Method Statement For Installation Filter Drier Only
Method Statement For Installation Filter Drier Only
Purpose:
Purpose of this method statement is to provide maximum safety to the man and machine, utilize
resources and extend utmost life of equipment.
Steps of Installation:
Factory approved liquid-line filter drier is required on every unit - Always install the
factory-supplied liquid-line filter drier. If replacing the filter drier, refer to Product Data
Digest for appropriate part number. Obtain replacement filter driers from your distributor
or branch.
Match the filter/drier to the operating pressure & properties of the refrigerant gas and
equipment on which it is to be installed.
Pump down the system to 10 Psi or less in order to avoid wastage of gas while opening
the system
Carefully remove the old filter drier by loosening the flare nut from both ends and
prudent the flare on pipe.
Flush the gas and oil trace in the system using high pressure nitrogen gas.
Install new filter drier to the system using flare nuts or brazing (If the same is a brazing
type)
Vacuumise the system to -28 psi to avoid all the moisture present inside.
Do not overheat or damage the filter drier during installation.
Recharge the refrigerant gas and commission the system for operation.