D)
Unit Cost
F. Materials
Materials
3 Prices of materials
materials are variable
variable per Region/
a. Gravel
Gravel m 1.00
District
District based
based on the prevaili
prevailing
ng unit prices
prices in
3
b. Sand m 0.50 the locality which include payment of local
c. Portlan
Portland
d Cement
Cement bags 9.
9.10 taxes
taxes and hauling
hauling cost to the project
project site.
site.
Refer to the Construct
Construction
ion Material
Material Price Data
establish
established
ed quarterly
quarterly by Central
Central Office Price
Monitoring Committee.
Sub
Sub - Tot
Total
al for
for F
G. Dir
Direc
ectt Unit
Unit Cost
Cost (E + F)
H. Overhe
Overhead,
ad, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OCM)
(OCM) Expens
Expenses
es 15%/
15%/12
12%/
%/10
10%/
%/8%
8% of G
I. Cont
Contrac
ractor
tor's
's Profit
Profit (CP) 10%/
10%/ 8% of G
J. Value
Value Added
Added TaxTax (VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
Note
Note:: 1. This
This cost
cost sheet
sheet shal
shalll be use
used
d for
for conc
concre
reti
ting
ng foot
footin
ing
g tie
tie beam,
beam, colu
column
mn,, susp
suspen
ende
ded
d slab
slab,, and
and girde
girder/
r/be
beam
am by usin
using
g manu
manual
al
mixing
mixing and manual
manual pourin
pouring
g of concr
concrete
ete applic
applicabl
able
e for Item Nos. 900(1
900(1 )c3,
)c3, 900(1
900(1 )c4,
)c4, 900(1 )c5 and
and 900(1
900(1 )c6.
)c6. Ideally,
Ideally, this
this
cost
cost sheet
sheet shall
shall be used
used for one-s
one-stor
torey
ey to two-
two-sto
storey
rey buildi
buildings
ngs involv
involving
ing one to two span
spans
s in remote
remote areas.
areas.
DETAILED UNIT PRICE ANALYSIS (DUPA)
A. Labor
Name and Capacity No of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
.J
C. Total (A + B)
3
D. Output per Hour = 3.72 m
E. Direct Unit Cost (C + D)
F. Materials
A. Labor
Name and Capacity No of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
F. Materials
Item No./Description 902(1) Reinforcing Steel of Reinforced Concrete Structures for One-Storey, Grade 40/Grade 60
Unit of Measurement kg
Output per hour 143.438 kg
A. La bor
Name and Capacity No of Unit/s No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
.J
F. Materials
a. Deformed Reinforcing Steel kg 1.00 Prices of materials are variable per Regionl
District based on the prevailing unit prices in
b. #16 Galvanized Iron Wire kg 0.015 the locality which include payment of local
c. Consumables (5% of Materials Cost) taxes and hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
Item No./Description 902( 1) Reinforcing Steel of Reinforced Concrete Structures for Two upto Five Storey
Unit of Measurement kg
Output per hour 129.094 kg
A. Labor
Name and Capacity No of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
.J
F. Materials
Item No./Description 903(2) Formworks and Falseworks (for two to five-storey building)
2
Unit of Measurement m
2
Output per hour 4.5 m
A. Labor
Installation
a. Construction Foreman 1 1.00 Labor Rates are variable per Region/District
based on minimum wage as approved by
b. Skilled Laborer 4 1.00
DOLE. Refer to the Schedule of Labor Rates.
c. Unskilled Laborer 6 1.00
Stripping
a. Construction Foreman 1 0.56
b. Unskilled Laborer 6 0.56
Sub - Total for A
Name and Capacity Quantity No. of Dayls Daily Rental Rate Amount (PhP)
B. Equipment
Area = 205.01 m
2
a. H-Frame 1.7 m x 1.2m, set 40 14.00 Rental cost for scaffoldings may vary per
RegionlDistrict.
2 pes H-frames
4 pcs diagonal cross braces
4 pcs horizontal braces
8 pcs joint pins
b. Shoring Jack, 3.8 m full extension 62 14.00
c. Adjustable U-head Jack, 0.6m 80 14.00
d. Adjustable Base Jack, 0.6m 80 14.00
e. 1-1/2" GI Pipe x 6.0 m 62 14.00
f. 1-1/2" GI Pipe x 3.0 m 16 14.00
g. 1-1/2" GI Pipe x 4.0 m 32 14.00
h. 1-1/2" GI Pipe x 1.0 m 216 14.00
i. Tie Rod x 0.60m 278 14.00 .J
F. Materials
Prices of materials are variable per Regionl
District based on the prevailing unit prices in
a. Phenolic Board (0.019 x 1.2 x 2.4) - 5 uses pc 0.347 the locality which include payment of local
c. Good Lumber - 3 uses bd ft 4.727 taxes and hauling cost to the project site.
Refer to the Construction Material Price Data
b. Consumables (5% of Materials Cost)
established quarterly by Central Office Price
Monitoring Committee.
A. Labor
-
Installation
a. Construction Foreman 1 1.00 Labor Rates are variable per Region/District
b. Skilled Laborer based on minimum wage as approved by
2 1.00
DOLE. Refer to the Schedule of Labor Rates.
c. Unskilled Laborer 4 1.00
Stripping
a. Construction Foreman 1 0.41
b. Unskilled Laborer 6 0.41
Sub - Total for A
Name and Capacity Quantity No. of Dayls Daily Rental Rate Amount (PhP)
B. Equipment
.J
F. Materials
A. Labor
Name and Capacity No of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
.J
F. Materials
A. Labor
Name and Capacity No of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
.J
F. Materials
a.13 mm 0 - 50 mm 0 Galvanized Iron Pipe pc 1.00 Prices of materials are variable per Regionl
District based on the prevailing unit prices in
b. Consumables (5% of Materials Cost)
the locality which include payment of local
taxes and hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
A Labor
Name and Capacity No of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
.J
F. Materials
a. 65 mm 0 - 150 mm 0x 6 m Galvanized Iron Pipe pc 1.00 Prices of materials are variable per Region/
District based on the prevailing unit prices in
b. Consumables (5% of Materials Cost)
the locality which include payment of local
taxes and hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
A Labor
Name and Capacity No of Unit/s No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
.J
F. Materials
a. Galvanized Iron Fittings (Elbowl Teel Reducer-Teel pc 1.00 Prices of materials are variable per Region/
District based on the prevailing unit prices in
Socket! Couplingl Reducer Coupling)
the locality which include payment of local
taxes and hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
Item No.lDescription 1002(3)a 13 mm 0 - 50 mm 0 Polyprophylene Random Copolymer (PPR-C) Pipe, PN 101 PN 161 PN 20
Unit of Measurement pc
Output 1 pc
A. Labor
Name and Capacity No of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
.J
F. Materials
Item No.lDescription 1002(3)a 63 m m ¢ -100 mm ¢ Polyprophylene Random Copolymer (PPR-C) Pipe PN 101 PN 161 PN 20
Unit of Measurement pc
Output 1 pc
A. Labor
Name and Capacity No of Unit/s No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
.J
F. Materials
A. Labor
Name and Capacity No of Unitls No. of Houris Hourly Rate Amount (PhP)
B. Equipment
.J
F. Materials
a. Polyprophylene Random Copolymer (PPR-C) pc 1.00 Prices of materials are variable per Regionl
District based on the prevailing unit prices in
Fittings (Elbowl Tee/ Female Threaded Tee/ Female
the locality which include payment of local
Elbow/ Female Threaded Adaptorl Male Threaded taxes and hauling cost to the project site.
Adaptorl End Cap) Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
A. Labor
-
1.00 Labor Rates are variable per Region/District
a. Construction Foreman 1
based on minimum wage as approved by
b. Skilled Laborer 1 1.00
DOLE. Refer to the Schedule of Labor Rates.
c. Unskilled Laborer 2 1.00
Name and Capacity No of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
.J
F. Materials
Item No./Description 1002(5) Kitchen Sink/Scrub Up Sink/Slop Sink with Complete Accessories
Unit of Measurement set
Output 1 set
A. Labor
Name and Capacity No of Unitls No. of Houris Hourly Rate Amount (PhP)
B. Equipment
F. Materials
a. Kitchen Sink/Scrub Up Sink/Slop Sink with Prices of materials are variable per Region/
set 1.00 District based on the prevailing unit prices in
complete accessories
the locality which include payment of local
b. Consumables (5% of Materials Cost) taxes and hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
Item No.lDescription 1002(5) Wall Hung/Countertop/Under Counter Lavatory with Complete Accessories
Unit of Measurement set
Output 1 set
A. Labor
Name and Capacity No of Unit/s No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
.J
F. Materials
a. Lavatory (Wall Hung/Countertop/Under Counter) set 1.00 Prices of materials are variable per Region/
District based on the prevailing unit prices in
b. Consumables (5% of Materials Cost)
the locality which include payment of local
taxes and hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
A. Labor
Name and Capacity No of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
.J
F. Materials
a. Floor Drain Plate set 1.00 Prices of materials are variable per Regionl
District based on the prevailing unit prices in
b. Consumables (5% of Materials Cost)
the locality which include payment of local
taxes and hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
A Labor
Name and Capacity No of Unit/s No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
.J
F. Materials
a. Soap Holder (Toilet Soapl Liquid Soap) set 1.00 Prices of materials are variable per Region/
District based on the prevailing unit prices in
b. Consumables (5% of Materials Cost)
the locality which include payment of local
taxes and hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
A. Labor
Name and Capacity No of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
F. Materials
a. Toilet Tissue Holder/Dispenser set 1.00 Prices of materials are variable per Region/
District based on the prevailing unit prices in
b. Consumables (5% of Materials Cost)
the locality which include payment of local
taxes and hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
A. Labor
Name and Capacity No of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
.J
F. Materials
a. Bidet! Faucet! Hose Bibb set 1.00 Prices of materials are variable per Region/
District based on the prevailing unit prices in
b. Consumables (5% of Materials Cost)
the locality which include payment of local
taxes and hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
A. Labor
Name and Capacity No of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
.J
F. Materials
a. 40 mm 1IlStainless Steel Grab Bar 1.00 Prices of materials are variable per Region/
m
District based on the prevailing unit prices in
b. Consumables (5% of Materials Cost) the locality which include payment of local
taxes and hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
A Labor
Name and Capacity No of Unit/s No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
.J
F. Materials
a. Steell Aluminum Roll Up Door Set 1.00 Prices of materials are variable per Region/
District based on the prevailing unit prices in
b. Consumables (3% of Materials Cost)
the locality which include payment of local
taxes and hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
A. Labor
B. Equipment
.J
F. Materials
A. Labor
-
a. Construction Foreman 1 1.00 Labor Rates are variable per Region/District
b. Skilled Laborer 1 1.00 based on minimum wage as approved by
c. Unskilled Laborer 1 1.00 DOLE. Refer to the Schedule of Labor Rates.
Name and Capacity No of Unitls No. of HourIs Hourly Rate Amount (PhP)
.
B. Equipment
F. Materials
A. Labor
Name and Capacity No. of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
F. Materials
Item No./Description 1013(2) Fabricated Metal Roofing Accessory (Ridge/Hip Rolls/Flashings/Counter FlashingNalley Roll)
Unit of Measurement m
Output per hour 10.00 m
Designation No. of Pers on/s No. of Hour /s Hourly Rate Amount (PhP)
A. Labor
Name and Capacity No. of Unitls No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
.J
F. Materials
A. Labor
Name and Capacity No. of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
F. Materials
a. Gutter (0.6 mm) m 1.00 Prices of materials are variable per Region/
District based on the prevailing unit prices in
b. 12" x 1" Plain GI Strap pc 3.00
the locality which include payment of local
c. Blind Rivets pc 16.00 taxes and hauling cost to the project site.
d. Consumables (3% of Materials Cost) Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
Item No./Description 1014 Prepainted Metal Sheets (Corrugated, Short Spanl Long Span, below 0.427 thkl above 0.427 thk)
2
Unit of Measurement m
2
Output per hour 2.076 m
A. Labor
Name and Capacity No. of Unitls No. of Houris Hourly Rate Amount (PhP)
B. Equipment
.J
F. Materials
A. Labor-
B. Equipment
.J
F. Materials
A. labor-
Name and Capacity No. of Unitls N o. of H ouris Hourly Rate Amount (PhP)
B. Equipment
F. Materials
a. Primer Coat gal 0.04 Prices of materials are variable per Region/
District based on the prevailing unit prices in
b. Liquid Waterproofing gal 0.03 the locality which include payment of local
c. Consumables (3% of Materials Cost) taxes and hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
A. Labor -
Name and Capacity No. of Unitls No. of Houris Hourly Rate Amount (PhP)
B. Equipment
.J
F. Materials
Item No./Description 1017 50mm (11 - lOOmm (11 Roof Drain/Canopy Drain/ Gutter Drain with Strainer
Unit of Measurement set
Output 1 set
A. Labor -
Name and Capacity No. of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
.J
F. Materials
a. 50mm I1l - 100mm I1l Roof Drain/Canop Drain/ Prices of materials are variable per Region/
set 1.00 District based on the prevailing unit prices in
Gutter Drain with Strainer
the locality which include payment of local
taxes and hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
A. Labor
Name and Capacity No. of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
.J
F. Materials
Item No./Description 1018 Unglazed Tilesl Granite Tilesl Synthetic Granite Tiles
2
Unit of Measurement m
Output per hour 1.95 m2
A. labor-
Name and Capacity No. of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
F. Materials
a. Unglazed Tilesl Granite Tilesl Synthetic Granite 2 Prices of materials are variable per Regionl
m 1.050
District based on the prevailing unit prices in
b. Cement bag 0.325 the locality which include payment of local
3
c. Sand m 0.026 taxes and hauling cost to the project site.
Refer to the Construction Material Price Data
d. Tile Grout bag 0.125
established quarterly by Central Office Price
Monitoring Committee.
A. labor-
Name and Capacity No. of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
.J
F. Materials
A. Labor
Sub
Sub - Tota
Totall for
for A
Name
Name and Capaci
Capacity
ty No. of Unitls No. of HourIs Hourly Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
,J
Sub
Sub - Tot
Total
al for
for B
C. Total (A + B)
D. Output
Output = 1 pc
E. Dire
Direct
ct Unit
Unit Cost
Cost (C + D )
F. Materials
a. Sagro
Sagrod
d with
with nuts
nuts and bolts pc 1.00 Prices
Prices of materials
materials are variable
variable per Region/
Region/
District
District based on the prevailin
prevailing
g unit price
prices
s in
the locality
locality which include
include payment of local
local
taxes
taxes and hauling
hauling cost to the project site.
site.
Refer to the Construct
Construction
ion Material
Material Price Data
establish
established
ed quarterly
quarterly by Central
Central Office
Office Price
Monitoring Committee.
Sub
Sub - Tot
Total
al for
for F
G. Dir
Direc
ectt Unit
Unit Cost
Cost (E + F)
H. Overhead,
Overhead, Contingen
Contingencies
cies & Miscel
Miscellan
laneou
eous
s (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Cont
Contra
ract
ctor
or's
's Prof
Profit
it (CP) 10%/8% of G
J. Value
Value Adde
Added
d Tax
Tax (VAT)
(VAT) 5% of (G + H + I)
K. Tota
Totall Unit
Unit Cost
Cost (G + H + I + J)
DETAIL
DETAILED
ED UNIT
UNIT PRICE
PRICE ANALYSIS
ANALYSIS (DUPA)
(DUPA)
Item No.lDescri
No.lDescription
ption 1047(3
1047(3)c
)c Metal
Metal Stru
Structu
cture
re Access
Accessori
ories
es (Turnb
(Turnbuck
uckle)
le)
Unit of Measureme
Measurement
nt pc
Output
Output per hour
hour 1 pc
A. Labor
Sub
Sub - Tota
Totall for
for A
Name
Name and Capaci
Capacity
ty No. of Unitls No. of HourIs Hourly
Hourly Rate
Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - Tot
Total
al for
for B
C. Total (A + B)
D. Output
Output = 1 pc
E. Direct
Direct Unit
Unit Cost
Cost (C + D)
F. Materials
a. Standar
Standard
d Turnbuckle
Turnbuckle pc 1.00 Prices
Prices of materials
materials are variable
variable per Region/
Region/
District
District based on the prevailin
prevailing
g unit price
prices
s in
the locality
locality which include
include payment of local
taxes
taxes and hauling
hauling cost to the project
project site.
site.
Refer to the Construct
Construction
ion Material
Material Price Data
establish
established
ed quarterly
quarterly by Central Office
Office Price
Monitoring Committee.
Sub
Sub - Tot
Total
al for
for F
G. Direc
Directt Unit
Unit Cost
Cost (E + F)
H. Overhe
Overhead,
ad, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% ofG
I. Cont
Contrac
ractor
tor's
's Profit
Profit (CP) 10%/8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
DETAILE
DETAILED
D UNIT
UNIT PRICE
PRICE ANALYSI
ANALYSIS
S (DUPA)
(DUPA)
B. Equipment
.J
F. Materials
Materials
A. Labor-
Sub
Sub - Tota
Totall for
for A
Name
Name and Capaci
Capacity
ty No. of UniUs No. of HourIs Hourly Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
Sub
Sub - Tot
Total
al for
for B
C. Tota
Totall (A + B)
D. Outp
Output
ut per
per Hour
Hour = 12.995
12.995 kg
E. Dire
Direct
ct Unit
Unit Cost (C + D)
F. Materi
Materials
als
a. Cross
Cross Bracin
Bracing
g kg 1.05 Prices
Prices of materials
materials are variable
variable per Region/
Region/
District
District based
based on the prevailing
prevailing unit prices
prices in
b. Consum
Consumabl
ables
es (3% of Materi
Material
al Cost)
Cost)
the locality
locality which include
include payment of local
local
taxes
taxes and hauling
hauling cost to the project
project site.
site.
Refer to the Construct
Construction
ion Material
Material Price Data
establish
established
ed quarterl
quarterly
y by Central Office Price
Monitoring Committee.
Sub
Sub - Tot
Total
al for
for F
G. Dir
Direc
ectt Unit
Unit Cost
Cost (E + F)
H. Overhe
Overhead,
ad, Contin
Contingen
gencie
cies
s & Miscel
Miscellan
laneou
eous
s (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contr
Contract
actor'
or's
s Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Adde
Added
d Tax
Tax (VAT)
(VAT) 5% of (G + H + I)
K. Tota
Totall Unit
Unit Cost
Cost (G + H + I + J)
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANALYS
ANALYSIS
IS (DUPA)
(DUPA)
A. Labor -
Sub
Sub - Tota
Totall for
for A
Name
Name and Capaci
Capacity
ty No. of Unitls
Unitls No. of HourIs Hourly Rate Amoun
Amountt (PhP
(PhP))
B. Equipment
Mino
Minorr Tool
Tools
s (10%
(10% of Labo
Laborr Cost
Cost))
.J
Sub
Sub - Tot
Total
al for
for B
C. Total (A + B)
D. Outp
Output
ut per Hour = 12.995
12.995 kg
E. Direct
Direct Unit
Unit Cost (C + D)
F. Materials
Materials
a. Steel
Steel Plates
Plates kg 1.05 Prices
Prices of materials
materials are variable
variable per Region/
Region/
District
District based
based on the prevailin
prevailing
g unit prices
prices in
b. Consum
Consumabl
ables
es (3% of Materi
Materials
als Cost)
Cost) the locality
locality which include
include payment
payment of local
local
taxes
taxes and hauling
hauling cost to the project
project site.
Refer to the Construction
Construction Material
Material Price Data
establish
established
ed quarterly
quarterly by Central
Central Office
Office Price
Monitoring Committee.
Sub
Sub - Tot
Total
al for
for F
G. Dir
Direc
ectt Unit
Unit Cost (E + F)
H. Overhe
Overhead,
ad, Contingen
Contingencies
cies & Miscel
Miscellan
laneou
eous
s (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contr
Contract
actor'
or's
s Profit
Profit (CP) 10%/8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
DETAILED UNIT PRICE ANALYSIS (DUPA)
A. labor
Name and Capacity No. of Unit/s No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
Surface Preparation
a. Portable Grinder 2 0.40 See latest ACEL rental rates.
b. Jack Hammer 1 0.20
c. Air Compressor 1 0.40
c. Speed Ventilator 1 0.40
d. Electric Drill 1 0.20
e. Chipping Gun 1 0.10
f. Paddle Mixer 1 0.20
g. Generator Set (20KVA) 1 0.10
Application
a.Saturator Machine 1 0.10
b. Generator Set (20 KVA) 1 0.10 .J
F. Materials
A. Labor
Name and Capacity No. of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
Surface Preparation
a. Portable Grinder 2 0.40 See latest ACEL rental rates.
b. Jack Hammer 1 0.20
c. Air Compressor 1 0.40
c. Speed Ventilator 1 0.40
d. Electric Drill 1 0.20
e. Chipping Gun 1 0.10
f. Paddle Mixer 1 0.20
g. Generator Set (20KVA) 1 0.10
Application
.J
a.Saturator Machine 1 0.10
b. Generator Set (20 KVA) 1 0.10
F. Materials
Designation No. of P ers on/s No. of HourIs Hourl y Rate Amount (PhP)
A. Labor
Name and Capacity No. of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
.J
F. Materials
a. Portland Cement bags 14.00 Prices of materials are variable per Region/
District based on the prevailing unit prices in
b. Additives L 3.50 the locality which include payment of local
c. Consumables (5% of Material Cost) taxes and hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
A. Labor -
Name and Capacity No. of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
a. Truck Mounted Crane (41 - 45 mt) 1 1.00 See latest AGEL rental rates.
(Unloading and Stockpiling)
Minor Tools (10% of Labor Cost)
.J
F. Materials
a. Untreated Timber (375 mm (II average) bd-ft 48.30 Prices of materials are variable per Region/
b. Miscellaneous (5% of Materials Cost) District based on the prevailing unit prices in
the locality which include payment of local
taxes and hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Note: Monitoring Committee.
Assumed average minimum diameter is 375 mm
for less than 12 m length. For beyond 12 m length and
bigger diameter, adjust the quantity in bd-ft accordingly.
A. Labor
-
Labor Rates are variable per Region/District
a. Construction Foreman 1 1.00
based on minimum wage as approved by
b. Unskilled Laborer 4 1.00 DOLE. Refer to the Schedule of Labor Rates.
Name and Capacity No. of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
a. Truck Mounted Crane (41 - 45 mt) 1 1.00 See latest ACEL rental rates.
(Unloading and Stockpiling)
Minor Tools (10% of labor cost)
F. Materials
a. Treated Timber (375 mm ¢ average) bd-ft 48.30 Prices of materials are variable per Region/
District based on the prevailing unit prices in
b. Miscellaneous (3% of Materials Cost)
the locality which include payment of local
taxes and hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Note:
Monitoring Committee.
Assumed average minimum diameter is 375 mm
for less than 12 m length. For beyond 12 m length and
bigger diameter, adjust the quantity in bd-ft accordingly.
A. Labor
a. Constructi
Construction
on Foreman
Foreman 1 1.
1.00 Labor
Labor Rates
Rates are variabl
variable
e per Region/
Region/Dis
Distri
trict
ct
based
based on mini
minimu
mum wage as appro
m wage approve
ved
d by
b. Skilled
Skilled Laborer
Laborer 4 1.00
DOLE.
DOLE. Refer
Refer to the
the Schedu le of Labor
Schedule Labor Rates.
Rates.
c. Unskille
Unskilled
d Laborer
Laborer 8 1.00
Sub - Total
Total for A
Name
Name and Capacity
Capacity No. of Unitls
Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
a. Payl
Payloa
oade
derr (1.5
(1.50
0 m\ LX80
LX80-2
-2C
C 1 0.03 See
See late
latest
st ACEL
ACEL renta
rentall rate
rates.
s.
b. Concret
Concrete
e Vibrator
Vibrator 1 0.10
c. Plate
Plate Compac
Compactor
tor (5 hp),
hp), for Castin
Casting
g Bed 1 0.03
d. Bar Cutter
Cutter 1 0.22
e. Bar Bender
Bender 1 0.22
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
Sub - Total
Total for B
C. Total (A + B)
Total J
D. Outp
Output
ut per
per Hour
Hour = 2.30m
E. Direct
Direct Unit
Unit Cost
Cost (C + D)
F. Materials
a. Reinf
Reinforc
orcing
ing Steel
Steel Bar kg 41.64 Prices of materia
materials
ls are variable
variable per Region!
Region!
3 Dist
Distri
rict
ct based
based on the the prev
prevai
ailin
ling
g unit
unit pric
prices
es in
b. Ready
Ready Mix Concr
Concrete
ete,, fc'=27
fc'=27.60
.60 Mpa @28 days'
days' m 0.18
the local
locality
ity which
which includ
include payment of local
e payment
Plywood, 1/2" x 4' x 8' - 4 uses
c. Plywood, pc 0.24 taxe
taxess and
and hauli
hauling
ng cost
cost to the
the proje
project
ct site
site..
f. Good
Good Lumber
Lumber - 4 uses
uses bd-ft 12
12.40 Refer
Refer to the Constr
Construct
uction
ion Materia
Materiall Price
Price Data
Data
g. #16
#16 GI Tie
Tie Wire
Wire (2%
(2% of RSB) kg 0.83 establ
establish
ished
ed quarter
quarterly
ly by Central
Central Office
Office Price
Price
Monitoring
Monitoring Committee.
Committee.
h. Assort
Assorted
ed CWN (1 kg/10
kg/100
0 bd-ft
bd-ft of Lumber)
Lumber) kg 0.12
Castin
Casting
g Bed
a. Ready
Ready Mix Concret
Concrete,
e, Class
Class B m3 0.037
d. Good Lumber - 4 uses bd-ft 1.00
e. Base Course
Course m3 0.08
Note:
'If
'If no availa
available
ble Ready
Ready Mix
Mix Conc
Concret
rete
e at proje
project
ct site
site,,
derive cost of concre
derive the cost concrete
te using
using the Batch
Batching Plant or
ing Plant
One Bagger
Bagger Mixer
Mixer for small
small quantit
quantities
ies..
Sub
Sub - Tota
Totall for
for F
G. Direc
Directt Unit
Unit Cost (E + F)
H. Overh
Overhead
ead,, Contin
Contingen
gencie
cies
s & Misc
Miscell
ellane
aneous
ous (OCM)
(OCM) Expens
Expenses
es 15%/
15%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contrac
Contractor's
tor's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANALYSI
ANALYSIS
S (DUPA)
(DUPA)
A. Labor
Sub - Total
Total for A
Name
Name and Capaci
Capacity
ty No. of Unitls No. of HourIs Hourly Rate Amount
Amount (PhP)
(PhP)
B. Equipment
,J
Sub
Sub - Tot
Total
al for
for B
C. Total (A + B)
D. Outp
Output
ut per Hour =
per Hour 3.00m
E. Direct
Direct Unit
Unit Cost (C + D)
F. Materials
Materials
a. Coco
Coco Log - 2 uses
uses m 1.00 Prices
Prices of materia
materials
ls are variab
variable
le per
per Regionl
Regionl
Dist
Distric
rictt base
basedd on thethe prev
prevai
ailin
ling
g unit
unit pric
prices
es in
b. Good Lumber (Falsework) - 4 uses bd-ft 16.00
the loca
localit
lity
y which
which includ
includee payment
payment of locallocal
c. NaillS
NaillSpik
pike
e (1 kg/100 bd-ft of Lumber) kg 0.16 taxe
taxess and
and hauli
hauling
ng cost
cost to the
the proje
project
ct site
site..
Miscel
Miscellan
laneou
eous
s (2% of Mater
Material
ials
s Cost)
Cost) Refer
Refer to the Constru
Constructi
ction
on Materia
Materiall Price
Price Data
Data
establ
establishe
ished d quarter
quarterly
ly by Cent
Central
ral Office
Office Price
Price
Monitoring
Monitoring Committee,
Committee,
Sub
Sub - Tota
Totall for
for F
G. Direc
Directt Unit
Unit Cost (E + F)
H. Overhead,
Overhead, Contingen
Contingencies
cies & Miscellan
Miscellaneous
eous (OCM) Expenses 15%/12%/10%/8% ofG
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANALYSIS
ANALYSIS (DUPA)
(DUPA)
A. Labor
Sub
Sub - Tota
Totall for
for A
Name
Name and Capaci
Capacity
ty No. of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
a. Truc
Truck
k Mounte
Mounted
d Crane
Crane (41 - 45 mt) 1 0.58 See
See late
latest
st AGEL
AGEL renta
rentall rate
rates.
s.
b. Drop Hammer
Hammer 1 0.13
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
Sub
Sub - Tota
Totall for
for B ,
C. Total (A + B)
D. Output
Output per Hour
Hour = 3.00m
E. Direct
Direct Unit
Unit Cost
Cost (C + D)
F. Materials
Materials
a. Coco
Coco Log - 2 uses
uses m 1.00 Prices
Prices ofof materia
materials
ls are variabl
variable
e per Regionl
Regionl
b. Good Lumber (Falsework) - 4 uses bd-ft 16.00 Dist
Distri
rict
ct based
based on the the preva
prevail
iling
ing unit
unit price
pricess in
the locali
locality
ty which
which include
include payment
payment of local
local
c. Nail
NaillSp
lSpike
ike (1 kg/100 bd-ft of Lumber)
Lumber) kg 0.16
taxe
taxess and hauli
hauling
ng cost
cost to the
the projec
projectt site
site..
Miscel
Miscellan
laneou
eous
s (2% of Mater
Material
ials
s Cost)
Cost) Refer
Refer to the Const
Construct
ruction
ion Materia
Materiall Price
Price Data
establi
establishe
shed d quarter
quarterly
ly by Cent
Central
ral Office
Office Price
Price
Monitoring
Monitoring Committee.
Committee.
Sub
Sub - Tota
Totall for
for F
G. Direc
Directt Unit
Unit Cost (E + F)
H. Overhe
Overhead,
ad, Contin
Contingen
gencie
cies
s & Misce
Miscella
llaneo
neous
us (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contract
Contractor's
or's Profit
Profit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANALYSI
ANALYSIS
S (DUPA)
(DUPA)
A. Labor
-
a. Construction Foreman 1 1.00 Labor
Labor Rates
Rates are variabl
variable
e per Region/
Region/Dis
Distri
trict
ct
based
based on
on mini
minimu
mumm wage
wage as appro
approve
ved
d by
b. Skilled
Skilled Laborer
Laborer 6 1.00
DOLE
DOLE.. Refe
Referr to the
the Schedu
Schedule
le of Labo
Laborr Rate
Rates.s.
c. Unskille
Unskilled
d Laborer
Laborer 6 1.00
Sub - Total
Total for A
Name and Capacity No. of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
.J
Sub
Sub - Tota
Totall for
for B
C. Total (A + B)
D. Output
Output per Hour
Hour = 4.50m
E. Direct
Direct Unit
Unit Cost (C + D)
F. Materials
Materials
Note:
Assumed weight of Steel H-Pile is 159 kglm
Sub
Sub - Tot
Total
al for
for F
G. Direc
Directt Unit
Unit Cost
Cost (E + F)
H. Overhead,
Overhead, Continoen
Continoencies
cies & Miscellaneous (OCM) Expenses 15%/12%/10%/8% of G
I. Contrac
Contractor
tor's
's Profit
Profit (CP) 10%/8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANALYSI
ANALYSIS
S (DUPA)
(DUPA)
A. Labor
a. Construct
Construction
ion Foreman
Foreman 1 1.
1.00 Labor
Labor Rates
Rates are
are variabl
variable
e per Regionl
RegionlDis
Distri
trict
ct
based
based on mini
minimu
mum wage as approve
m wage approved
d by
b. Skilled Laborer 6 1.00
DOLE.
DOLE. Refer
Refer to the Schedule of Labor
Schedule Labor Rates.
Rates.
c. Unskilled Laborer 6 1.00
Sub - Total
Total for A
Name
Name and Capaci
Capacity
ty No. of Unitls No. of H ou
ourIs Hourly Rate Amount (PhP)
B. Equipment
.J
Sub - Total
Total for B
C. Tota
Totall (A + B)
D. Output Hour =
Output per Hour 3.00m
E. Direct
Direct Unit
Unit Cost (G + D)
F. Materials
Materials
a. Tubu
Tubular
lar Pile (0.40 m ¢ x 9.50 mm thk)
Pile (0.40 m 1.00 Prices of materia
materials
ls are variable
variable per Regionl
Regionl
(delivere
(delivered
d at site)
site) Distri
District
ct based
based on the prevai
prevailing
ling unit
unit prices
prices in
the localit
locality
y which
which include payment of local
include payment
b. Weld
Welding
ing Rod (1 kg/200
kg/2000
0 kg of Steel
Steel)) kg 0.048
taxes andand hauling
hauling cost
cost to the
the projec
projectt site
site..
c. Oxyge
Oxygen/A
n/Acet
cetyle
ylene
ne (1 set/5
set/5000
000 kg of Stee
Steel)
l) set 0.019 Refer
Refer to the Constru
Constructi
ction
on Materi
Material
al Price
Price Data
Data
d. Coco Log - 2 uses m 1.00 establ
establish
ished
ed quarter
quarterly
ly by Central
Central Office
Office Price
Price
Monitoring
Monitoring Committee.
Committee.
e. Good Lumber (Falsework) - 4 uses bd-ft 16.00
f. Nail/S
Nail/Spik
pike
e (1 kg/100
kg/100 bd-ft
bd-ft of Lumber)
Lumber) kg 0.16
Miscel
Miscellan
laneou
eous
s (2% of Mater
Material
ials
s Cost)
Cost)
Note:
Assumed weight of Tubu
Tubular
lar Pipe
Pipe Pile
Pile is 95.93
95.93
kglm
Sub
Sub - Tota
Totall for
for F
G. Direc
Directt Unit
Unit Cost (E + F)
H. Overh
Overhead
ead,, Contin
Contingen
gencie
cies
s & Misc
Miscell
ellane
aneous
ous (OCM)
(OCM) Expens
Expenses
es 15%/
15%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contrac
Contractor's
tor's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value Added Tax (VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
DETAILED UNIT PRICE ANALYSIS (DUPA)
A. Labor
Name and Capacity No. of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
a. Truck Mounted Crane (41 - 45 mt) 1 1.00 See latest AGEL rental rates.
b. Diesel Hammer (K25 or equivalent) 1 1.00
c. Drop Hammer 1 1.00
d. Welding Machine (500 A), Gas/Diesel Driven 1 1.00
e. Cutting Outfit 1 0.50
Minor Tools (5% of Labor Cost)
.f
F. Materials
a. Welding Rod (1 kg/2000 kg of Steel) kg 0.024 Prices of materials are variable per Region!
District based on the prevailing unit prices in
b. OxygenlAcetylene (1 set/5000 kg of Steel) set 0.0096
the locality which include payment of local
c. Coco Log - 2 uses m 0.18 taxes and hauling cost to the project site.
d. Good Lumber - 4 uses bd-ft 1.55 Refer to the Construction Material Price Data
e. Assorted CWN (1 kg/100 bd-ft of Lumber) kg 0.02 established quarterly by Central Office Price
Monitoring Committee.
Miscellaneous (2% of Materials Cost)
A. Labo
Laborr •
a. Construct
Construction
ion Foreman
Foreman 1 1.
1.00 Labor
Labor Rates
Rates are
are variabl
variable
e per Region/
Region/Dis
Distri
trict
ct
base
based
d on mini
minimum
mum wagewage as appr
approv
oved
ed by
b. Skilled
Skilled Laborer
Laborer 6 1.00
DOLE.
DOLE. Refer
Refer to the Schedule of Labo
the Schedule Laborr Rates.
Rates.
c. Unskill
Unskilled
ed Laborer
Laborer 6 1.00
Sub - Total
Total for A
Name
Name and Capaci
Capacity
ty No. of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
.J
Sub
Sub - Tota
Totall for
for B
C. Total (A + B)
D. Outp
Output
ut per
per Hour
Hour - 2.40
2.40 m
E. Direct
Direct Unit
Unit Cost (C + D)
F. Materials
Materials
a. Coco
Coco Log
Log - 2 uses
uses m 1.00 Prices of materia
materials
ls are variable
variable per Region/
Region/
Dist
Distri
rict
ct based
based on the the preva
prevail
iling
ing unit
unit pric
prices
es in
b. Good Lumber - 4 uses bd-ft 16.00
the locali
locality
ty which
which includ
include payment of local
e payment
c. Naill
NaillSpi
Spike
ke (1 kg/100 bd-ft of Lumber)
Lumber) kg 0.16 taxe
taxess and hauli
hauling
ng cost
cost to the
the proje
project
ct site
site..
d. O xygenlAcetylene
xygenlAcetylene kg 0.01 Refer
Refer to the Constr
Construct
uction
ion Materia
Materiall Price DataData
Miscel
Miscellan
laneou
eous
s (2% of Mater
Material
ials
s Cost)
Cost) establ
establish
ished
ed quarter
quarterly
ly by Central
Central Office
Office Price
Price
Monitoring
Monitoring Committee.
Committee.
Sub
Sub - Tota
Totall for
for F
G. Direc
Directt Unit
Unit Cost (E + F)
H. Overhead,
Overhead, Contingen
Contingencies
cies & Miscellane
Miscellaneous
ous (OGM) Expenses 15%/12%/10%/8% ofG
I. Contra
Contractor'
ctor's
s Profit
Profit (CP) 10%/8% of G
J. Valu
Value
e Adde
Added
d Tax
Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
DETAIL
DETAILED
ED UNIT
UNIT PRICE
PRICE ANALYSIS
ANALYSIS (DUPA)
(DUPA)
A. Labor
a. Construct
Construction
ion Foreman
Foreman 1 1.00 Labor
Labor Rates
Rates are variabl
variable
e per Region/
Region/Dis
Distri
trict
ct
base
based
d on minim
minimum wage as appro
um wage approve
vedd by
b. Skilled
Skilled Laborer
Laborer 6 1.00
DOLE
DOLE.. Refe
Referr to the
the Schedu
Schedule
le of Lab
Labor
or Rate
Rates.s.
c. Unskille
Unskilled
d Laborer
Laborer 6 1.00
Sub - Total
Total for A
Name
Name and Capaci
Capacity
ty No. of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
a. Truc
Truck
k Mounte
Mounted
d Crane
Crane (41 - 45 mt) 1 0.62 See
See late
latest
st AGEL
AGEL rent
rental
al rates
rates..
b. Diesel
Diesel Hammer (K25 or equivalent
equivalent)) 1 0.41
c. Drop Hammer 1 0.11
d. Cutting
Cutting Outfit
Outfit 1 0.16
e. Jack
Jack Hammer 2 0.16
f. Air
Air Compress
Compressor
or (356
(356 - 450
450 cfm)
cfm) 1 0.16
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Gost)
Gost)
Sub
Sub - Tota
Totall for
for B
C. Total (A + B)
D. O ut
utput pe
per Hour - 1.95 m
,
E. Direct
Direct Unit
Unit Cost (C + D)
F. Materials
Sub - Total
Total for F
G. Direc
Directt Unit
Unit Cost
Cost (E + F)
H. Overhead,
Overhead, Contingen
Contingencies
cies & Miscellan
Miscellaneous
eous (OCM) Expenses 15%/
15%/12
12%/
%/10
10%/
%/8%
8% ofG
ofG
I. Contrac
Contractor
tor's
's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANALYSI
ANALYSIS
S (DUPA)
(DUPA)
A. Lab
Labor
or .
a. Constructi
Construction
on Foreman
Foreman 1 1.
1.00 Labor Rates are variable per Region/District
b. Skilled
Skilled Laborer
Laborer 6 1.00 based
based on minimum
minimum wage as approved by
DOLE. Refer to the Schedule of Labor Rates.
c. Unskille
Unskilled
d Laborer
Laborer 6 1.00
Sub - Total
Total for A
Name and Capacity No. of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
.J
Sub
Sub - Tota
Totall for
for B
C. Total (A + B)
D. Output
Output per Hour
Hour = 2.40
2.40 m
E. Direct
Direct Unit
Unit Cost
Cost (C + D)
F. Materials
Materials
a. Coco
Coco Log - 2 uses
uses m 1.00 Prices of materials are variable per Region/
b. Good Lumber (Falsework) - 4 uses bd-ft 16.00 District based on the prevailing unit prices in
the locality which include payment of local
c. Nail/
Nail/Spi
Spike
ke (1 kg/100 bd-ft of Lumber)
Lumber) kg 0.16 taxes
taxes and hauling
hauling cost to the project
project site.
d. OxygenlAcetylene set 0.01 Refer to the Construction Material Price Data
Miscel
Miscellan
laneou
eous
s (2% of Mater
Material
ials
s Cost)
Cost) established quarterly by Central Office Price
Monitoring Committee.
Sub
Sub - Tota
Totall for
for F
G. Direc
Directt Unit
Unit Cost (E + F)
H. Overhead,
Overhead, Contingen
Contingencies
cies & Miscellan
Miscellaneous
eous (OCM) Expenses
Expenses 15%/12%/10%/8% ofG
I. Contrac
Contractor's
tor's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT) 5% of (G + H + I)
K. Total Unit Cost (G + H + I + J)
DETAIL
DETAILED
ED UNIT
UNIT PRICE ANALYSI
ANALYSIS
S (DUPA)
(DUPA)
A. Labor
a. Construct
Construction
ion Foreman
Foreman 1 1.00 Labor
Labor Rate
Rates
s are
are variabl
variable
e per Region/
Region/Dis
Distri
trict
ct
based
based on mini
minimu
mum wage as approve
m wage approved
d by
b. Skilled
Skilled Laborer
Laborer 6 1.00
DOLE
DOLE.. Refe
Referr to the
the Sched
Schedul
ule
e of Labo
Laborr Rate
Rates.s.
c. Unskil
Unskilled
led Laborer
Laborer 6 1.00
Sub - Total
Total for A
Name
Name and Capaci
Capacity
ty No. of Unitls
Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
a. Truc
Truck
k Mounte
Mounted
d Crane
Crane (41 - 45 mt) 1 0.62 See
See late
latest
st ACEL
ACEL rent
rental
al rates
rates..
b. Diesel
Diesel Hammer (K25 or equivale
equivalent)
nt) 1 0.41
c. Drop Hammer
Hammer 1 0.11
d. Cutting
Cutting Outfit
Outfit 1 0.16
e. Jack
Jack Hammer 2 0.16
f. Air
Air Compress
Compressor
or (356
(356 - 450
450 cfm) 1 0.16
Minor
Minor Tools
Tools (10%
(10% of Labor
Labor Cost)
Cost)
.J
Sub
Sub - Tota
Totall for
for B
C. Total (A + B)
D. Output
Output per Hour
Hour = 1.95
1.95 m
E. Direct
Direct Unit
Unit Cost
Cost (C + D)
F. Materials
Materials
a. Coco
Coco Log - 2 uses
uses m 1.00 Prices
Prices of materia
materials
ls are variabl
variable
e per Region/
Region/
b. Good
Good Lumber
Lumber (False
(Falsewor
work)
k) - 4 uses
uses bd-ft 16.00 Distri
District
ct based
based on the prevail
prevailing
ing unit
unit prices
prices in
the localit
locality
y which includ
include e payme
paymentnt of local
local
c. Naill
NaillSpi
Spike
ke (1 kg/100 bd-ft of Lumber) kg 0.16
taxe
taxes
s andand hauli
hauling
ng cost
cost to the
the projec
projectt site
site..
d. OxygenlAcetylene set 0.01 Refer
Refer to the Const
Construc
ructio
tion
n Materi
Material
al Price
Price Data
Data
Miscel
Miscellan
laneou
eous
s (2% of Materi
Materials
als Cost)
Cost) establ
establish
ished
ed quarter
quarterly
ly by Central
Central Office
Office Price
Price
Monitoring
Monitoring Committee.
Committee.
Sub - Total
Total for F
G. Direc
Directt Unit
Unit Cost (E + F)
H. Overh
Overhead
ead,, Contin
Contingen
gencie
cies
s & Misce
Miscella
llaneo
neous
us (OCM)
(OCM) Expens
Expenses
es 15%/12%/10%/8% of G
I. Contrac
Contractor's
tor's Profit
Profit (CP) 10%/8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
DETAILE
DETAILED
D UNIT
UNIT PRICE ANALYSI
ANALYSIS
S (DUPA)
(DUPA)
A. Labor .
a. Construct
Construction
ion Foreman
Foreman 1 1.00 Labor
Labor Rates
Rates are variabl
variable
e per Region/
Region/Dis
Distri
trict
ct
based
based on mini
minimu
mum wage as approve
m wage approved
d by
b. Skilled
Skilled Laborer
Laborer 6 1.00
DOLE
DOLE.. Refe
Referr to the
the Sched
Schedul
ule
e of Labor
Labor Rate
Rates.s.
c. Unskille
Unskilled
d Laborer
Laborer 6 1.00
Sub - Total
Total for A
Name and Capacity No. of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
a. Truc
Truck
k Mounte
Mounted
d Crane
Crane (41 - 45 mt) 1 0.53 See
See late
latest
st AGEL
AGEL rent
rental
al rates
rates..
b. Diesel Hammer (K25 or equivalent) 1 0.27
c. Drop Hammer
Hammer 1 0.13
d. Cutting
Cutting Outfit
Outfit 1 0.20
e. Jack
Jack Hammer 2 0.20
f. Air Compres
Compressor
sor (356
(356 - 450
450 cfm) 1 0.20
Minor
Minor Tools (10%
(10% of Labor
Labor Cost)
Cost)
.f
Sub
Sub - Tota
Totall for
for B
C. Total (A + B)
Total
Output per Hour =
D. Output 2.40
2.40 m
E. Direct
Direct Unit
Unit Cost (C + D )
F. Materials
Materials
a. Coco
Coco Log - 2 uses
uses m 2.00 Prices
Prices ofof materi
materials
als are variabl
variablee per Region/
Region/
b. Good Lumber (Falsework) - 4 uses bd-ft 16.00 Dist
Distri
rict
ct based
based on the the preva
prevail
ilin
ing
g unit
unit price
prices
s in
the
the loca
locali
lity
ty which
which includ
includee payme
payment nt of local
local
c. Naill
NaillSpi
Spike
ke (1 kg/100 bd-ft of Lumber)
Lumber) kg 0.16
taxes
taxes and hauling
hauling cost
cost to the
the projec
projectt site.
site.
d.Oxygen/Acetylene set 0.01 Refer
Refer to the Const
Construct
ruction
ion Materi
Materialal Price
Price Data
Data
e. Fabric
Fabricate
ated
d RC Pile (deliv
(delivere
ered
d at site
site)) m 1.00 establi
establishe
shed d quarter
quarterly
ly by Centra
Centrall Offi
Office
ce Price
Price
Monitoring
Monitoring Committee.
Committee.
Note:
The unit
unit cost
cost of Fabri
Fabricat
cated
ed RC Pile is depend
dependent
ent
on its type.
type.
Pleas
Please
e refer
refer to the
the Direc
Directt Cost
Cost of
Item 1052(7)a
1052(7)a
Sub
Sub - Tota
Totall for
for F
G. Direc
Directt Unit
Unit Cost
Cost (E + F)
H. Overhe
Overhead,
ad, Contin
Contingen
gencie
cies
s & Misc
Miscell
ellane
aneous
ous (OGM)
(OGM) Expens
Expenses
es 15%/
15%/12
12%/
%/10
10%/
%/8%
8% of G
I. Contra
Contracto
ctor's
r's Profit
Profit (CP) 10%/
10%/8%
8% of G
J. Value
Value Added
Added Tax (VAT)
(VAT) 5% of (G + H + I)
K. Total
Total Unit
Unit Cost
Cost (G + H + I + J)
DETAILED UNIT PRICE ANALYSIS (DUPA)
Item No./Description 1052(16)b Test Piles, furnished and driven (type A, B, C or D), hard strata
Unit of Measurement m
Output per hour 1.95 m
A. Labor
B. Equipment
a. Truck Mounted Crane (41 - 45 mt) 1 0.62 See latest ACEL rental rates.
b. Diesel Hammer (K25 or equivalent) 1 0.41
c. Drop Hammer 1 0.11
d. Cutting Outfit 1 0.16
e. Jack Hammer 2 0.16
f. Air Compressor (356 - 450 cfm) 1 0.16
Minor Tools (10% of Labor Cost)
F. Materials
a. Coco Log - 2 uses m 2.00 Prices of materials are variable per Region!
b. Good Lumber (Falsework) - 4 uses bd-ft 16.00 District based on the prevailing unit prices in
the locality which include payment of local
c. NaillSpike (1 kg/100 bd-ft of Lumber) kg 0.16
taxes and hauling cost to the project site.
d. Oxygen/Acetylene set 0.01 Refer to the Construction Material Price Data
e. Fabricated RC Pile (delivered at site) m 1.00 established quarterly by Central Office Price
Monitoring Committee.
Note:
The unit cost of Fabricated RC Pile is dependent
on its type.
Please refer to the Direct Cost of
Item 1052(7)a
Item No.lDescription 1052(17)a Concrete Piles cast in Drilled Holes, 0.80 m 0, fc' = 28 MPa (ordinary soil condition)
Unit of Measurement m
Output per hour 1.58 m
A. Labor
Name and Capacity No. of Unitls No. of Houris Hourly Rate Amount (PhP)
B. Equipment
a. Drilling Rig (300 hp) 1 0.26 See latest AGEL rental rates.
b. Crawler Crane (41 - 45 mt) 1 0.95
c. Crawler Crane (21 - 25 mt) 1 0.95
d. Dump Truck (12 yd3) 1 0.95
e. Payloader (1.50 m\ LX80-2C 1 0.95
f. Generator Set (300 kW) 1 0.95
g. Bentonite Bin 1 0.50
h. Bentonite Mixer 1 0.50
i . Water Pump, 100 mm suction !1l(7.5 hp) 1 0.74
j. Water Truck (16000 L) 1 0.74
k. Bar Cutter 1 0.50
I. Bar Bender 1 0.50
m. Welding Machine (500A), Electric Driven 1 0.71
n. Cutting Outfit 1 0.71
f
o. Tremie Pipe Set 1 0.24
p. SPT & Desanding Machine 1 0.24
q. Portable Breaker, BHF30S 2 0.05
r. Air Compressor, Portable (126 - 160 cfm) 1 0.05
s. Lighting System/Tower Lights 1 0.95
Minor Tools (10% of Labor Cost)
Sub - Total for B
C. Total (A + B)
D. Output per Hour = 1.58 m
E. Direct Unit Cost (C + D)
F. Materials
a. Ready Mix Concrete, fc' = 28 MPa @ 28 Days cu.m 0.55 Prices of materials are variable per Region/
b. Reinforcing Steel Bar' kg 205.00 District based on the prevailing unit prices in
the locality which include payment of local
c. Tire Wire (2% of RSB) kg 4 .10
taxes and hauling cost to the project site.
d. OxygenlAcetylene (1 set/5000 kg. of RSB) set 0.041 Refer to the Construction Material Price Data
e. Welding Rod (1 kg/2000 kg of RSB) kg 0.10 established quarterly by Central Office Price
Miscellaneous (3% of Materials, Bentonite and etc.) Monitoring Committee.
Item No.lDescription 1052(17)b Concrete Piles cast in Drilled Holes, 1.00 m 0, fc' = 28 MPa (ordinary soil condition)
Unit of Measurement m
Output per hour 1.33 m
A. Labor
Name and Capacity No. of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
a. Drilling Rig (300 hp) 1 0.31 See latest AGEL rental rates.
b. Crawler Crane (41 - 45 mt) 1 0.96
c. Crawler Crane (21 - 25 mt) 1 0.96
d. Dump Truck (12 yd3) 1 0.96
e. Payloader (1.50 m 3), LX80-2C 1 0.96
f. Generator Set (300 kW) 1 0.96
g. Bentonite Bin 1 0.53
h. Bentonite Mixer 1 0.53
i . Water Pump, 100 mm suction 11l (7.5 hp) 1 0.78
j. Water Truck (16000 L) 1 0.78
k. Bar Cutter 1 0.56
I. Bar Bender 1 0.56
m. Welding Machine (500A), Electric Driven 1 0.73
n. Cutting Outfit 1 0.73 .J
F. Materials
a. Ready Mix Concrete, fc' = 28 MPa @ 28 Days cU.m 0.86 Prices of materials are variable per Region/
b. Reinforcing Steel Bar * kg 253.59 District based on the prevailing unit prices in
the locality which include payment of local
c. Tire Wire (2% of RSB) kg 5.07 taxes and hauling cost to the project site.
d. OxygenlAcetylene (1 set/5000 kg. of RSB) set 0.051 Refer to the Construction Material Price Data
e. Welding Rod (1 kg/2000 kg of RSB) kg 0.13 established quarterly by Central Office Price
Miscellaneous (3% of Materials, Bentonite and etc.) Monitoring Committee.
Item No.lDescription 1052(17)c Concrete Piles cast in Drilled Holes, 1.20 m 0 , fe' = 28 MPa (ordinary soil condition)
Unit of Measurement m
Output per hour 1.09 m
A. Labor
Name and Capacity No. of Unitls No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
a. Drilling Rig (300 hp) 1 0.35 See latest ACEL rental rates.
b. Crawler Crane (41 - 45 mt) 1 0.96
c. Crawler Crane (21 - 25 mt) 1 0.96
d. Dump Truck (12 yd3) 1 0.96
e. Payloader (1.50 m\ LX80-2C 1 0.96
f. Generator Set (300 kW) 1 0.96
g. Bentonite Bin 1 0.56
h. Bentonite Mixer 1 0.56
i . Water Pump, 100 mm suction (Il (7.5 hp) 1 0.82
j. Water Truck/Pump (16000 L) 1 0.82
k. Bar Cutter 1 0.60
I. Bar Bender 1 0.60
m. Welding Machine (500 A), Electric Driven 1 0.75
n. Cutting Outfit 1 0.75
.J
o. Tremie Pipe Set 1 0.22
p. SPT & Desanding Machine 1 0.25
q. Portable Breaker, BHF30S 2 0.04
r. Air Compressor, Portable (126- 160 cfm) 1 0.04
s. Lighting SystemfTower Lights 1 0.96
Minor Tools (10% of Labor Cost)
Sub - Total for B
C. Total (A + B)
D. Output per Hour = 1.09 m
E. Direct Unit Cost (C + D)
F. Materials
a. Ready Mix Concrete, fe' = 28 MPa @ 28 Days cU.m 1.24 Prices of materials are variable per Region/
b. Reinforcing Steel Bar * kg 304.30 District based on the prevailing unit prices in
the locality which include payment of local
c. Tire Wire (2% of RSB) kg 6.09
taxes and hauling cost to the project site.
d. Oxygen/Acetylene (1 set/5000 kg. of RSB) set 0.06 Refer to the Construction Material Price Data
e. Welding Rod (1 kg/2000 kg of RSB) kg 0.15 established quarterly by Central Office Price
Miscellaneous (3% of Materials, Bentonite and etc.) Monitoring Committee.
Item No./Description 1052(17)d Concrete Piles cast in Drilled Holes, 1.50 m 0 , fc' = 28 MPa (ordinary soil condition)
Unit of Measurement m
Output per hour 0.81 m
A. Labor
Name and Capacity No. of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
a. Drilling Rig (300 hp) 1 0.39 See latest AGEL rental rates.
b. Crawler Crane (41 - 45 mt) 1 0.97
c. Crawler Crane (21 - 25 mt) 1 0.97
d. Dump Truck (12 yd 3) 1 0.97
e. Payloader (1.50 m\ LX80-2C 1 0.97
f. Generator Set (300 kW) 1 0.97
g. Bentonite Bin 1 0.61
h. Bentonite Mixer 1 0.61
i . Water Pump, 100 mm suction ¢ (7.5 hp) 1 0.86
j. Water Truck/Pump (16000 L) 1 0.86
k. Bar Cutter 1 0.65
I. Bar Bender 1 0.65
m. Welding Machine (500 A), Electric Driven 1 0.76
n. Cutting Outfit 1 0.76 .J
F. Materials
a. Ready Mix Concrete, fc' = 28 MPa @ 28 Days cU.m 1.94 Prices Df materials are variable per RegiDn/
District based Dn the prevailing unit prices in
b. Reinforcing Steel Bar' kg 387.77
the IDcality which include payment Df IDcal
c. Tire Wire (2% of RSB) kg 7.76 taxes and hauling CDSttD the project site.
d. Oxygen/Acetylene (1 set/5000 kg of RSB) set 0.08 Refer tD the CDnstructiDn Material Price Data
e. Welding Rod (1 kg/2000 kg of RSB) kg 0.19 established quarterly by Central Office Price
MDnitDring CDmmittee.
Miscellaneous (3% of Materials, Bentonite and etc.)
Item No./Description 1052(17)e Concrete Piles cast in Drilled Holes, 1.80 m 0, fe' = 28 MPa (ordinary soil condition)
Unit of Measurement m
Output per hour 0.62 m
A. Labor
Name and Capacity No. of Unitls No. of Hour/s Hourly Rate Amount (PhP)
B. Equipment
a. Drilling Rig (300 hp) 1 0.42 See latest AGEL rental rates.
b. Crawler Crane (41 - 45 mt) 1 0.98
c. Crawler Crane (21 - 25 mt) 1 0.98
d. Dump Truck (12 yd3) 1 0.98
e. Payloader (1.50 m\ LX80-2C 1 0.98
f. Generator Set (300 kW) 1 0.98
g. Bentonite Bin 1 0.64
h. Bentonite Mixer 1 0.64
i . Water Pump, 100 mm suction 11l(7.5 hp) 1 0.90
j. Water Truck/Pump (16000 L) 1 0.90
k. Bar Cutter 1 0.68
I. Bar Bender 1 0.68
m. Welding Machine (500 A), Electric Driven 1 0.76
.J
n. Cutting Outfit 1 0.76
o. Tremie Pipe Set 1 0.22
p. SPT & Desanding Machine 1 0.26
q. Portable Breaker, BHF30S 2 0.02
r. Air Compressor, Portable (126-160 cfm) 1 0.02
s. Lighting System/Tower Lights 1 0.98
Minor Tools (10% of Labor Cost)
Sub - Total for B
C. Total (A + B)
D. Output per Hour - 0.62m
E. Direct Unit Cost (C + D)
F. Materials
a. Ready Mix Concrete, fe' = 28 Mpa @ 28 D cU.m 2.80 Prices of materials are variable per Regionl
District based on the prevailing unit prices in
b. Reinforcing Steel Bar' kg 451.98
the locality which include payment of local
c. Tire Wire (2% of RSB) kg 9.04 taxes and hauling cost to the project site.
d. Oxygen/Acetylene (1 set/5000 kg of RSB) set 0.09 Refer to the Construction Material Price Data
e. Welding Rod (1 kg/2000 kg of RSB) kg 0.23 established quarterly by Central Office Price
Monitoring Committee.
Miscellaneous (3% of Materials, Bentonite and etc.)
A. Labor
Name and Capacity No. of Unitls No. of Houris Hourly Rate Amount (PhP)
B. Equipment
"-
Sub - Total for B
C. Total (A + B)
D. Output per Hour = 5.714 m
E. Direct Unit Cost (C + D)
F. Materials
a. 30.00 mm2 - 38 mm2 Electric Wire Prices of materials are variable per Region/
m 1.00 District based on the prevailing unit prices in the
(TW/THHN/TWHN2)
locality which include payment of local taxes
b. Consumables (3% of Materials Cost) and hauling cost to the project site. Refer to the
Construction Material Price Data established
quarterly by Central Office Price Monitoring
Committee.
A. Labor
Name and Capacity No. of U nitls No. of H ouris Hourly Rate Amount (PhP)
B. Equipment
"
F. Materials
a. 50.00 mm2 - 60mm2 Electric Wire Prices of materials are variable per Region!
m 1.00 District based on the prevailing unit prices in the
(TWITHHNITWHN2)
locality which include payment of local taxes
b. Consumables (3% of Materials Cost) and hauling cost to the project site. Refer to the
Construction Material Price Data established
quarterly by Central Office Price Monitoring
Committee.
A. Labor
Name and Capacity No. of Unitls No. of Houris Hourly Rate Amount (PhP)
.
B. Equipment
"
F. Materials
a. 80.00 mm2 - 125 mm2 Electric Wire Prices of materials are variable per Region/
m 1.00 District based on the prevailing unit prices in the
(TW/THHN/TWHN2)
locality which include payment of local taxes
b. Consumables (3% of Materials Cost) and hauling cost to the project site. Refer to the
Construction Material Price Data established
quarterly by Central Office Price Monitoring
Committee.
A. Labor
Name and Capacity No. of Unitls No. of Houris Hourly Rate Amount (PhP)
B. Equipment
"-
F. Materials
a.150.00 mm2 -250 mm2 Electric Wire m 1.00 Prices of materials are variable per Regionl
District based on the prevailing unit prices in the
(TW/THHN/TWHN2)
locality which include payment of local taxes
b. Consumables (3% of Materials Cost) and hauling cost to the project site. Refer to the
Construction Material Price Data established
quarterly by Central Office Price Monitoring
Committee.
Note 1. Use this cost sheet for Item Nos. 1101(2)a18, 1101(2)a19 and 1101(2)a20.
DETAILED UNIT PRICE ANALYSIS (DUPA)
A. Labor
Name and Capacity No. of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
-,
Sub - Total for B
C. Total (A + B)
D. Output per Hour = 1.60 m
E. Direct Unit Cost (C + D )
F. Materials
a. 325.00 mm 2 - 400 mm 2 Electric Wire m 1.00 Prices of materials are variable per Region/
District based on the prevailing unit prices in the
(TWITHHNITWHN2)
locality which include payment of local taxes
b. Consumables (3% of Materials Cost) and hauling cost to the project site. Refer to the
Construction Material Price Data established
quarterly by Central Office Price Monitoring
Committee.
A. Labor
Name and Capacity No. of Unitls No. of Houris Hourly Rate Amount (PhP)
B. Equipment
..
Sub - Total for B
C. Total (A + B)
D. Output per Hour = 1.333 m
E. Direct Unit Cost (C + D)
F. Materials
a. 500.00 mm2 Electric Wire (TW/THHN/TWHN2) m 1.00 Prices of materials are variable per Region/
District based on the prevailing unit prices in the
b. Consumables (3% of Materials Cost) locality which include payment of local taxes
and hauling cost to the project site. Refer to the
Construction Material Price Data established
quarterly by Central Office Price Monitoring
Committee.
A. Labor
(Labor cost shall be included in the Power Contract with MERALCO or Local Power Cooperative.)
Name and Capacity No. of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
.J
F. Materials
a. XLPE, Creosoted pole, anchor Rod, anchor log, (Materials cost included in the Power Contract with MERALCO
power load studs, pad mounted transformer, pole-type or Local Power Cooperative.)
transformer, transformer bracket, Aluminum
Conductor Steel-Reinforced (ACSR) powerfuse,
concrete pole, power transmission pole, pin insulator,
pole top pin, machine bolts and washers
A. Labor
Name and Capacity No. of U nitls N o. of H ourIs Hourly Rate Amount (PhP)
B. Equipment
"
F. Materials
a. 2.00 mm2 - 5.00 mm2 Bare Copper Wire m 1.00 Prices of materials are variable per Region!
b. Consumables (3% of Materials Cost) District based on the prevailing unit prices in the
locality which include payment of local taxes
and hauling cost to the project site. Refer to the
Construction Material Price Data established
quarterly by Central Office Price Monitoring
Committee.
Item No.lDescription 1101(7) 8.00 mm2 - 22.00 mm2 Bare Copper Wire
Unit of Measurement m
Output per hour 10.00 m
A. Labor
Name and Capacity No. of Unitls No. of H ouris Hourly Rate Amount (PhP)
.
B. Equipment
"
F. Materials
a. 8.00 mm2 - 22.00 mm2 Bare Copper Wire m 1.00 Prices of materials are variable per Region/
b. Consumables (3% of Materials Cost) District based on the prevailing unit prices in the
locality which include payment of local taxes
and hauling cost to the project site. Refer to the
Construction Material Price Data established
quarterly by Central Office Price Monitoring
Committee.
Item No./Description 1101(7) 30.00 mm2 - 38.00 mm2 Bare Copper Wire
Unit of Measurement m
Output per hour 12.00 m
A. Labor
Name and Capacity No. of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
"
F. Materials
a. 30.00 mm2 - 38.00 mm2 Bare Copper Wire m 1.00 Prices of materials are variable per Regionl
b. Consumables (3% of Materials Cost) District based on the prevailing unit prices in the
locality which include payment of local taxes
and hauling cost to the project site, Refer to the
Construction Material Price Data established
quarterly by Central Office Price Monitoring
Committee.
Item No./Description 1101(7) 50.00 mm2 - 60.00 mm2 Bare Copper Wire
Unit of Measurement m
Output per hour 10.00 m
A. Labor
Name and Capacity No. of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
".
F. Materials
a. 50.00 mm2 - 60.00 mm2 Bare Copper Wire m 1.00 Prices of materials are variable per Region!
b. Consumables (3% of Materials Cost) District based on the prevailing unit prices in the
locality which include payment of local taxes
and hauling cost to the project site. Refer to the
Construction Material Price Data established
quarterly by Central Office Price Monitoring
Committee.
Item No.lDescription 1101(7) 80.00 mm2 - 125.00 mm2 Bare Copper Wire
Unit of Measurement m
Output per hour 6.00 m
A. Labor
Name and Capacity N o. of U nitls No. of H ourIs Hourly Rate Amount (PhP)
B. Equipment
'.
F. Materials
a. 80.00 mm2 - 125.00 mm 2 Bare Copper Wire m 1.00 Prices of materials are variable per Region/
b. Consumables (5% of Materials Cost) District based on the prevailing unit prices in the
locality which include payment of local taxes
and hauling cost to the project site, Refer to the
Construction Material Price Data established
quarterly by Central Office Price Monitoring
Committee,
Item No./Description 1101(7) 200.00 mm2 - 250.00 mm2 Bare Copper Wire
Unit of Measurement m
Output per hour 6.667 m
A. Labor
Name and Capacity No. of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
"
F. Materials
a. 200.00 mm 2 - 250.00 mm2 Bare Copper Wire m 1.00 Prices of materials are variable per Region!
b. Consumables (5% of Materials Cost) District based on the prevailing unit prices in the
locality which include payment of local taxes
and hauling cost to the project site. Refer to the
Construction Material Price Data established
quarterly by Central Office Price Monitoring
Committee.
A. Labor
Name and Capacity No. of UniUs No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
.J
C. Total (A + B)
D. Output = 1 I.s.
E. Direct Unit Cost (C + D)
F. Materials
A. Labor
Name and Capacity No. of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
.J
F. Materials
A. Labor
Name and Capacity No. of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
.J
F. Materials
Item No./Description 1202(2)a Fire Pump with complete control and standard accessories
Unit of Measurement set
Output 1 set
A. Labor
B. Equipment
F. Materials
Item No./Description 1202(2)b Jockey Pump with complete control and standard accessories
Unit of Measurement set
Output 1 set
A. Labor
Name and Capacity No. of Unitls No. of HourIs Hour ly Rate Amount (PhP)
B. Equipment
F. Materials
a. J oc key Pum p c om plete with controll er and s et 1.00 Prices of materials are variable per Region/
NEMA 3R and other accessories: valve, suction District based on the prevailing unit prices in
the locality which include payment of local
and discharge gauge, flow meter and other
taxes and hauling cost to the project site.
accessories specified in mechanical plan and Refer to the Construction Material Price Data
specifications established quarterly by Central OfficePrice
Monitoring Committee.
b. Consumables (5% of Materials Cost)
A. Labor
Name and Capacity No. of Unitls No. of HourIs Hourly Rate Amount (PhP)
B. Equipment
F. Materials
a. Sprinkler Head, upright/pendent/wall pc 1.00 Prices of materials are variable per Region/
District based on the prevailing unit prices in
b. Consumables (5% of Materials Cost)
the locality which include payment of local
taxes and hauling cost to the project site.
Refer to the Construction Material Price Data
established quarterly by Central Office Price
Monitoring Committee.
FORMULA: T = D7R
Flat
Average Hauling Distance = 2.00 km
Loading Time = 3.00 min
Loaded Travel Time
First 200 m @ 20 kph = 0.60 min
Succeeding 1600 m @ 30 kph = 3.20 min
Next 200 m @ 20 kph = 0.60 min
Unload and Manuever = 2.00 min
Return Empty
First 200 m @ 30 kph = 0.40 min
Succeeding 1600 m @ 45 kph = 2.13 min
Next 200 m @ 30 kph = 0.40 min
Cycle Time, T = 12.33 min
Allowance for Delay = 1.23 min
NOTE:
The assumed travel time for loaded and unloaded dump trucks for each type of road surface and
terrain condition are for normal conditions It may vary depending on traffic and road surface
SECTION D
The estimated labor rates for each region/district office were computed in accordance with D.O.
40, Series of 2009, Re: Guidelines for the establishment of Construction Materials Price Data,
Standard Labor and Equipment Rental Rates (or latest issuance), and based on the minimum
wage rate as published by the National Wages and Productivity Commission, Department of
Labor and Emolovment (DOLE)'
The computed labor rates including all component costs such as basic wage plus emergency cost
of living allowance (ECOLA) and worker's statutory monetary benefits and others are in
accordance with the existing~ laws and government regulations. It shall be updated as the need
arises based on the latest issuances for new minimum wages by the NWPC/DOLE and/or any
amendments to the benefits of the workers.
CASE II - In cases wherein project/s traverse/s certain provinces within the jurisdiction of
only one (1) Regional Office, the average labor cost of the said Regional Office
shall be utilized.
CASE III - In cases wherein project/s passes numerous pfovinces within the jurisdiction of
.two (2) or more Regional Offices, the average labor cost of the said Regional
Office with the longest work coverage or with largest major scope of works
shall be utilized.
~ II: :)
II: 000
....•
0"\
1 .0
....• .....
1 .0
1.0 Vl Vl m ,...
<t
N ....• 0 0
,...
Q. 0
oci <i
II: :I: ....• ....• ..... ....• 0" \ 0 "\ 0 "\ 00
i Q. 0
cri 0
0"\
0 "\
N
0 "\
<t
00
<t
00 ,... ,... ,... ,...
00 m m
Vl
1.0
Vl
1.0
Vl
V l Vl ,...
0
:I: m ,...
00
,... ,... Vl 00 00 0 m
~ II: m m 0 0
"0
e
~ ~
I-
Z
lci
0"\
0 N N
N m m .....
,...
....; 0 0 lci
0"\ 0"\ 1.0
<t
....•
r'
'"
b.O
.::;
II:
Q. 0
~
0"\
<t-
N
0
m-
N
0
N
- - ....•
0
....• .....
N
0"\-
m m
....• 00
00-
0"\
1.0-
..... ..... ....•
<t-
b.O
l-'" ~
e- § 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
~'" Ib
~
0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0
. ....• ....• ..... ..... ....• ..... .....
..... ....
e 0..
Vl'" V!
l-
e- ii:
O ~ :I:
N
Z !:; 0 0 0 0 0 0 0 0 0
Q)
~ ~ 0 Vl Vl Vl 0 Vl Vl Vl Vl
:::>
Cf
...~ :I:...
en ~ 0
Vl
N
r'
m .....
N
N N 0
N N
....• 0
N
r'..... ....•r'
00 00
N
1.0
• m
....
r'
.....
b.O
·Vi
U :E
o
'"
0.. 0 0..
o
-
V') >-
V!
0 0 0 0 0 0 0
o
o
U
'"'" ~ m ,...
LLI 0 0 0 0 0 0 0 0 0 o
0 0 0 0 0 0 0 Vl-
'"
0.. V! 0 "\ 0" \ 0" \ 0" \ 0" \ 0 "\ 0"\ cri N 0-
~
a::
W
:::>
V!
V!
0
- - - - - - -
0 0 0 0
....• ..... ..... ..... ....• ..... .....
0 0 0"\
0"\
N
00 QJ
>
o
r::T >-
a::
.0
'" ,... o co
e Ie
~ :I:
:I:
I-
0
Vl
00
00
Vl
N
Vl
N ..... 0 0
00 00 0
0 m
~
QQ o
o
o &
CO >
~ <tr' ....; .n 00
l ci cri N N
'" I- Z lc i co
..• ~ o QJ
0.. 0
,... u
<C rtl
0 ,... 0 Vl Vl
m N N .....
Vl 1 .0 1 .0 1 .0
..... C
....I ",- - - - - - - - -
Q. 1.0 <t <t .s:: QJ
..... ....• ..... ..... ..... ....• ..... ..... 0"\ u c C 0-
a:l
.•...
'" co 00"0
u.. 0
.•..
QJ :p '';:; c: co
·u
e Cl: z
>
'" ~
V!
o
X
V>
>- E
: :>
.0.00
: :>
:s
co
a
o
Vl
Z u
0 0 0 0 0 0 0 0 0 QJ co
m- c: c: ci +
-
>
00 0"\ 0 0 <t 00 00 N 0
e z
"0
0- ~ oci oci cri cri N .n .n cri lci C
"0
o
000
U U 0
>-
...
co
:::> ~ 00 ,... 0 "\ 0 "\ Vl
m 1.0
1.0 1.0 1.0
0
1 .0
0
1 .0
Vl
Vl
1.0
<t
o I.n V') a.ri' 0-
i= C
V>
o ...•..
m -OJ -Q) 0-
f;
::E: :;::; u N
....• QJ QJ ~
<C ;:
C
e
....I :::>
~ 0 0 0 0 0 0 0 0 0
o *f;
~
c.c.w
~ 0 o
::::
a.. ~ ~ .n .0
Vl
::::> :I: 0
0 N
0 0
0
0
.n .n
0 0
0
0
0
.J co
--' c
E E .0
c
~
c
V)
~'"
QJ QJ QJ
"0
LLI
....I
V>
U .!!! >- N OJ Ci1 0.
co
.IE.- Vi C. a.a.E
Q.
·c
~ ~ 0
00
0
0"\
0
0
0
0
0
<t
0
00
0
00
0
N
0
0 :;::;
"0 M
QJ QJ 0
en
<C oci oci cri cri N .n .n cri lci :; Vl
N ~a::a::~
~ m ,... £
~'"
1.0 0 " \ 0 "\ 1.0
0
Vl 0 0 Vl
E b.O ~ ~
<C
00 1. 0 1 .0 1 .0 1. 0 1 .0 Vl <t *QJ
V') b.O
QQ ~ 5 5 c
co
e >- E E ~
0 l- :s: £c: <! « u
M >- V!
~ "'C "'0 'Vi
:::> 0 II: .r;;
ci lti
"0
U 0
I-
0
00
Vl
1.0
0
Vl
0
Vl
0
<t
0
m m
0 0
N
0
0
Cl
o ~
~ ~ ~~ 8
~ n:I
II: u
e U .... ; .... ; .... ; .... ; .... ; ....; ....; ....; .... ;
.~ ~ ~ ~ ~
...~
.0:;
0
~'" en co
a:l co ~ 15 N a..
e- S II II
O "
.0
.IE. '"
e
.•...
OJ
~'"
:;::; '+-
'"
0..
0
-'"'" >-
~'" :~
vi" '"
0- z
·u 0
'"
Ie ·c i=
c:: :::> LI"l
...•
0.. .9 .9co
'" ~ ii: '"
0;
'"_..cOJ a
-' N
u
~
V! C. 0;
- -
.•... c.
e ~ 0
0
0 0
0
'"
u
"0
e '"2
C
QJ
.0
co .0 •...
0 --' C
QJ co 0
.2 '" .0 E
.e-
"0
E 0
--' .0
'" :::>'"
OJ OJ "0 co
U Qj u.. :3 : :: : c.
.::; .0
~ "0--'
c c co
-
'+- cr "'"
--' :;<
e ~
co co cr
'f' ~
N UJ Vl
0
E E >- >- UJ •... "0
'"
OJ .!!! ~ QJ "0
co
>
co :;: .s::
QJ
~ ·E :;<C'"
.~ :;<
:;::;
0 > i=
'" ~ ...0 QJ QJ
--' :c : c ::; Ci
.99 QQ QJ
Vl Vl
=>
~
~ U V!
Z
0 ...o II: ~ w
i=
~
:)
0 0 Z
0 ci ....• N m <t Vl 1.0 ,... 00 0"\
b
SECTION E
Rental of equipment presented in the Detailed Unit Price Analysis (DUPA) are based on the prevailing "Association of
Carriers and Equipment Lessors, (ACEL) Inc." rental rates approved for use by the DPWH (Presently it is the 2014
ACEL Rates). Rental rates of equipment not indicated in the ACEL booklet shall be taken from the rental rates
prepared by the Bureau of Equipment. For simplicity in computation, the operated rental rates are preferred over the
bare rental rates as the former includes operator's wages, fringe benefits, fuel, oil, lubricants and equipment
maintenance.
E.! List of equipment adopted in the standard DUPA with make, model and capacity
HEEL
CAPACITY RENTAL RATE
DESCRIPTION
I
MODEL
I ER
1. Earthmoving Equipment
1.1 Bulldozer D6H SERIES II PSDS/DD 165 PhP 3,379.00
LX80- 2C 3 3 110 PhP 1,733.00
1.2 Payloader 1.50 m /1.95 vd
1.3 Motorized Road Grader G710A 140 PhP 2,173.00
2. Compaction Equipment
2.1 Plate Compactor 400-500 Gasoline Engine 5 PhP 123.00
3. Lifting Equipment
3.1 Crawler Crane All Models 21-25 mt 145 PhP 1,522.00
3.4 Truck Mounted Crane All Models 20-25 mT 200 PhP 1,631.00
3.5 Truck Mounted Crane All Models 31-35 mt 238 PhP 1,861.00
3.6 Truck Mounted Crane All Models 41-45 mt 246 PhP 2,606.00
3.7 Truck Mounted, Scissor Lift, Terrain Gas/Diesel Driven 40 ft hts x 46 ft range PhP 1,386.00
4. Excavating Equipment
3 3 99 PhP 1,537.00
4.1 Backhoe SE 130 LC-2 0.80 m /1.04 vd
3 3 99 PhP 1,998.10
4.2 Backhoe w/ Breaker SE 130 LC-2 0.80 m /1.04 vd
3 3 PhP 922.00
4.3 Backhoe, Wheel Mounted PW60N-l 0.28 m /0.37 vd 50
4.4 Portable Breaker WACKER PORTABLE PETROL BREAKER, BHF30S 4 PhP 129.38
5. Foundation Equipment .J
5.2 Vibro Hammer DPD600T Hydraulic Pile Driver 60 ton 201 PhP 2,123.00
Vibro Hammer w/ Hydraulic Power 4,118.00
5.3 MHF12 w/ Hyd Power Pack 120 kN-m 222 PhP
Pack
5.4 Vibro Hammer VIBRO FONCEUR, PTC25H1A 45000 kg-m 272.22 PhP 3,069.00
6 Concreting Equipment
6.1 Concrete Screeder Wacker Truss Screed 5.50 PhP 545.00
8 Air Equipment
8.1 Air Compressor All Models 356-450 dm 130 PhP 965.00
FLYWHE
NTAL RATE
I
DESCRIPTION
I MODEL AMPERES
HORSEPO
11 Shop Equipment
11.1 Welding Machine Electric Driven/DC Output 500 PhP 391.00
13.2 Bar Cutter 25 mm Maximum Rebar 0 (Grade 40), Single Phase PhP 219.75
13.3 Bar Bender 25 mm Maximum Rebar 0, Three Phase PhP 351.50
14. Others
14.1 Drop Hammer w/ accessories 20 mt PhP 5,000.00
14.2 1 Air Compressor w/2 Jack Hammer PhP 1,265.00