DATE : - 04.04.

2024
DRI POWER CONSUMPTION (650 TPD X 3)
SL NO DRIVE & MCC NAME CONSUMPTION UNIT
1 LINE UP - 1 (KMD) 11600 KWH
2 LINE UP - 2 ( ID FAN ) 8705 KWH
3 LINE UP - 3 ( SAF ) 7870 KWH
4 LINE UP - 4 18570 KWH
5 LINE UP - 5 12410 KWH
6 ESP 3424 KWH
7 KILN MCC 9157 KWH
8 PUMP MCC 6130 KWH
9 UTILITY MCC 2450 KWH
10 PSB MCC 1410 KWH
11 METERING ROOM MCC 2422 KWH
12 KLIN PDB 986 KWH
13 MLDB 559 KWH
14 SILO (CPP) 67 KWH
15 RMHS 2400 KWH
16 Compressor - 3 0 KWH
17 Compressor - 4 1358 KWH
TOTAL DRI CONSUMPTION 89518 KWH
CPP CONSUMPTION 94880 KWH
LOSS 5362 KWH