You are on page 1of 44

ISO 9001:2015

Requirements Awareness &


Transition Training

Presented By:

PUBLIC TRAINING
January 24-25, 2018
By
FRANKLIN SAMUEL PALILINGAN
1

Training Agenda

Day One
 Registration
 Introduction
 Brief Overview
 Risk Base Thinking
 QMS Requirement

Day Two (Risk Register and Internal Audit)


 Making Risk Register
 Internal audit
 Planning
 Preparation
 Performing the audit
 Reporting
Standard Training 2

1
Introduction

• Pre-course questionnaire
• Quality system principles
• An n ex SL
• High level structure
• Process approach, PDCA, Risk based thinking
• Issues, Interested parties
• Knowledge management

Standard Training 3

Changing of ISO 9001 standard

• Standar ISO ditinjau setiap lima tahun sekali untuk


memastikan standard tersebut tetap up-to-date dan
sesuai dengan kebutuhan market.
• Respon terhadap tren terbaru dan akan selaras dengan
system management lainnya seperti ISO 14001.
• Munculnya permintaan untuk penggunaan bahasa yang
umum serta selaras dengan standard-standard lain.
• Mempertimbangkan manajemen risiko untuk mencapai
tujuan organisasi

Standard Training 4

2
Course Objective

• An understanding of quality terminology (pemahaman


atas terminologi mutu)
• An understanding of the requirements of ISO
9001:2015 (pemahaman atas persyaratan standard ISO
9001:2015)
• An understanding of the requirements regarding
internal auditing (pemahaman atas persyaratan proses
audit)

Standard Training 5

Basic Concepts & Definitions

• A world wide federation of national standards bodies (federasi


badan standarisasi)
• Derived from the Greek words “iso”, meaning “equal” (berasal
dari kata Yunani “iso”, yang berarti “sama / sepadan”)
• Established in 1947 (berdiri tahun 1947)
• Management System: ISO 9001, ISO 14001, ISO / TS 16949
(produknya yang termasuk kategori sistem manajemen)

Standard Training 6

3
ISO Terminology on Products

• Telephone & banking cards


• Paper Size
• Symbols for automobile controls
• ISO international codes for country names, currency
and languages
• Universal system of measurement known as SI
(Systeme International d’unites )
• Safety of wire ropes
• ISO metric screw threads
Standard Training 7

ISO 9000 Family

• ISO 9000 series (seri / kelompok ISO 9000)


– ISO 9000:2005, quality management system – foundation &
vocabulary (prinsip dasar dan peristilahan)
– ISO 9001:2015, quality management system – requirement
(persyaratan standard)
– ISO 9002:2016, quality management systems – guidelines for
performance improvement (petunjuk peningkatan kinerja sistem)

• ISO 19011:2011, guidelines for auditing quality &


environmental systems (petunjuk pelaksanaan audit sistem mutu
dan lingkungan)

Standard Training 8

4
Changing History

Standard Training 9

OVERVIEW OF CHANGES

ISO 9001:2008 ISO 9001: 2015


Product Products and Services
Stakeholder Interested Parties
Exclusion N/A
Management Representative N/A (it is now part of leadership roles)
Documents, Records Documented Information
Preventive Action Risk-based Thinking and Improvement
Monitoring and Measuring Equipment Monitoring and Measuring Resources

Purchased Product Externally Provided Products and Services

Supplier, Producer, Distributor, Provider (Internal or External)


Vendor, Contractor

Standard Training 10

5
Changes

1. Risk-based thinking by determining issues and interested


parties expectation
2. Emphasis on Achieving Value for the organisation and its
customers
3. Emphasis on understanding and control of Risk to the
organisation
4. No formal requirement for a Management Representative
5. No formal requirement for Preventive Action
6. Enhanced Leadership Requirements
7. No exclusions, only Not Applicable clauses

Standard Training 11

Basic Core Concepts

• The Process Approach – the System Level view of


linkages, interfaces and process interactions

Standard Training 12

6
Basic Core Concepts

• PDCA

Standard Training 13

Basic Core Concepts

• Applies the Plan-Do-Check-Action (PDCA) cycle


with an overall focus on Risk-based Thinking
– Plan : Establish System & Process Objectives
– Do : Implement & Perform Processes
– Check : Monitor, Measure, Verify, Validate, Report
– Act : Make changes to the plan
• PDCA is applied to all processes and the QMS as a
whole
• PDCA cycle can be used to consider opportunities
as well as risks
Standard Training 14

7
Basic Core Concepts

• Risk Based Thinking

Standard Training 15

RISK-BASED THINKING

• Requirement for ISO 9001:2015 certification


• Risk-based Thinking and Improvement – replace
Preventive Action in ISO 9001:2008
• Organizations must plan and implement actions to
address risks and opportunities.
• Those actions must be proportionate to the potential
impact of the risks or opportunities

Standard Training 16

8
RISK

• Risk - the positive or negative effect of


uncertainty
– Negative Risk = Threat
– Positive Risk = Opportunity
• Uncertainty - created due to the lack of
meaningful information related to the knowledge
or understanding of an event
• Organization must consider both positive &
negative risks, and the treatment of both, e.g.
reducing exposure of negative risk or exploiting
the effects of positive risk
Standard Training 17

RISK-BASED THINKING

• Planned / implemented actions to address


risks and opportunities pertaining to
undesired outputs or outcomes, e.g.
– Negative Risk should be mitigated to acceptable
level
– Positive Risk should be exploited
• Risk Treatment – the proactive management
of risk using countermeasure and controls

Standard Training 18

9
RISK LIKELIHOOD & CONSEQUENCE

• Risk is often expressed as a combination of


Likelihood and Consequence
• Likelihood : The probability of an event occurring or
recurring
• Consequence : The possible impact/severity of an
event characterized as effect or influence

Standard Training 19

RISK MANAGEMENT STRATEGY

An effective risk management strategy involves


proactive and iterative :
1. Risk Identification
2. Risk Ranking
3. Risk Treatment
4. Risk Monitoring
Standard Training 20

10
RISK IDENTIFICATION & RANKING

Risk Identification – determine the factors that could


cause a process or the entire QMS to deviate from the
planned results. Usually using a risk-register, risk-log or
other computer-software etc, to record the risks

Risk Ranking/Rating – place the risks in order based on


frequency, likelihood, severity, impact on objectives,
monetary consequences, loss of customers, legal
exposure, impact on interested parties or other criteria
develop by the organization

Standard Training 21

RISK MONITORING

• Periodically reviewing identified risks


• Identifying new risks (internal / external)
• Ensuring proper execution of planned risk treatment
• Evaluating effectiveness of actions taken
• Reviewing with interested parties

Standard Training 22

11
Risk-based approach

Organisations are required to understand its context (Clause


4.1), Interested Parties (Clause 4.2) and determine the risks
and opportunities that need to be addressed (Clause 6.1)

There is no separate clause or sub-clause titled “preventive


action”

The concept of preventive action is expressed through a


risk-based approach to formulating QMS requirements.
Standard Training 23

High Level Structure

ISO 9001:2015 adopts the high-level structure and


terminology of Annex-SL

High Level Structure - identical and common terms and


definitions for use in all Management System
Standards:

Purpose to enhance the consistency and alignment of


different management system standard
Standard Training 24

12
Common Structure

Introduction
1. Scope
2. Normative references
3. Terms and definitions
4. Context of the organization
5. Leadership
6. Planning
7. Support
8. Operation
9. Performance evaluation
10. Improvement

Standard Training 25

Applicability

No specific reference to “exclusions” when determining


applicability of requirements to the organisation’s QMS

An organisation will need to review the applicability of


requirements due to the size of the organisation, the
management model it adopts, the range of activities
and the nature of the risks and opportunities it
encounters.

Standard Training 26

13
ISO 9001:2015

Quality Management Systems – Introduction and


requirements.

Standard Training 27

Introduction

0.1 General
0.2 Quality management principles
0.3 Process approach
0.4 Relationship with other MSS

• introduces the rationale for the Standard


• more formally structured.

Standard Training 28

14
0.1 General

Adoption of a quality management system is a STRATEGIC


DECISION for an organization that can help to improve its
overall performance
Potential benefits are:
- Ability to be consistent in providing product and services
- Opportunities to enhance customer satisfaction
- Able to address risk and opportunities
- demonstrate conformity to QMS requirements

Standard Training 29

0.2 Quality management principles

ISO 9001:2008 was based on eight quality management


principles whereas the ISO 9001:2015 refers to just seven

The principle of “a systems approach to management” has


been dropped

The last principle is now called “Relationship management”


instead of “Mutually beneficial supplier relationships”.

Standard Training 30

15
Quality Management Principles

1. Customer Focus
2. Leadership
3. Engagement of People
4. Process Approach
5. Improvement
6. Evidence-based Decision Making
7. Relationship Management.

Standard Training 31

7 PRINSIP MANAJEMEN MUTU


ISO 9001:2015

Fokus pada
pelanggan

Hubungan antar Kepemimpinan


manajemen

Pengambilan Keterlibatan
Keputusan 7 Prinsip Manaj. Karyawan
Berdasar Fakta Mutu

Pendekatan
Peningkatan Proses

Standard Training 32

16
0.3 Process Approach

Understand and manage interrelated processes as a system

Enables consistent and predictable results

PDCA cycle is fundamental

Introduces risk based thinking


Standard Training 33

0.4 Relationship with other management system


standard

Now a framework to improve alignment among all


International Standards for management systems

Better facilitates integration with other Management


System Standard

Standard Training 34

17
Section 1 - Scope

Consistently provide products and services to meet


requirements and enhance customer satisfaction

All requirements are intended to be applicable to all


organisations, regardless of type, size and products /
services provided

Removal of exclusions.
Standard Training 35

Section 2 – Normative references

ISO 9000:2015, Quality management systems –


Fundamentals and vocabulary

Standard Training 36

18
Section 3 – Terms and Definitions

1. document – information and the medium on which it is


contained
2. documented information - information required to be
controlled and maintained by an organisation and the
medium on which it is contained
3. procedure – specified way to carry out an activity or a
process (can be documented or not)
4. record – document stating results achieved or providing
evidence of activities performed.

Standard Training 37

Section 3 – Terms and Definitions

5. improvement – activity to enhance performance


6. objective – result to be achieved
7. nonconformity – non-fulfilment of a requirement
8. correction – action to eliminate a detected nonconformity
9. corrective action – action to eliminate the cause of a nonconformity and
prevent recurrence
10. preventive action – action to eliminate the cause of a potential
nonconformity or other undesirable situation
11. verification – confirmation that specified requirements have been
fulfilled
12. validation – confirmation that requirements for a specified intended use
or application have been fulfilled.
Standard Training 38

19
Section 3 – Terms and Definitions

13. product – output of an organisation that can be produced without any


transaction taking place between the organisation and the customer
14. service – output of an organisation with at least one activity necessarily
performed between the organisation and the customer
13. performance - measurable results
14. risk - effect (positive or negative) of uncertainty
15. outsource - to make an arrangement where an external
organisation performs part of an organisation’s function or
process - Note: An external organisation is outside the scope of
the management system although the outsourced function or
process is within the scope.

Standard Training 39

Section 3 – Terms and Definitions

16. top management – person or group of people who directs and


controls an organisation at the highest level
17. QMS consultant – advisor on QMS realisation – can assist in
realising parts of a QMS
18. interested party – person or organisation that can have an affect,
be affected by, or perceive itself to be affected by a decision or
activity
19. competence – ability to apply knowledge and skills to achieve
intended results
20. infrastructure – facilities, equipment & services
21. work environment - conditions under which work is performed.

Standard Training 40

20
Section 4 – Context of the Organisation

4.1 Understanding the


• this is a new clause and
organisation and its context
provides a key insight into
4.2 Understanding the needs the organisation
and expectations of interested
parties What constitutes the
4.3 Determining the scope of organisation’s quality
the quality management management system.
system
4.4 Quality management
system and its processes
Standard Training 41

Section 4 – Context of the Organisation

4.1 Understanding the organisation and its context


The organization shall determine external and internal issues that are
relevant to its purpose and its strategic directions and that affect its ability to
achieve the intended results of its quality management system

The organization shall monitor and review information about the external and
internal issues

Considerations: Vision, Mission, Policies, Objectives, Strategies,


Infrastructures, Legal, Technological, Competition, Culture, Location,
Organizational Knowledge and Performance

Standard Training 42

21
Section 4 – Context of the organisation

4.2 Understanding the needs and expectations of


interested parties

Organization shall determine


a. The interested parties that are relevant to the quality management
system
b. The requirements of these interested parties that are relevant to the
quality management system

Organization shall monitor and review information about these interested


parties and their requirements

Standard Training 43

Section 4 – Context of the organisation

4.3 Determining the scope of the quality management


system
• establish scope by determining boundaries and
applicability of the QMS to consider external/internal
issues, requirements of interested parties and the
organisation’s products and services
• scope must be documented and available, justify any
clauses of ISO 9001 that is not applicable
• any not-applicable clauses must not effect conformity of
products/services and customer satisfaction.
Standard Training 44

22
Section 4 – Context of the organisation

4.4 Quality management system and its processes


• must establish, implement, maintain and continually
improve the QMS
• interaction of processes required
• assign responsibilities and authorities for processes
• retain documented information to evidence the
processes when needed
• documented procedures are required when needed
Standard Training 45

Section 5 – Leadership

5.1 Leadership and • top management to now have


commitment a greater involvement in the
QMS
5.2 Policy
5.3 Organisational roles, What is required by top
responsibilities and management.
authorities

Standard Training 46

23
Section 5 - Leadership

5.1 Leadership and commitment


• must take accountability for the QMS’ effectiveness
• ensure Quality Policy and quality objectives are established
• ensure QMS is integrated into business processes
• ensure resources are available; communicate importance of effective QMS and
conformance
• ensure QMS achieves intended results
• promote improvement
• support other management to demonstrate leadership.
• top management must ensure: customer and regulatory requirements are met,
risks and opportunities are determined and addressed and focused on
enhancing customer satisfaction.
Standard Training 47

Section 5 – Leadership

5.2 Policy
• must be documented
• must be available internally and to interested
parties.

Standard Training 48

24
Section 5 – Leadership

5.3 Organisational roles, responsibilities and


authorities
• ensures responsibilities and authorities for relevant
roles are assigned, communicated and understood
• no formal requirement for specific management
representative

Standard Training 49

Section 6 – Planning

6.1 Actions to address risks • introduces risk based approach


and opportunities to planning
6.2 Quality objectives and • addresses risks, opportunities
planning to achieve them and quality objectives

6.3 Planning of changes


How quality planning is
achieved.

Standard Training 50

25
Section 6 – Planning

6.1 Actions to address risks and opportunities


When planning for the quality management system, the organization shall
consider the issues referred to in 4.1 and the requirement referred to in 4.2
and determine the risks and opportunities that need to be addressed

Considerations: Context of the Organization (4.1), Needs/Expectations of


Interested Parties (4.2), QMS Objectives, Processes and Controls, Resources,
Improvement Needs, Customers, Organizational Changes, Product/Service
Requirements, External Providers, Audit Results, Analysis and Evaluation
Results

Standard Training 51

Section 6 – Planning

6.2 Quality objectives and planning to achieve them


• quality objectives need to be established at relevant functions, levels and
processes, these objectives should be:
─ consistent with the Quality Policy, measurable and take into account
applicable requirements
─ relevant to conformity of products and services, and the enhancement of
customer satisfaction
─ monitored, communicated and updated as appropriate

Quality Objectives should be SMART


Specific, Measurable, Achievable, Realistic, Timely
• must determine what, how, who, when, etc
• quality objectives must be documented.
Standard Training 52

26
Section 6 – Planning

6.3 Planning of changes


• where change is needed, it needs to be carried out in
a planned and systemic manner
• must ensure integrity of QMS.

Standard Training 53

Section 7 - Support

7.1 Resources • newly constructed clause


7.2 Competence • much of what was in 2008
Version Clauses 4,5 & 6
7.3 Awareness
The support required to meet the
7.4 Communication
organisation’s goals.
7.5 Documented information

Standard Training 54

27
Section 7 - Support

7.1 Resources
7.1.1 General
• must provide resources for the implementation and
maintenance of the QMS
• must consider constraints of existing resources and
what may be provided from external providers.

Standard Training 55

Section 7 - Support

7.1 Resources
7.1.2 People
• must determine and provide people necessary for
effective information of QMS and operations /control
of processes.

Standard Training 56

28
Section 7 - Support

7.1 Resources
7.1.3 Infrastructure
• same as for ISO 9001:2008 Clause 6.3.
Infrastructure can include:
a. Buildings and associate utilities
b. Equipment include IT Infrastructure
c. Transportation
d. Communication technology

Standard Training 57

Section 7 - Support

7.1 Resources
7.1.4 Environment for the operation of processes
• same as ISO 9001:2008 Clause 6.4
Suitable environment can be combination of human
and physical factor

Standard Training 58

29
Section 7 - Support

7.1.5 Monitoring and Measuring Resources


7.1.5.1 General
• determine resources needed to ensure valid and reliable monitoring and
measuring results
• resources must be suitable for the activity and maintained as fit for purpose
• evidence of fit for purpose must be retained
• other requirements for measuring equipment unchanged.
• 7.1.5.2 Measurement Traceability
• Calibrated or verified
• Identified to determined their status
• Safeguards from adjustments and damage

Standard Training 59

Section 7 - Support

7.1 Resources
7.1.6 Organisational knowledge
• new clause required to determine, maintain and
make available the knowledge necessary for the
operation of its processes and to achieve conformity
of products and services
• particular knowledge required for changing need and
trends.

Standard Training 60

30
7.1.6 Organisational Knowledge

• organisational knowledge can include information such as


intellectual property and lessons learned

• may consider:

─ internal sources (eg learning from failures and successful


projects, capturing undocumented knowledge and expert
experience)

─ external sources (eg standards, training, conferences, knowledge


from customers or providers).

Standard Training 61

Organisational Knowledge

Organisational knowledge (Clause 7.1.6) addresses the need to


determine and maintain the knowledge obtained by the
organisation and its personnel, to ensure that it can achieve
conformity of products and services

The process for considering and controlling knowledge needs to


take account the organisation’s context, its size and complexity,
the risks and opportunities it needs to address and the need for
accessibility of knowledge

The balance between knowledge held by competent people and


knowledge made available by other means is at the
discretion/policy of the organisation.
Standard Training 62

31
Section 7 - Support

7.2 Competence
• very similar to ISO 9001:2008 Clause 6.2.2
• - determine necessary competence of person
• - ensure person are competent in education, training or
experience
• - take action to acquire competence and evaluate
effectiveness
• - retain documented information

Standard Training 63

Section 7 - Support

7.3 Awareness
• specific clause for awareness
• must be aware of
• - Quality Policy
• - Objectives
• - contribution to effective QMS
• - implication of not conforming with QMS.
Standard Training 64

32
Section 7 - Support

7.4 Communication
• much expanded clause for communication
• must determine what will be communicated internally and
externally about the QMS
• - what
• - when
• - to whom
• - how and by whom.
Standard Training 65

Section 7 - Support

7.5 Documented information


• QMS needs documented information required by the
Standard and as determined by the organisation
• The extent of documented information can differ from one
organisation to another due to its size, activities, processes,
products and services, complexity of processes and their
interactions, and the competence of people.
• Combines ISO 9001:2008 Clauses 4.2.3 (documentation) and
4.2.4 (records).
• documented information requires: identification and
description, review and approval.

Standard Training 66

33
Section 7 - Support

• a common clause of “Documented Information” has


been adopted
• the terms “documented procedure” and “record”
have both been replaced throughout the
requirements by “documented information”
• documented procedures (e.g. to define, control or
support a process) are now expressed as a
requirement to maintain documented information
• records are now expressed as a requirement to
retain documented information.
Standard Training 67

Section 8 - Operation

8.1 Operational planning and control • covers many of the


8.2 Requirements for products and Product Realisation
services requirements contained
in Clause 7 of the 2008
8.3 Design and development of products
version
and services
8.4 Control of externally provided
processes, products and services The heart of the
management system
8.5 Production and service provision (the business).
8.6 Release of products and services
8.7 Control of nonconforming outputs
Standard Training 68

34
Section 8 - Operation

8.1 Operational planning and control


• similar to ISO 9001:2008 Clause 7.1
• must plan, implement and control processes needed
to meet requirements for the provision of products
and services
• must control planned changes and review
unintended changes
• any outsourced processes must be controlled.
Standard Training 69

Section 8 - Operation

8.2 Requirements for products and services


8.2.1 Customer communication
• same as ISO9001:2008 Clause 7.2.3

• includes communicating with customers about handling and


controlling their property, establishing contingency requirements,
when relevant.

Standard Training 70

35
Section 8 - Operation

8.2.2 Determining the requirements for products and services


• same as ISO 9001:2008 Clause 7.2.1

• plus the organisation must meet the claims of products or services


it offers.

Standard Training 71

Section 8 - Operation

8.2.3 Review of requirements for products and services


• combines ISO 9001:2008 Clauses 7.2.1 and 7.2.2

• documented information required on results of the review and any


new requirements.

Standard Training 72

36
Section 8 - Operation

8.3 Design and development of products and services


• where the detailed requirements of the organisation’s
products and services are not already established or not
defined by the customer or by other interested parties, the
organisation shall establish, implement and maintain a design
and development process;
• a significantly increased focus on the role the customer has in
all stages of the design process
• the need for documented information to confirm
appropriateness of all stages is also clearly stated
• any changes made to design inputs and design outputs during
the design and development must be clearly identified.
Standard Training 73

Section 8 - Operation

8.4 Control of externally provided processes, products and


services
8.4.1 General
8.4.2 Type and extent of control
8.4.3 Information for external providers
• changes are mainly terminology and revised wording, i.e.
suppliers become ‘external providers!
• much as before, each stage of the purchasing process,
including evaluation, selection, performance monitoring and
re-evaluation remains a key requirement
• there is a significant increase in the steps needed to control
external provision.
Standard Training 74

37
Control of externally provided processes,
products and services

Control of externally provided products and services (Clause 8.4)


addresses all forms of external provision, whether by:
– purchasing from a supplier
– an arrangement with an associate company
– the outsourcing of processes and functions of the
organisation, or by any other means

Now required to take a risk-based approach to determine the


type and extent of controls appropriate to external providers and
externally provided products and services.
Standard Training 75

Section 8 - Operation

8.5 Production and service provision


8.5.1 Control of production and service provision
8.5.2 Identification and traceability
8.5.3 Property belonging to customers or external providers
8.5.4 Preservation
8.5.5 Post-delivery activities
8.5.6 Control of changes
• reference to ‘changes and post delivery activities’ have been strengthened.
• new clause for post-delivery activities
• specific clause for control of changes to ensure continuing conformity
• documented information must be retained describing the review of changes and
any action arising.

Standard Training 76

38
Section 8 - Operation

8.6 Release of products and services


• must verify that product and service requirements have
been meet and evidence of conformity retained
• release to customer does not proceed until the planned
verification of conformity has been satisfactorily
completed, unless otherwise approved by a relevant
authority and by the customer
• documented information to provide traceability to the
person(s) authorising release for delivery to the
customer.
Standard Training 77

Section 8 - Operation

8.7 Control of nonconforming outputs


• similar to ISO 9001:2008 Clause 8.3
• documented information required describing
nonconformity, actions taken, any concessions and
authority for taking action.

Standard Training 78

39
Section 9 – Performance Evaluation

9.1 Monitoring, Determining what is to be


measurement, analysis and monitored, measured, analysed
evaluation and evaluated will enable the
organisation to determine ‘if the
9.2 Internal audit management system suitable,
9.3 Management review adequate and effective ?’

How performance of the QMS


is evaluated.

Standard Training 79

Section 9 – Performance Evaluation

9.1 Monitoring, measurement, analysis and evaluation


• what needs to be monitored and measured,
• the methods for monitoring, measurement, analysis and
evaluation, as applicable, to ensure valid results
• when the monitoring and measuring is to be performed
• retain appropriate documented information as evidence
of the results.
• information resulting from monitoring and measuring
appropriate data should be analysed and evaluated
Standard Training 80

40
Section 9 – Performance Evaluation

9.2 Internal audit


• same as ISO 9001:2008 Clause 8.2.2
• at planned intervals
• evidence of internal audits and results must be
documented.

Standard Training 81

Section 9 – Performance Evaluation

9.3 Management review


• similar to ISO 9001:2008 Clause 5.6
• at planned intervals
• clearer agenda items (inputs)
• evidence of management review results must be
documented.

Standard Training 82

41
Section 10 - Improvement

10.1 General • QMS must continually improve

10.2 Nonconformity and • nonconformities must be


corrective action identified and reacted to
• corrective action must be
10.3 Continual improvement considered
Continual improvement remains
a core focus of the QMS.

Standard Training 83

Section 10 – Improvement

10.1 General
• opportunities for improvement must be determined

• action must be taken to meet customer requirements and enhance


customer satisfaction:

▫ improve products and service

▫ correcting, preventing or reducing undesired effects

▫ improve performance and effectiveness of the QMS

Standard Training 84

42
Section 10 - Improvement

10.2 Nonconformity and corrective action


• nonconformities (including complaints) must be reacted to
and applicable action taken
• root cause analysis must be considered based on its
significance
• effectiveness of corrective action must be reviewed
• change QMS if required
• evidence of action taken from nonconformities must be
documented
• evidence of results of corrective action must be documented.
Standard Training 85

Section 10 – Improvement

10.3 Continual improvement


• organisations must continually improve the
suitability, adequacy and effectiveness of the QMS
• must consider results of analysis and evaluation, and
outputs from management review.

Standard Training 86

43
End of Day
87

44

You might also like