You are on page 1of 3
CLP@ tz geaynman 20 March 2024 PMc hang Hong ited xan EEE est segon anmienan AECOM Asia Co. Ltd. Exar cuiing eho 12/F Grand Central Plaza Tower 2 ‘orton Kowleen, Hong Keng 138 Shatin Rural Committee Road Sib sy are ase Shatin, Hong Kong SB eno weodpcrnne ‘Bit Website mmclppreupcom Attention: Mr. Dennis Luk Our ref: WE/L/241664/24-03/SKC/KLN (Scheme No.: KT-220323) Please quote our scheme number in response to this letter Dear Mr. Luk Revised Transformer Room Layouts for Anderson Road Sites R2-3 The revision of transformer room layouts for the above development has been accomplished. ‘We enclose our Drawing Nos. KT/TR/2023-026A and KT/TR/2023-027A showing the location and detailed requirements of the proposed transformer room and cable ducts for your action. You are requested to ensure that the provided transformer room should be complied in all respects with the drawing enclosed and the requirements as shown on the typical drawings in accordance with our detailed drawings of COP101 should be fully complied with. No modification will be acceptable without our prior agreement. Should you have any queries regarding the above, please contact our Mr. C. H. Ng on telephone number 2678 3672 or e-mail him at chiho.ng@clp.com.hk . Yours sincerely for and on behalf of CLP Power Hong Kong Limited S.K. Chow for Principal Manager - Planning & Design (East & West Region) Encl. as stated ske:flcat [Tformation Classification: PROPRIETARY NOTES: 1. IF THERE IS A RAMP AT THE PLANT DELIVERY ROUTE, STRUCTURAL STEEL HAULAGE LUG(S) SHOULD BE PROVIDED AND MAINTAINED BY CUSTOMER. FOR PLANT DELIVERY INSIDE TRANSFORMER ROOM, EYE BOLT(S) SHOULD BE PROVIDED. THE ACTUAL NUMBER(S) AND LOCATION(S) OF THE HAULAGE LUG(S) AND EYE BOLT(S) SHOULD BE COORDINATED AT SITE WITH CLP'S ENGINEER, NO MODIFICATION OF ACB LOCATION(S) WILL BE ACCEPTABLE WITHOUT CLP PRIOR AGREEMENT. REMARKS:— PLANT DELIVERY & BLOCK PLAN PLEASE REFER TO DRG. NO. KT/TR/2023-027 WITH THE LATEST VERSION. CUSTOMER'S SWITCH ROOM + 2. WERT LEVEL OF TRENCH AT INLET TO BE 10SOrnm MINMUM SELOW PAVEMENT LEVEL FOR HV ‘ABLES AND {080mm BELOW PAVEMENT LEVEL FOR LV CABLES. ALL CABLE TRENCHES TO BE ‘COVERED. WI Smm THICK CHEQUER PLATE & JUNCTIONS WHERE SHOWN CHAMFERED TO BE {0mm x 150mm. THE CABLE TRENCH OUTLET MUST BE FREE FROM OBSTRUCTION. STRENGTH OF 30Mpa 6 28°DAYS SHOULD BE 200mm AND TO WTHSTAND A i [lib ‘OF 7.Skp0 AND THE PLANT LOADS AS SPECIFED. FITS LAD ON. GRADE, THE-SOL, ‘BELOW SHALL BE COMPACTED TO. 95% OF THE MAKMUM DRY DENSITY" DETER IN ‘ACCORDANCE. WI BS. 1377:1880 PART 4, 4. TRANSFORMER ROOM SHALL BE CONSTRUCTED WH RENFORCED CONCRETE OR CONCRETE BLOCK’ (OF 8S GO7S PART A WH A COMPRESSNE STRENGTH OF NOT LESS THAN 20N/ma?. ERECTON SIAL BE DESGNED TO WTHSTAND A MAKMUM STAT MIT OF CUSTOMER'S Ly. ‘SWITCHBOARD, ‘SIMILAR TO DRG. NO. T=COP-10250-D-E33-0102-04-E-A OR T-COP—10250-D-E33-0102—11—A-A OR 4 X 200 DIA. HOLES FOR MCT AIR TRUNK TO BE 0.6517 IN CROSS SECTIONAL AREA| EYE BOLT FOR UFTING FAN 630 DIA. EXHAUST FAN OPEN ACCESS (NON-COVERED AREA) EMERGENCY STOP- PUSH BUTTON FOR EXHAUST FAN 1000(¥) x 800(H) STAINLESS STEELY LouvRE +198.50 a ‘T-COP=10250-D-£33-0102—12-A SECTION ALONG 630 DIA. EXHAUST FAN 12014 LAYOUT PLAN OF CUSTOMER'S SWITCH ROOM AT BASEMENT _ (SECTION ‘A'—"A’_REFER TO FF ta? 586. K1re/2023—007 wits THE LATEST VERSION) oe 500_HIGH MIN. TUNNEL FLUSH WITH CABLE TRENCH BOTTOM (SECTION ‘8'~"8" REFER TO DRG. KT/TR/2023~027 WITH THE LATEST VERSION) Fe 4 X 200 DIA HOLES FOR MCT CONNECTION, “SIMILAR TO DRG. NO. ‘T=COP—19250-D-£33-0103-04-E-A 4 X 200 DIA. HOLES FOR MCT CONNECTION, SIMILAR TO DRG. NO. ‘T-COP—10250-D-£33-0103-05-D-A (2 PLACES) 50 X 20 DEEP RECESS FOR- Kote EARTHING CONNECTION IN 3 TRANSFORMERS FOUNDATION EYE BOLT FOR LV BOARD INSTALLATION, SIMILAR TO DRG. NO. T-COP—10280-D-£33-0103-40-A (2 Places) ee 1200 DEEP ~ [CABLE TRENCH Fcapactron | L 100 X 100mm JUNCTION BOX: ‘AT_2300mm_AFFL WITH 25, METALLIC CONDUIT UP TO 100 X_ 100mm JUNCTION BOX IN TRANSFORMER ROOM 4 X 200 DIA. HOLES FOR MCT CONNECTION, ‘SIMILAR TO DRG. NO. T-COP—10250-D-E33-0103-04—E-A 800 X 800 SUMP PIT WITH HIGH. LEVEL WATER DETECTOR, PUMPING FACILITY AND REMOVABLE CONCRETE COVERS DETAILS REFER ‘T-COP—10250—D-£33-0106-04-C-A SUMP PIT es ‘CONTROL PANEL, e 0 Hace Man, TUNNEL FLusi! [wn ‘Cabue tenon BOTTOM | Ir200locee | | wales | 2600 X 2800 HIGH STAINLESS STEEL DOOR WITH WICKET AND PANIC BOLT, ‘SIMILAR TO DRG. NO. T-COP--10250-D-E33-0103-19-G-A FLOOD GATE FOR DOOR PLEASE REFER: TO T-COP—10250-D=E33-0112-01-A 1. X #100 UPVC DUCT WITH CONCRETE} SURROUND IN 1 LAYER (EARTHING 2600 X 2800 HIGH STAINLESS STEEL DOOR WITHOUT WICKET AND WITHOUT LOCK, SIMILAR TO DRG. NO. T=COP—10250-D-E33-0103-21-6-A ‘STRUCTURAL STEEL HAULAGE LUG AT ABOVE FINISH LEVEL: 300mm, 620 MILD STEEL BAR WITH INTERNAL #160 MIN. FIXING 70 THE EXTERNAL WALL STRUCTURAL ELEMENT WITH 41100 OH PARAPET wa: CONDUCTOR) EXTEND To DRAW PIT OPEN ACCESS 8 x 0180 eye, DUCTS IN 2, LAYERS (NON-COVERED AREA) M8," ele JOE ET Gre eau mere oe a), '5000kg HORIZONTAL LOAD CAPACITY AT THE END OF A # 180 DELIVERY ACCESS RAMP (1:12 MAX.), PROVIDED AND MAINTAINED BY THE BUILDING OWNER. TO DRAW PIT, DETAILS SEE ORG. Nt T-COP—10250-D-£33-0103-12-G-A) 1500 L-FL00D GATE FOR DOOR PLEASE REFER TO T=COP~10250-D-£33—0112-01-A 9630 EXHAUST FAN WITH AIR TRUNK AT HIGH LEVEL_AND 1000(W) x 800(H) STAINLESS STEEL LOUVRE AT LOW LEVEL FLOOD GATE FOR LOUVRE PLEASE REFER YO T-COP—10250-D-E33-0112-02-A ( PLACES). ‘5200 LAYOUT PLAN OF TRANSFORMER ROOM AT G/F 400 X_100mm JUNCTION BOX AT 230mm AFL. WITH 925 METALLIC CONDUIT DOWN TO 100 x 400mm JUNCTION BOX IN ‘CUSTOMER'S SWITCH ROOM #80 DRAINAGE Dil. PIPE FLUSH WITH TRENCH BOTTOM & FALL To SUMP PIT PROPOSED LOCATION OF FLOOD GATE STORAGE FRAME PLEASE REFER TO T-COP—10250-D-E33-0112-03-A-A AND THE ACTUAL LOCATION TO BE ‘AGREED WITH CLP's SITE ENGINEER (3 PLACES) 8 X 6150 UPVC DUCTS IN 2 LAYERS ‘AND ‘1 X #100 UPVC DucT IN 1 LAYER (PILOT/FIBRE_ OPTIC CABLE) WITH CONCRETE SURROUND EXTEND TO DRAW PIT,DETAILS SEE DRG. NO. T=COP—10250-D-E53-0105~i2-6-A 4. X #100 UPVe DUCT wiTH ‘GONGRETE SURROUND IN 1 LAYER (EARTHING CONDUCTOR) EXTEND To DRAW PIT 9630 EXHAUST FAN WITH AR TRUNK AT HIGH LEVEL AND 1000(W) X 800(H) STAINLESS STEEL LOUVRE AT LOW LEVEL 2600 X 2800 HIGH STAINLESS STEEL DOOR WITH WICKET AND CLP LOCK, SIMILAR TO. DRG. NO. ‘T-COP—10250-D-£33-0103-16-G-A SER, 150 X 150 THROUGH WALL OPENING WITH STAINLESS ‘STEEL COVERS (BOTH INSIDE AND OUTSIDE) AT HIGH LEVEL FOR TEMPORARY ‘SUPPLY CABLES, SIMILAR TO DRG. NO. T=COP—10250—D-E33-0103-29-C-A (Gel). TH REQUREVENT APPLY FOR DOORS, DOOR FRAMES, LOUVRES, RAT GUARDS. TERNAL [STEELWORK (AR TRUNKING, ANGERS, CHEQUER PLATE, EIC) SHALL BE HOT OP GALVANISED STEEL TO BS EN 100252004 GRADE’ S275 AND FINSHED WTH ONE COAT OF CALSIA! PLUMBATE INTEROAL WALL AT 1OQram FROM BOTH SIDES OF ALL DOORS AND AT YCOOmm ABOVE FNSHED FLOOR LEVEL +2. THE CUSTOMER'S NSTALLATON INCLUDING THE GENERAL SAFETY REQUREMENTS FOR THE ‘SMICHROOM SHALL COMPLY WITH THE ELECTRICITY ORDNANCE. 5. HOSTING SYSTEM SHALL GE ELECTRCALLY OPERATED. AN EMERGENCY LOWERNG DEVCE WH HAVONFEEL SHALL BE PROWDED. ELECTHOTTY SUPPLY SHALL BE CONNECTED TO THE NOLORO'S ESSENTIAL BOARD WITH STANDBY GENERATOR BACK UP. . THE LAYOUT DRIVING PREPARED FROM BULDNG PLANS SUBMITED. CLP POWER HONG KONG UMTED MST BE INFORMED IMMEDATELY OF ANY MODFICATONS TO THE BULDING PLANS WHICH WAY AFFECT THE. DRAWING 5. DOOR CONTACTS SHALL BE WSTALLED FOR ALL WICKET DOORS INSIDE THE TRANSFORMER ROOM. -EIRE PROTECTION REQUIREMENTS |. THIS TRANSFORMER ROOM SHALL COMPLY FULLY WIH THE. STANDARD REQUREWENTS OF HONG KONG FIRE SERVES. DEPARTMENT, FALURE TO COMPLY IN ANY RESPECT MAY RESULT WA DELAY TO THE PROVSON OF & SUPPLY. 2. THE TRANSFORMER ROOM TO BE COMPLETELY SEPARATED FROM THE REMANOGR. OF THE BULDING {NO TO BE 2 HOURS FRE RESISTANT PERIOD IN ACCORDANCE WIM 8S 476:1967. $3. AIL WALL OPENNGS TO LEAD DRECT TO OPEN AR, 4, THE 150mm Hic CONCRETE KERB, AS SHOWN, TO BE CONSTRUCTED BY CUSTOMER AFTER CLP POWER'S PLANT FAS BEEN INSTALLED AND BEFORE TRANSFORMER ROOM IS ENERGSED. ‘5. MS ROOM IS TO GE PROVED WITH FIRE EXTNGUSHING APPARATUS TO THE SATISFACTION OF THE ORECTOR OF PRE SERVICES, PORTAELE AS SHON, WL BE PROVDED {BY CLP POWER. Fx LI. ADDITONAL EQUPMENT, IF ANY, WL GE’ PROMDED 7 CUSTOMER. 6. IE AVTOMATC FRE ALARM NSTALLATON &S REQURED BY THE HONG KONG FRE SERVES DEPAEMENT, HEAT DETECTION TYPE 1S TO BE PROVDED. 7. MS-ROOM SHALL. BE INCORPORATED IN BULDNG PANS FORMALLY APPROVED BY HONG ‘KONG GOVERNMENT. NOT YET OSTANED, APPROVAL FROM THE BULDING ORDNANCE DFFice BULDNGS AND LAROS DEPARTMENT SHALL BE" OGTANED. '. ALL LINNGS FOR ACOUSTIC. AND THERMAL INSULATION PURPOSES iN DUCTINGS AND ‘CONCEALED LOCATIONS SHALL. BE OF CLASS 1 OR 2 RATE OF SURFACE SPREAD OF FLAME. ‘AS PER BRITSH STANDARD 476: PART 7 OR TS INTERNATIONAL EQUNALENT, OR BE BROUGHT ‘UP TO THAT STANDARD BY USE OF AN APPROVED FIRE RETARDANT PRODUCT ACCORDING TO THE REQUREMENT OF FIRE SERVICES DEPARTMENT. ELECTRICAL FITTINGS {ALL METAL WORK MUST BE BONDED TO THE EARTHING TERMINAL AT THE OISTRGUTION 'BORRD WH COPPER CONDUCTOR NOT LESS THAN mm. ‘ALL INTERNAL WRING TO BE PROMDED AND INSTALLED BY CUSTOMER EXCEPT THE AC. ‘SUPPLY SOURCE. pemenon wer EGR. 5A UGHTING SWITCH WITH PILOT LIGHT 5A, 2-WAY LIGHTING SWITCH WITH PILOT LIGHT D.P. EXHAUST FAN SWITCH WITH PILOT LIGHT 133A 3 PIN SOCKET OUTLET 139A FUSED SPUR UNIT C/W-D.P, SHITCH EMERGENCY STOP PUSH BUTTON FOR EXHAUST/FRESH/AKAL FAN FAN CONTROL PANEL LY MONITORING PANEL 1.2m TWN LAMPS (TB LED STANDARD TUBE WITH G5 OR G13 BI-PIN (AP BASE) TO BE FIED ON WALL AT Zim ABOVE FLOOR LEVEL 1.2m TWN LAMPS (8 LED STANDARD TUBE WTH G5 OR G13 BI-PIN CAP BASE) TO BE SUSPENDED AT 2.8m FROM FLOOR LEVEL 2m TWN IMPS (TB LED STANDARD TUBE WTH G5 OR G13 BI-PWN CAP BASE) TO BE FED ON WALL AT 2.1m: ABOVE FLOOR LEVEL WTH ERGENGY Loin UNT {2m TWH FLUORESCENT LAVPS (TB LED STANDARD TUBE WT GS OR 13 BPN CAP BASE) 10 BE SUSPENDED AT 28m FROM FLOOR LEVEL WOH EMERGENCY UGHTNG UNIT BT SIGN BOARO ABOVE DOOR ~ ELECTRICITY SUPPLY TO BE CONNECTED TO THE LANDLORD'S ESSEMTAL BOARD WITH STANDBY GENERATOR BACK UP 454g 00 BE Bor YE BOLT FOR SAFETY HARNESS AT 17DOrnm FROM FLOOR LEVEL, DDETALS SEE DRG. NO. COP—10250-D-E35-O103-37-A YE BOLT AT HIGH LEVEL/CELING FOR LFTNG FAN FLOOONG ALARW FLASH UGH PLASTIC GN STORAGE BOX DETALS SEE ORG. NO, ‘F-00P10250-D-£35-0105-27-8 [METALUC CONDUT STSTEM FOR ACCESS CONTROL SHOULD GE PROMDED (CHECKED BY: CHAN KUEN. 05—MAR~2024 DRAWING TITLE : PROPOSED LAYOUT OF TRANSFORMER ROOM FOR ARQ SITE R2-3 SCALE: 1 : 50 (mm) | PROJECT NO. 1220323 DRAWING No..: KT/TR/2023-026A PROPRIETARY] ALL RIGHTS RESERVED AND REPRODUCTION IN ANY FORM MUST BE APPROVED BY CLP POWER ‘CAPACITY AT THE END OF: A. DELIVERY \. ACCESS RAMP (T312_MAX.), PROVIDED AND INTAINED BY THE” BUILD! / —~ BLOCK PLAN & DUCTING SYSTEM AT_G/F. sous 1:300] VEHICULAR 24HRS FREE ACCESS MINIMUM REQUIREMENTS: LORRY DIMENSION TURNING RADIUS OF VEHICULAR : HEADROOM FOR LOADED LORRY MOVEMENT : 4.6M HEADROOM -FOR UNLOADING AREA WEIGHT FOR THE LOADED LORRY WEIGHT FOR THE 2MVA TRANSFORMER PLANT DELIVERY ACCESS 55M + 9000kg 1 SM(W) x 2.8M(H) :11.5M(L) X 2.7QW) 2 10M LOADING & UNLOADING AREA \ Bee ig a HAULAGE LUG AT ABOVE*FINIS! a LEVEL 300nh

You might also like