Professional Documents
Culture Documents
(NE)
PREVAILING
WIND
(SW)
(NE)
COOLING TOWER
PREVAILING
WIND
COOLING TOWER
COOLING TOWER
NORTH
THIS DWG.
(SW)
KEY PLAN
N.1428.850
E.2190.000
N.1776.000
N.1735.000
SPE-21011
SPE-21019 TRANSFORMERS
GA-21209A
GA-21209B
GA-21201B
LOADING/UNLOADING AREA
N.1687.000
N.1585.000
FA-21001 FA-21205 ELECTRICAL SUBSTATION-6
FCC-PAR-012 FCC SATELLITE
MAINTENANCE ACCESS
DA-21202
CHANGE HOUSE
GA-21204A CONTROL ROOM
MAINTENANCE ACCESS FCC-STR-012
SPE-21201
FA-21002B LOADING/UNLOADING AREA FCC-STR-011 CYLINDER SHED
GB-21201
MAINTENANCE FCC-PR-002
ACCESS DROP AREA
GA-21205B
DA-21201
M
GA-21104B
30
FA-21002A GB-21201-EA02
R=
FCC-STR-007 EA-21203 M CYLINDER SHED
15
BATTERY LIMIT N.1850.000
R=
DWG. LIMIT N.1880.000
FCC-PR-003 BP-21201B
SPE-21012-GA01B FCC-STR-003 GA-21104A FCC-PAR-011 GA-21205A CL ACCESS ROAD (WIDTH 6M)
SPE-21012-GA01A FCC-SHT-001 FA-21201
SPE-21017
DC-21001
IBC TANK
EA-21401A(LOWER)
EA-21401B(UPPER)
GA-21103B FCC-PAU-002 FCC-STR-017 E.2115.000
DF-21101 FCC-STR-009 EC-21203
EA-21405
FA-21606(W/PIT)
DF-21402
FA-21405
DA-21501(UPPER)
FA-21609(W/PIT)
FA-21404
GA-21203B N.1438.000
FA-21401
FA-21402
FA-21501(LOWER)
CL INTEGRATION ROAD (WIDTH 10M)
FCC-PR-001
SPE-21604
SPE-21014 GA-21608B
EA-21403
GA-21103A GA-21603B
SA-21601
EA-21404
FA-21204
FA-21004 DS-21101
EA-21502
EA-21402
DS-21102 GA-21203A GA-21608A GA-21603A CL ACCESS ROAD (WIDTH 6M)
SPE-21012 FA-21502 E.2105.000
BA-21001
N.1437.000
GA-21106A
GA-21106B
GA-21102A
GA-21107A
GA-21107B
GA-21102B
GA-21105B
GA-21401A
GA-21401B
GA-21402A
GA-21402B
FA-21616
FA-21614
FA-21615
SPE-21607
FA-21610 FA-21503
DF-21401
FA-21006 FCC-SHT-004
SPE-21012-BV5B GA-21105A FCC-SHT-005
EA-21602A(LOWER)
EA-21602B(UPPER)
E.2091.000 FA-21602
EC-21601
FCC-PAR-001 FCC-PAR-002 FCC-PAR-003 FCC-PAR-004 FCC-PAR-005 FCC-PAR-006 FCC-PAR-007 FCC-PAR-008 FCC-PAR-009 FCC-PR-004
EC-21101
CL ACCESS ROAD (WIDTH 6M)
E.2085.000 EC-21102 EC-21202 EC-21204 EC-21401 BATTERY LIMIT
E.2080.000 VALVE PLATFORM
GA-21001A
GA-21001B
E.2079.000
GA-21601A
GA-21601B
GA-21604A
GA-21604B
GA-21605A
GA-21605B
FA-21008
N.1825.000
FCC-STR-018
GA-21110A
GA-21110B
E.2079.000
GA-21403A
GA-21403B
GA-21404A
GA-21404B
E.2076.000
SPE-21605
GA-21208A
GA-21208B
GA-21202A
GA-21202B
GA-21207A
GA-21207B
SPE-21606
FCC-STR-008
N.1557.600
FCC-STR-005 EA-21408B FA-21403
EA-21603A(LOWER)
EA-21105A(LOWER)
GA-21108A
GA-21108B
EA-21105B(UPPER)
EA-21001B(UPPER)
FA-21604
EA-21213A
EA-21213B
FCC-SHT-003 EA-21001A(LOWER)
EA-21212
DF-21403
FA-21203
EA-21102A
EA-21102B
EA-21104A
EA-21104B
FA-21617
FA-21009A
FA-21009B
FCC-STR-013
EA-21207
EA-21408A
FA-21607
FA-21608
DT-21401
EA-21407
CL ACCESS ROAD (WIDTH 6M)
DF-21201
N.1410.000
DS-21201
SPE-21101
CL ACCESS ROAD (WIDTH 6M)
GB-21002
GB-21001
EA-21214
DROP AREA
GB-21401
EA-21209
FCC-STR-015
Y=1788250.000
X=2050800.000
EA-21211(LOWER)
N.1636.000
N.1687.000
N.1585.000
EA-21210(UPPER)
RUNDOWN TANK
SPE-21020
EC-21001
EC-21002
N.1771.000
N.1552.000
FCC-STR-002
N.1578.600
IBC TANK
LUBE OIL
E.2040.000
GA-21101A
GA-21101B
SPE-21601
CL ACCESS ROAD (WIDTH 6M)
N.1820.000
N.1780.000
N.1740.000
N.1700.000
N.1660.000
N.1620.000
N.1580.000
N.1540.000
N.1500.000
N.1460.000
N.1420.000
N.1380.000
NOTES
1. ALL DIMENSIONS ARE IN MILLIMETERS.
2. ALL COORDINATES ARE IN METERS.
3. HPP EL. +0 = GL EL .+100200 = MSL EL. +4550
4. ABBREVIATION
- PR: STICK-BUILT PIPERACK
- PAR: MODULE RACK
- PAU: MODULE STRUCTURE
- STR: STICK-BUILT STRUCTURE
- SHT: SHELTER STRUCTURE
- DWG: DRAWING
SYMBOLOGY
- TYP: TYPICAL
- HPP: HIGH POINT PAVING REFERENCE POINT
- MSL: MEAN SEA LEVEL GROUND LEVEL CP DATE REVISIONS REFERENCE DRAWINGS REVIEWED BY
- FS: FIXED SIDE MCA DESCRIPTION DATE BY APR NUMBER TITLE
DRAWING HGA
DOS BOCAS REFINERY, PARAISO, TABASCO
- TOS: TOP OF STEEL GRATING 0 5 10 15 20 30 50 A2 ISSUE FOR DESIGN (FOR PLANNING) 15.MAY.2020 YJC KHL 2B-100-0-1-E-PL-0001 GENERAL LOCATION PLAN PROJECT YJC CATALYTIC CRACKING PLANT, FCC
PTI
- TOC: TOP OF CONCRETE SPECIALIST
CHECKERED PLATE A3 ISSUE FOR DESIGN 12.MAR.2021 YJC KHL R2B-P3-206-02-E-PL-00005 REACTOR REGENERATOR AND MAIN COL. SECTION 1/3
Infraestructura de SIMA
- GL: GROUND LEVEL GRAPHIC SCALE 1:500 METERS 0 ISSUE FOR CONSTRUCTION 02.JUL.2021 YJC KHL R2B-P3-206-02-E-PL-00006 REACTOR REGENERATOR AND MAIN COL. SECTION 2/3
Desarrollo, S.A. de C.V.
DBNR REVIEW BKC
U-21000
DROP AREA 1 ISSUE FOR CONSTRUCTION 07.APR.2022 YJC KHL R2B-P3-206-02-E-PL-00007 REACTOR REGENERATOR AND MAIN COL. SECTION 3/3
- CL: CENTER LINE 2 ISSUE FOR CONSTRUCTION 30.SEP.2022 YJC KHL R2B-P3-206-02-E-PL-00008 GAS CONCENTRATION SECTION COORDINATOR ASOCIADOS CONSTRUCTORES DBNR S.A. DE C.V.
APPROVAL KHL FCC OVERALL PLAN
- TL: TANGENT LINE BOUNDARY OF BATTERY LIMIT / DWG. LIMIT R2B-P3-206-02-E-PL-00009 LPG MEROX AND PROPYLENE RECOVERY SECTION REV
COORDINATION MHL PROJECT No. : SO6625
- EL: ELEVATION R2B-P3-206-02-E-PL-00004
CONTRACT NO. : PTI-ID-S-004/2020 DRAWING PREPARED IN : SAMSUNG ENGINEERING, SEOUL DATE : 30.SEP.2022 SCALE : 1:500 DIMENSION: mm. PLACE : Dos Bocas, Paraiso, TAB. 2
PROJECT DIRECTOR