i ii iii i ii iii iv v vi vii viii ix i ii iii iv
No. Wire cut Slaked Scaffoldin
Spe. Sk. Sk. Un Sk. Brick Sand Cement Acids Tools Etc.
ITEMS Bricks Lime gs
Days Days Days 1000 M3 50Kg. 1000 Ltr 50Kg.
A Brick work in 1:5 cmt. Sand mtr. In foundation
(3m3) 3.20 4.30 1.60 0.75 4.30 3% of (1) 5% of (1)
B Ditto- in 1:8 cmt. Sand mtr. In foundation ( 3m3) 3.20 4.30 1.60 1.15 2.50 3% of (1) 3% of (1)
D Ditto- 225mm thk walls in ground floor. ( 10m2 ) 2.40 4.05 1.25 0.60 3.25 3% of (1) 5% of (1)
E Ditto- 337.5mm thk walls in ground floor. (10m2) 3.75 5.90 1.85 0.90 4.85 3% of (1) 3% of (1)
H Ditto- 225mm thk walls in ground floor. ( 10m2 ) 2.40 4.05 0.55 2.70 1.20 3% of (1) 3% of (1)
I Ditto- 337.5mm thk walls in ground floor. (10m2) 4.05 5.90 0.90 4.85 1.80 3% of (1) 2% of (1)
N Ditto - With out ramp ( 3m ) 1.02 1.27 0.11 0.12 0.71 3% of (1)