PT .

Anugrah Bara Hampang


OB-COAL MINE PROJECT

VOLUMES OF COAL REMOVAL

Contractor
: PT . Anugrah Bara Hampang
Working: Period
Thursday, November 30, 2023

Progress
: Survey
november pit Q
Surface: Data
Join survey 30 november 2023
Boundary
: BUNDERY Stock 30 november 2023

No Bulan Coal Tonase Total TRUCKONT RECOVERY(%)

SEAM Q 3 968.512
Seam Q 4 4761.431

1 1 november-30 november SEAM Q 3 KOTOR 68.576 8,301.94 8,567.00 96.91


SEAM Q 1 1214.416
Seam Q 780
Seam H 509
Total 8,301.94 8,567.00 96.91

Dibuat oleh : Diperiksa Oleh : Disetujui Oleh :

PT. Anugerah Bara Hampang PT. Anugerah Bara Hampang PT. Anugerah Bara Hampang

Randy Yudi khohito Yukiman


Surveyor WAKTT Kepala Teknik Tambang