You are on page 1of 9
CLP@ +z Cie Pomer Hine Hong ited AnD Sg tong tite sam En wecteron ‘AECOM Asia Co. Ltd. PRAMERRSE— REWER 12/F Grand Central Plaza Tower 2 Soren Roweon fg on, 138 Shatin Rural Committee Road Now tents Shatin, Hong Kong ER Fox B52) era 337 Eo erat ween Bi inode ogeepcom Attention: Mr. tor Suen/ Mr. Dennis Luk Ourref.: WE/L/231988/23-04/SKC/CHC (Scheme No.: KT-220323) Please quote our scheme number in response to this letter Your ref: VS:DL:ch: 60619165/ 2023000431M Dear Mr. Suen / Mr. Luk Transformer Room Layouts for Subsidized Sale Flats Development at Anderson Road Quarry Sites R2- The design of transformer room for the above development has been accomplished. We, CLP Power Hong Kong Limited, (“CLP”) enclose our Drawing Nos. KT/TR/2023-026 and KT/TR/2023-027, showing the locations and detailed requirements of the proposed transformer room and cable duct systems for your action. Please ensure that the location, design and construction of the transformer room should comply with all the related statutory requirements in Hong Kong. You are also requested to ensure that the requirements as shown on the typical drawings in accordance with our detailed drawings of Code Of Practice 101 (“COP 101”) version 15 should be fully complied with. The updated drawings in our COP 101 version 15 can be obtained from this Company's web site. No modification will be acceptable without our prior agreement. To enable site construction work to be carried out safely and effectively in order that power supply could be provided by the target date, you are required to provide the following: - + A 30-Ampere temporary electricity supply to the transformer room with proper mechanical protection on the electrical cables for the plant testing. + A-hard shelter or cover on top of the transformer room door to protect site personnel from falling objects. + A reasonable vehicular and personnel access to the transformer room for loading and unloading of apparatus and testing equipment. information Classification: PROPRIETARY CLP@) rz Cont. Page 2 of 4 Our ref.: WE/L/231988/23-04/SKC/CHC (Scheme No.: KT-220323) + Holes along the walkway to the transformer room must be backfilled or properly fenced off. + A proper and robust access where there is a major level difference between the transformer room entrance and the outside areas. + If draw pit and ducting system is required to be installed by customer for provision of power supply, please refer to the attached Drawing No. T-COP-10250-D-E33- 0104-17-A for the uPVC pipe connection socket details. All cable duct entries including those leading to manhole, draw pit, tunnel, bridge, substation, chamber and cable trough shall be sealed up as soon as the cable ducts have been installed Empty ducts shall be sealed up by watertight duct plug. The ducts installed with cables shall be sealed by cement sand. Enough and excess length of cable draw wires shall be provided, and properly coiled insides the both ends of the cable duct. The draw pit and ducting system shall be properly tested, fully handed-over to and accepted by our responsible engineer. No external decorative louvers should be installed, affixed or attached outside the transformer room without the prior written approval of CLP for safety reasons. All coatings for the proposed decorative louvre shall be fire retardant and with fire resistant non-toxic paint. The weight and the installation or fixing method of such decorative louvers must be certified by your Authorized Person that such decorative louvers will not impose hazards to our operation staff and the general public. You are required to provide fitting provisions for the installation of the substation nameplate, danger warning notice, etc. in a conspicuous location of the decorative louvers and also to make sure that their display shall not be covered or obstructed at all times. For further details of the requirements of the fitting provisions, please refer to COP 101. The Authorized Person shall also submit the design of such decorative louvers to the Buildings Department for approval. You are required to provide the final transformer room drawings including any external decorative louvres approved by Buildings Department for our checking and record when the transformer room is handed over to CLP. If and after decorative louver(s) are installed, affixed or attached outside the transformer room, the registered owner(s)/building manager {if any) of the Development shall be responsible for their repair and maintenance. Annual inspection of the decorative louver(s) shall be carried out by an independent and competent person to confirm its/their safety to our operation staff and the general public. Any decorative louver installed at any time without the prior agreement of CLP and/or not in compliance with CLP’s requirements must be removed immediately if CLP so requires. Bone Information Classification: PROPRIETARY CLP@ +z Cont. Page 3 of 4 Ourref.: WE/L/231988/23-04/SKC/CHC (Scheme No.: KT-220323) You are required to notify us in writing of the target date by which permanent electricity supply is to be made available. This information together with a duly completed ‘Application for Electricity Supply Form’ for the owner's installation must be submitted to CLP at least three (3) months before the target date. As we require such notification to ensure that relevant plant materials are available and that the project relating to the Development is included in our forward work programming system, failure to comply with this particular condition may result in delay in power supply and CLP shall not be responsible for such delay whatsoever. To afford timely provision of power supply connection/disconnection to your premises, you may be requested to modify and/or remove, at no cost to CLP, your hoarding structure and/or any obstructions such as debris, materials stacking, scaffolding, site facilities, etc. under your custody to make way for our trench excavation work, cable installation work and the delivery or removal of plant and equipment from the transformer room within your premises and/or your hoarding areas along your site boundary, if deemed necessary. AAs the transformer room and low voltage switch room located on the Development may also be affected in the event of a flood arising from extreme weather conditions, you are required to take precautionary measures to safeguard against damages that may be done to the transformer room and low voltage switch room. In addition, you are required to ensure that suitable accommodation and facility should be provided for the necessary metering equipment as per the requirements set out in the ‘Guide to Supply and Metering Arrangement on Customer's Internal Distribution System’ which is available at CLP Website (www.clp.com.hk). You are also required to submit 1 set of typical layout plan(s) indicating the personnel access route to meter room(s) for our reference (Refer to address in the attached leaflet). You are recommended to install over- current relay with flexible operating characteristics (extremely inverse or standard inverse) which comply with International Electrotechnical Commission ("IEC") standard to protect your incoming circuit breaker, For your further information, if you intend to install Electric Vehicle (EV) charging facilities in the Development, you are required to include the EV load demand in your total load estimation. You can also refer to “Standard Metering Arrangement for Electric Vehicle (EV) Charging Facilities for Car Parks of New Building Developments wi available at CLP Website (www.clp.com.hk}. This guide provides some general technical references for standard metering arrangement in the design of electrical installation for EV charging facilities to meet with CLP requirements. If you are interested in or have any questions regarding the meter installation of EV charging facilities in the Development, please contact our Mr. Kelvin Pun on telephone number 2678 7426, af. Information Classification: PROPRIETARY CLP@ +z Cont. Page 4 of 4 Ourref.: WE/L/231988/23-04/SKC/CHC. (Scheme No.: KT-220323) We would also like to advise that your electrical installation, especially those equipment with electronics or computerized control, may be sensitive to Power Quality (“PQ”) issues like voltage dips which may lead to their malfunctioning. Some examples of commonly encountered equipment power quality problem and their solutions are illustrated in ‘Power Quality Handbook’ which is available at CLP Website (www.clp.com.hk). Tips to avoid these problems effectively at the planning stage are also provided. Attached please find the sample of ‘Reply Slip for Customer Design on Voltage Dip Ride-through and Harmonics Emission’ for the upcoming PQ planning ahead meeting with your respective engineer as required. You should return it to us within a month after the meeting. If you need further formation on PQ, please contact our Mr. Sam Chan on telephone number 2678 6116. This letter does not constitute our offer of supply. Our Con sent to you in due course. ion Letter for Supply will be Should you have any queries, please contact our Mr. Leo Chow at 2678 3670 or email him at leo.chow@clp.com.hk Yours sincerely for and on behalf of CLP Power Hong Kong Limited OF S. K. Chow for Principal Manager - Planning & Design (East & West Region) Encl. as stated skeghemf [ information Classification: PROPRIETARY [Uncontrolled Copy : This printout is printed from ‘aby ons 02 November 2021. Please always refer to the col REMARK {= THICKNESS OF uPVC PIFE THICKNESS OF THE STOPPER EDGE OF SOCKET Hw HEIGHT OF THE STOPPER EDGE OF SOCKET HICKNESS OF APVC PIPE CONNECTING SOCKET EDGES OF BOTH END: fe 4 ssockeT Z TO BE ROUNDED OFF / rerealt \ \ } | | | od t/t 4 { Jy Lg | on > ' uPve PPE COUPLING ARRANGEMENT ‘SECTIONAL ELEVATION OF SOCKET (607 10 (wor To S042) PIPE SIZE DIMENSION (rm) BOE a el fer earl TWPE_A 700 v6 | 08 | «0 | 7 [3 | 3 TYPE 8 150, 168 [159 | «5 [20 | « | 9 TYPE C, 200 26 | 216 | 50 | 260] 5 | 5 Notes 1. MATERIAL « UNPLASTICIZED PC TO BS 3508 CLASS 8 2. TOLERANCE :INNER & OUTER DIAMETER OF SOCKET + 0.6% ‘ALL OTHER OMENSION = 2% 2. ALL DIMENSIONS ARE IN mim TYPICAL DETAILS OF uPVC PIPE CONNECTING SOCKET SCAERTS SHEETISN N SET 4 ASSET MANAGEMENT [map Zoo area Ta THPORUATTON CLASS: PROPRIETARY aa Reply Sip for Customer Desians on Voltage Dip Ride-thry and Harmonics Emission Please filin the following table and return to SEB /TSD / CLP by fax at 2678 6000 or email to samch chan@clp com.hk / Joy chan@cp.com hi within a month atte the date ofthe letter. Project Name ‘Transformer Room Layouts for Subsidized Sale Flats Development at Anderson Road Quarry Sites R2-3 Note: Consultant shall inform project cower regarding voltage dip ride-thru and harmonic emission requirements Planned commissioning date: Tetual Design Equipment Component enone | _(7o be filed up by consultant / customer) Lover" Viable Solution [Lever ‘Approach ‘Server or central computer ' Tiue online UPS Distibuted digital control (DDC) Contos, relays, main in | BC supply, AC supply with contacter battery-ess UPS Battey-iess UPS. Changeover Sapane Underage) ae | i 1 | rasa anos AH, te waar 1 | eateries ves chit Pant ll | _— coe wy) EMS autoventart or parecer available Braking system | Ewsp cop Escalator 7 pe 7 Controls | Batterytess UPS Electronic ballast, CWA, Hot re strike ignte for indvicual lam Ballast na DHigh intensity Discharge Lamp UPS, Vottage cip compensator for ‘Add-on protection Mw Pl 5 8 group of amps ir | EMSD COP (Postvottage-cip ‘peration) our Controls 1 High power vot ip compensator sensitive Medical equipment, Lavin | UPS. Voltage conditioner, Auto Machine Controls, PLC re-start logic Server or computer ' True oniine UPS Telecom, IT a Equipment, Petioherals such as, vn | UPS.batteryless UPS, Power- Data Centre & | modem, router 5 loss auto restart | Harmonic Harmonic emission NA. | Harmonic fiter | Digital elay with Nexile OC NA | (SIEN charactestic setting Main Incoming Cieut Breaker Load forecasting for ar- DAiccandiioners NA | Reserve load margin acai | conditioning ioad Residential Window Sait ype Air Bulling ‘conditioner with buttin unde voltage release devices NA Findow /Spit tye Air I ‘conditioner with variable speed rive Type of Airconeitioner Information Classification: PROPRIETARY 1 Buiings with high penetration of energy efficient ‘equipment. eg LeDignting, VsDAIr Conditioner, ard ‘other nonlinear toads et Harmonic emission NA Installation of harmonic fiter ‘Reserve location and spare way ‘of MCC for installation of NA harmonic ter Installation of deta/star or doltadelta transformer Renewable Energy. 29. photovoltaic or wind ‘energy system etc. Inverter, controls ive online UPS Inverter with votage dips ride. through capabilty / fut the requirement of EN61000-4-11/34 ‘System with auto restart logic Harmonic emission Installation of harmonic iter Harmonie emission from renewable energy system is. complied with supply rule JEMSD's requirement Reserve location and spare way of MCCB for installation of harmonic fer DEV charger system ‘Submitted by Project Owner ‘True online UPS. Fut the requirement of EN61000-4-11/34 System with auto restart logic ‘smart charging system (eg. load ‘management system) True online UPS. Foil the requirement of EN81000-4-11/34 Harmonic emission Company Installation of harmonic ter Harmonic emission from EV charger is complied with supply tule FEMSD's requirement | Reserve location and spare way ‘of MCCB for installation of harmonic fiter Tove Level! —tuly protected, Lovell ~ pamtaly protected ,Lovel I~ auto e-stat or backup For other equipment, please submit addtional sheet or contact us on 2678 6116 / 2678 7518 (13 Mey 2021) Information Classification: PROPRIETARY NOTES: IF THERE IS A RAMP AT THE PLANT DELIVERY ROUTE, STRUCTURAL STEEL HAULAGE LUG(S) SHOULD BE PROVIDED AND MAINTAINED BY CUSTOMER. FOR PLANT DELIVERY INSIDE TRANSFORMER ROOM, EYE BOLT(S) SHOULD BE PROVIDED. THE ACTUAL NUMBER(S) AND: LOCATION(S) OF THE HAULAGE LUG(S) AND EYE BOLT(S) SHOULD BE COORDINATED AT SITE WITH CLP’S ENGINEER. CUSTOMER'S REMARKS:— SWITCH ROOM PLANT DELIVERY & BLOCK PLAN PLEASE REFER TO DRG. NO. KI/TR/2023-027 WITH THE LATEST VERSION. ‘LIF IIS A SUSPENDED SLAB, THE MMIMUM THICKNESS OF RENFORCED CONCRETE WTH MIN, IN 28DAYS SHOULD BE 200mm AND TO WIKSTAND A SUPERMPOSED +193.05 ‘DENSITY DETERMINED (OF BS 6075 PART A WTH A COMPRESSNE STRENGTH OF NOT LESS THAN 20N/ma. ERECTION SHALL GE DESIGNED TO WITHSTAND A MOIMUM STATIC LUMIT OF CUSTOMER'S Lv. ‘SWITCHBOARD, SIMILAR TO DRG. NO. ‘T-COP-10250-D~E33-0102-04-E-A OR T-COP—10250—D-£33-0102-11-A-A OR T-COP—10250-D-£33-0102—12-A Re 71 © B0Ur FoR = : f LIFTING FAN : . XZ 4X 200 DIA HOLES FOR MCT CONNECTION, SIMILAR TO DRG. NO. ‘T—COP~10250-D-E33-0103-05-D-A (2 PLACES) AIR TRUNK TO BE 0.650? IN CROSS SECTIONAL AREA 100. X 100mm JUNCTION. BOX AT 2300mm AFFL WITH #25, METALLIC CONDUIT UP TO 100 i X_ 100mm “JUNCTION BOX: IN TRANSFORMER ROOM 630 DIA EXHAUST FAN 4 X 200 DIA. HOLES FOR MCT CONNECTION, SIMILAR TO DRG. NO. T=COP—10250-D-E33-0103-04-E-A ‘STEELNORK (AR TRUNKING, HANGERS, CHEQUER PLATE, ETC) ‘SHALL BE” HOT DIP GALYANSED ‘STEEL TO BS EN 10025:2604 GRADE'S27S AND FINSHED WH ONE COAT OF CALCIUM PLUMBATE PRIMER AND TWO FISHED COATS OF GREY SINTHENC PANT. DETALED ARRANGEMENT OF CABLE TRAY FOR INSTALATON OF INTERNAL WRING AND (CONTROL. WIRING TO BE OETERWNED ON STE. EMERGENCY stop—J | PUSH BUTTON FOR EXHAUST FAN 1o00(W) x 800(H) ‘STAINLESS STEEL ™ LOUVRE cag 198.65 Hee | SECTION ALONG 630 DIA. EXHAUST FAN ween be 12014 LAYOUT PLAN OF CUSTOMER'S SWITCH ROOM AT BASEMENT 2. THE TRANSFORWER ROOM TO BE COMPLETELY SEPARATED FROM THE REUANOER OF THE BULDNG ‘AND TO BE 2 HOURS FIRE RESISTANT PERIOD IN ACCOROANCE WIH BS 476:1967 3. AIL WALL OPENS TO LEAD ORECT TO OPEN AR. 4, THE 150mm HIGH CONCRETE KERB, AS SHON, TO BE CONSTRUCTED BY CUSTOMER AFTER CLP PPOWER'S PLANT HAS BEEN NSTALLED AND BEFORE TRANSFORUER ROOM IS ENERGSED. ‘5. THS ROOM 1S TO BE PROVIDED WTH FRE EXTINGUSHNG APPARATUS TO THE SATISFACTION OF THE ORECTOR OF FRE SERVICES. PORTIBLE ), AS SHOWN, WLL BE PROMDED {BY CLP POWER HX LTD. ADDTONAL EQUEPENT, IF ANY, Wil. BE PROVED BY’ CUSTONER, 6, IF MJTOWANC FRE ALARM INSTALLATION IS REQURED BY THE HONG KONG FRE SERVICES ‘OEPARIMENT, HEAT DETECTON TYPE IS TO BE PROMDED. 7. THS ROOM SHALL. BE INCORPORATED WY BUILDNG PLINS FORWALLY APPROVED BY HONG KONG GOVERNWENT. IF NOT YET OBTANED, APPROVAL FROM THE BULDNG ORDNANCE COFFE, BUILDINGS AND LANDS DEPARTMENT SHALL BE OBTANED. 8. ALL LINNGS FOR ACOUSTIC AND THERMAL INSULATION PURPOSES IN. DUCTINGS. AND (CONCEALED LOCATONS SHALL BE OF CLASS 1 GR 2 RATE OF SURFACE SPREAD OF FLAME {AS PER BRITSH STANDARD 478: PART 7 OR ITS INTERNATIONAL EQUNALENT, OR BE BROUGHT (UP TO THAT STANOARD BY USE OF AN APPROVED FIRE RETARDANT PRODUCT ACCORDING TO THE REQUREMENT OF FRE. SERVICES. DEPARTMENT. ELECTRICAL FITTINGS {ALL METAL WORK MUST SE BONDED TO THE EARTHING TERMINAL AT THE OITREUTION ‘BOARD WITH COPPER CONDUCTOR NOT LESS THAN Gr, 2. UL Wine TBE PRHDED MO NEALED BY CUA XT THE AE See tc na. DISTRIBUTION UNIT LEGEND ove samen wmi PLOT Loa 5A 27 UORTNG SW WTA PLOT Uk OP. BUST Fa SAME WH PLOT HT 134 3 PM sooner oot ‘3A FUSED SPUR UNIT C/W D.P. SWITCH EMERGENCY STOP PUSH BUTTON FOR EXHAUST/FRESH/AXIAL FAN FAN CONTROL PANEL UY NoNTORNG PANEL 1.2m TWN LAPS (78 LED STANDARD TUBE WITH GS OR G13 BI-PA (AP BASE) TO BE FIED ON WALL AT 2.1m ABOVE FLOOR LEVEL (SECTION ‘B'-"B' REFER TO DRG. KT/1R/2023-024 WITH THE LATEST VERSION) Fe '500_HIGH MIN. TUNNEL | 4 x 200 DIA. HOLES FOR MCT FLUSH WITH CABLE CONNECTION, ‘SIMILAR TO DRG. NO. T=COP—10250-D-E33-0105-04—E-A (SECTION "A'="A’ REFER TO DRG. KT/TR/2023—024 WITH THE LATEST VERSION) 3250 + 800 X 800 SUMP PIT WITH HIGH LEVEL WATER DETECTOR, PUMPING FACILITY AND REMOVABLE CONCRETE COVERS DETALS REFER ‘T-COP~10250-D-E33-0106-04—C-A SUMP PIT , CONTROL PANEL ee 100 X_100mm JUNCTION BOX AT. 2300mm AFFL WITH $25 METALLIC CONDUIT DOWN.TO 100 x 00mm JUNCTION BOX IN CUSTOMER'S SWITCH ROOM 1200 DEEP CABLE TRENCH #80 DRAINAGE D.l. PIPE FLUSH WITH TRENCH BOTTOM é FALL lr200loer || TO SUMP PIT 4 X 200 DIA. HOLES FOR MCT. CONNECTION, ‘SIMILAR TO DRG. NO. T-COP-10250-D-E33-0103-05-D-A (2. PLACES) 50 X 20 DEEP RECESS FOR- EARTHING CONNECTION IN 3 ‘TRANSFORMERS. FOUNDATION EYE BOLT FOR LV BOARD. INSTALLATION, SIMILAR TO DRG. NO. ‘T-COP-10280-D-E33-0103-40-A (2 PLACES) 1200 DEEP S|, LE TRENCH) Hae an, Tuner eLusil | WITH ‘CABLE TRENCH BOTTOM | ieee 5 Panes MLL PROPOSED LOCATION OF FLOOD GATE STORAGE FRAME PLEASE REFER TO —COP=10250-D—E35~—0112-03-A-A AND THE ACTUAL LOCATION TO BE AGREED WITH CLP's SITE ENGINEER (3 PLACES) 8 X #150 UPVC DUCTS IN 2 LAYERS AND 1 X #100 UPVC DUCT IN 1 1.2m TWA LAMPS (TB LED STANDARD TUBE WITH G5 OR G15 BI-PI ‘AP BASE) TO BE SUSPENDED AT 2.8m FROM FLOOR LEVEL 12m TWN LAMPS (18 LED STANDARD TUBE WITH GS OR C13 I-AA (GAP BASE) TO BE FVED ON WALL AT 2-1m ABOVE FLOOR LEVEL WT BVERGENCY LIGHTING UNT {.2m TWIN FLUORESCENT LAMPS (1B LED STANDARD TUBE WITH G5 OR 3 B-PIN CAP BASE) TO BE SUSPENDED AT 2.8m FROM FLOOR LEVEL ‘WH EMERGENCY LIGHTING UNIT [BAT SIGN BOARD ABOVE OOOR — ELECTRICITY SUPPLY TO BE CONNECTED TO ‘THE LANDLORD'S ESSENTAL BOARD WT STANDBY GENERATOR BACK UP 4.5kq 00s Ere Bout YE BOLT FOR SAFETY HARNESS AT 1700hrm FROM FLOOR LEVEL, DEIALS SEE DRG. NO, COP-10280-0-£55-0108-57-A (YE BOLT AT HIGH LEVEL/CELING FOR LIFING Fad FLOODING ALARM FLASH UT — ne LAYER (PILOT/FIBRE OPTIC CABLE) Witte Se eo Geer aN, oT Sieit canis soni ra oe oem on eee t PB EMS 9 SON Seas mo SL es coro, oc Fo ; ppb PUSTIC OHNN STORNGE BOX DETALS SEE DRG. NO. ¥-COP-10250-D-ES5-0109-27-4 6 Bet R70 150 X 150H. J Dat tt eRe iH rt Ht 1 i 1 DESCRIPTION PLANNING AND DESIGN e 4X @100 UPVC DUCT WITH ot CONCRETE SURROUND IN 1 LAYER (EARTHING CONDUCTOR) EXTEND To DRAW PIT 2600 X 2800 HIGH STAINLESS STEEL DOOR WITH WICKET AND PANIC BOLT, ‘SIMILAR TO DRG. NO. T-COP—10250-D-E33-0103-19-G-A FLOOD GATE FOR DOOR PLEASE REFER TO T-COP-10250-D-£33—0112-01-A 2600 X 2800 HIGH STAINLESS STEEL DOOR WITHOUT WICKET AND WITHOUT LOCK, SIMILAR TO DRG. NO. ‘T—COP=10250-D-E33—0103-21—G-A 650 EXHAUST FAN WITH AIR TRUNK AT HIGH LEVEL AND 1000(W) x 800(H) STAINLESS STEEL LOUVRE AT LOW LEVEL 11-APR~2023 00D GATE FOR DOOR PLEASE REFER TO ‘T-COP-10250-D-E33-0112-01-A 1. X 9100 UPVC DUCT WITH concrETE+ ‘SURROUND IN 1_LAYER (EARTHING CONDUCTOR) EXTEND TO DRAW PIT 2600 X 2600 HIGH STAINLESS STEEL DOOR WITH WICKET AND CLP LOCK, SIMILAR TO DRG. NO. T-COP~10250-b-E33-0103-16-G-A 150 X_150 THROUGH WALL OPENING WITH STAINLESS STEEL COVERS (BOTH INSIDE AND QUTSIDE) AT HIGH LEVEL FOR TEMPORARY SUPPLY CABLES, SIMILAR TO DRG. NO. T-COP—10250-D-E33-0103-29-C-A DRAWING TITLE : PROPOSED LAYOUT OF TRANSFORMER ROOM FOR ARQ SITE R2-3 CESS OPEN. ACI 8 X #150 UPVC DUCTS IN 2 LAYERS-+ (NON-COVERED AREA) Ano "x #100 upve bucr Nt LAYER (PILOT/FIBRE OPTIC CABLE) WITH (CONCRETE. SURROUND EXTEND TO DRAW fll, DETALS. SEE DRG. NO. Tecapa250-b-238-0105-13-0-A 5200 9650 EXHAUST FAN WITH AIR TRUNK AT HIGH LEVEL AND. 1000(W) x 800(H) STAINLESS STEEL LOUVRE AT LOW LEVEL +198.50 7360 PROJECT NO. 1220323 KT/TR/2023-026 PROPRIETARY] ALL RIGHTS RESERVED AND REPRODUCTION IN ANY FORM MUST BE APPROVED BY CLP POWER LAYOUT PLAN OF TRANSFORMER ROOM AT G/F DRAWING No. : VEHICULAR 24HRS FREE ACCESS MINIMUM REQUIREMENTS:— LORRY DIMENSION TURNING RADIUS OF VEHICULAR HEADROOM FOR LOADED LORRY MOVEMENT HEADROOM FOR UNLOADING AREA WEIGHT FOR THE LOADED LOF WEIGHT FOR THE 2MVA TRANSFORMER PLANT DELIVERY ACCESS 3 11.5M(L) X 2.7M(W) 210M 246M LOADING & UNLOADING AREA [-e Ic aa +—PLANT DELIVERY WITH 3000mm(W) X 2800mm(H) {[=TO WITHSTAND 9000kg BY MANUALLY METHOD ree PT ISTOMER'S. |f" ELOW IPROPOSED TK IRM. AT G/F BLOCK PLAN & DUCTING SYSTEM AT G/F soue 1.300 1200 DEEP_DRAW PIT. WITH REMOVABLE .C. COVERS REFER TO DRG. NO. ‘T-GOP-10250-D-E33-0104-07-H-A 1200 DEEP DRAW PIT WITH_REMOVABLE R.C, COVERS REFER TO DRG. NO. T—COP—10250-D~E33-0104—06-G-A Nos. OF #150 UPVC DUCTS IN 2 LAYERS WITH CONCRETE SURROUND, DETAILS SEE DRG. NO. 7 T-COP=10250-D-E33~-0103—12-G-A Nos. OF #200 UPVC DUCTS IN 2 LAYERS WITH CONCRETE SURROUND, DETALS SEE DRG. NO. ‘T-COP—10250-D-E33-0103-12-G-A Nos. OF 6100 UPVC DUCTS WITH CONCRETE ‘SURROUND IN 1 LAYER (PILOT/FIBRE OPTIC. CABLE) OR 2 LAYERS (1 X EARTHING CONDUCTOR AND 1 X PILOT/FIBRE OPTIC CABLE) TRANSFORMER ROOM ea CT 1 1200 peep! CABLE TRENCH | | MULTI=CABLE. TRANSIT PLUGIN: (M.C.T.) j—-—STEEL RACK CUSTOMER'S: ‘SWITCH ROOM +-2000 HIGH BAK PAE il EARTHED METAL i COVERING/TRUNKING on To BE PROVIDED Sic BY CUSTOMER FOR Boao PROTECTING. SINGLE ne ‘CORE. CABLES “ANY SUPPORTING FRAMEWORK. AT TH 11200 _DEEP: FACILITATE CABLING WORK SECTION A-A SCALE 1:50 NOTES: IF THERE IS A RAMP. AT THE PLANT DELIVERY ROUTE, STRUCTURAL STEEL HAULAGE LUG(S) SHOULD BE PROVIDED AND MAINTAINED BY CUSTOMER. FOR. PLANT DELIVERY INSIDE TRANSFORMER ROOM, EYE BOLT(S) SHOULD BE PROVIDED. THE ACTUAL NUMBER(S) AND LOCATION(S). OF THE HAULAGE LUG(S) AND EYE BOLT(S) SHOULD BE COORDINATED AT SITE WITH CLP'S ENGINEER. REMARKS:— TRANSFORMER ROOM LAYOUT PLEASE REFER TO DRG. NO. WS/TR/2023-026 WITH THE LATEST VERSION. TRANSFORMER ROOM $198.65, 1200 DEEP CABLE TRENCH {——{—STEEL RACK t MULTI-CABLE TRANSIT: x PLUG-IN (M.C.T.) +-2000 HIGH ‘DevACHABLE— i EARTHED METAL BACK PLATE i COVERING/TRUNKING = H PROVIDED CUSTOMER'S ‘SWITCH ROOM x ‘CUSTOMER, “ANY SUPPORTING FRAMEWORK AT. THE 1200 DEEP. 4 ; MAIN CIRCUIT BREAKER eee . / ‘COMPARTMENT MUST BE DETACHABLE. TO FACILITATE. CABLING WORK SECTION B-B SCALE 1:50 DESCRIPTION PLANNING AND DESIGN mae: [LL 202 owe WA /aox. ‘DATE : 11-APR-2023 DRAWING TITLE BLOCK PLAN & DUCTING SYSTEM FOR ARQ SITE R2—-3 ‘SCALE: N.S. PROJECT NO. KT220323 eee KT/TR/2023-027 PROPRIETARY] ALL RIGHTS RESERVED AND REPRODUCTION IN ANY FORM MUST BE APPROVED EY CLP POWER

You might also like