You are on page 1of 8

Multiple Question for DCD cases.

1 What is gross weight in casting 11


a) Net Weight+Burning loss% X casting Weight a)
b) Cast Weight+Burning loss% X casting Weight b)
c) Shot Weight+Burning loss% X casting Weight c)
d) Scrap weight+Burning loss% X casting Weight d)

2 Yield %age is calculated by 12


a) Casting Weight/Shot Weight a)
b) Shot Weight/Casting weight b)
c) Net Weight/Casting Weight c)
d) Casting Weight/Net Weight d)

3 What is the Fixed cost allocation method in business case 13


a) On RMC a)
b) On RMC+Variable b)
c) On Variable c)
d) On Sale Price d)

4 what is DBK benefit in costing 14


a) Display Book a)
b) Data Bank b)
c) Developing Business Knowledge c)
d) Duty Drawback Scheme d)

5 Capex calculation is done on 15


a) Peak Volume a)
b) Average Volume b)
c) Low Volume c)
d) Initial Volume d)

6 Which die casting manufacturing is not available in Minda facility 16


a) High pressure die casting a)
b) Low pressure die casting b)
c) Gravity die casting c)
d) Investment die casting d)

7 Contribution is 17
a) (Revenue - Variable cost)/Revenue a)
b) ( Variable cost-Revenue)/Revenue b)
c) ( Variable cost-Revenue)/Variable Cost c)
d) (Revenue - Variable cost)/Variable Cost d)

8 Which is not indirect cost 18


a) Material a)
b) Rent b)
c) Utility c)
d) Insurance d)

9 Which is not part of MHR 19


a) Direct wages a)
b) Indirect Wages b)
c) Power and fuel c)
d) Consumable cost. d)

10 What is the manufacturing Overheld 20


a) Power, fuel, consumables etc. a)
b) Direct manpower cost b)
c) Indirect Manpower cost c)
d) None of the above d)
Total RMC included below contents
RMC +packaging +Fright
RMC +packaging +Rejection
RMC +packaging +ICC
None of the above

What is is variable cost


Direct & Indirect Wages
Direct & Indirect Wages
Staff Salary
All of the above

What is the contribution


Sale price-RMC-Variable cost
Sale price+RMC-Variable cost
Sale price-RMC-Fixed cost
Sale price-RMC+Fixed cost

What is Top line meaning in Financial term


Sale Value
Total purchase value of company
Monthy Sale value
Yearly sale value

Machine tonnage calculation formula for sheet metal parts


Total Circumference*thickness*Shear strength/1000
Total Circumference*thickness*tensile strength/1000
Total Volume*thickness*tensile strength/1000
None of the above

For better financial condition of business case NPV should have


less Pay back year
High Pay back year
Not related to payback
NPV high

Interest rate on Working Capital Loan as per latest guideline


7.75%
9%
7.50%
None of the above

What is BOM in RMC ?


Bulk of materials.
Bill of materials.
Business of money.
Business of office management.

PAT stand for ?


Process Analytical technology
Profit After Tax
Process Analytical technique
Portable appliance testing

Which head doesn't come in MHR ?


Labor cost
Consumables.
Interest
Tax.
Multiple Question for DCD cases.

1 What is gross weight in casting 11


a) Net Weight+Burning loss% X casting Weight a)
b) Cast Weight+Burning loss% X casting Weight b)
c) Shot Weight+Burning loss% X casting Weight c)
d) Scrap weight+Burning loss% X casting Weight d)

2 Yield %age is calculated by 12


a) Casting Weight/Shot Weight a)
b) Shot Weight/Casting weight b)
c) Net Weight/Casting Weight c)
d) Casting Weight/Net Weight d)

3 What is the Fixed cost allocation method in business case 13


a) On RMC a)
b) On RMC+Variable b)
c) On Variable c)
d) On Sale Price d)

4 For better financial condition of business case NPV should have 14


a) less Pay back year a)
b) High Pay back year b)
c) Not related to payback c)
d) NPV high d)

5 Capex calculation is done on 15


a) Peak Volume a)
b) Average Volume b)
c) Low Volume c)
d) Initial Volume d)

6 Which die casting manufacturing is not available in Minda facility


a) High pressure die casting
b) Low pressure die casting
c) Gravity die casting
d) Investment die casting

7 Contribution is 1
a) (Revenue - Variable cost)/Revenue a)
b) ( Variable cost-Revenue)/Revenue b)
c) ( Variable cost-Revenue)/Variable Cost c)
d) (Revenue - Variable cost)/Variable Cost d)
8 What is BOM in RMC ? 2
a) Bulk of materials. a)
b) Bill of materials. b)
c) Business of money. c)
d) Business of office management. d)

9 Which is not part of MHR 3


a) Direct wages a)
b) Indirect Wages b)
c) Power and fuel c)
d) Consumable cost. d)

10 Which head doesn't come in MHR ?


a) Labor cost
b) Consumables.
c) Interest
d) Tax.
What is BOM in RMC ?
Bulk of materials.
Bill of materials.
Business of money.
Business of office management.

What is is variable cost


Direct & Indirect Wages
Direct & Indirect Wages
Staff Salary
All of the above

What is the contribution


Sale price-RMC-Variable cost
Sale price+RMC-Variable cost
Sale price-RMC-Fixed cost
Sale price-RMC+Fixed cost

What is Top line meaning in Financial term


Sale Value
Total purchase value of company
Monthy Sale value
Yearly sale value

Machine tonnage calculation formula for sheet metal parts


Total Circumference*thickness*Shear strength/1000
Total Circumference*thickness*tensile strength/1000
Total Volume*thickness*tensile strength/1000
None of the above

Interest rate on Working Capital Loan as per latest guideline


7.75%
9%
7.50%
None of the above
What is BOM in RMC ?
Bulk of materials.
Bill of materials.
Business of money.
Business of office management.

PAT stand for ?


Process Analytical technology
Profit After Tax
Process Analytical technique
Portable appliance testing