0% found this document useful (0 votes)
133 views4 pages

Turnkey Office Fit-Out Project Scope

The document outlines the scope of works for a turnkey office fit-out project including design, construction, installation of furniture, fixtures, electrical, mechanical, plumbing and IT systems to develop an office space over a 4 month period according to client requirements and authority approvals.

Uploaded by

madhutridub
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
133 views4 pages

Turnkey Office Fit-Out Project Scope

The document outlines the scope of works for a turnkey office fit-out project including design, construction, installation of furniture, fixtures, electrical, mechanical, plumbing and IT systems to develop an office space over a 4 month period according to client requirements and authority approvals.

Uploaded by

madhutridub
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

Scope of Works

March 03, 2024

1. Project Name :
xxxxxxxxxxxxxxxxxxxx

2. Summary:
a. Develop construct, supply, and install a turnkey detailed, designed & furnished office
space that meets the Client requirements.
b. Includes office layout, furniture, lighting, electrical, life & safety, fire and mechanical
systems, security systems, IT systems, finishes, and materials in accordance with all
necessary authorities NOCs and approval.

3. Spaces & Areas:

Sl. No. Space Area (sqm)

4. Fit-out Scope:
a. Develop construct, supply, and install a turnkey detailed, designed & furnished office
space that meets the Client requirements.
b. Includes office layout, furniture, lighting, electrical, life & safety, fire and mechanical
systems, security systems, IT systems, finishes, and materials in accordance with all
necessary authorities NOCs and approval.

5. Project Duration :
4 Months

6. TRI Scope of Services :

Design and Space Planning:


a. The contractor shall develop a detailed design plan and space layout that meets DCT
requirements and includes office layout, furniture, lighting, electrical and mechanical
systems, finishes, and materials including all necessary accessories, fittings &
equipment.

Authorities' approval & statuaries requirements:


b. Contractor should obtain all necessary approvals in accordance with all building codes
and regulations.
c. ADM.
d. ADCD.
e. ADSSC.
f. ADDC.
g. ADPHC , OSHAD.
h. Others,

Page 1|4
Scope of Works

March 03, 2024


Demolition and Preparation:
The contractor shall remove any existing walls, ceilings, flooring, fixtures, and fittings
that are not required, and prepare the space for the new fit out.

Construction and Installation:


The contractor shall construct new walls, partitions, ceilings, and floors, and install all
furniture, fittings, and fixtures as specified in the design plan and fit out manual
including all required systems to operate the space. Including but not limited to any.
necessary electrical, plumbing, mechanical work, life and safety, fire , IT, security & HR
related systems

• Furniture: Desks, chairs, tables, storage cabinets, bookcases, sofas, and other
seating arrangements.
• Flooring: Carpet, tiles, hardwood, vinyl, or other types of flooring material.
• Lighting: Ceiling lights, wall lights, floor lamps, and task lighting including all
necessary fittings , accessories & sensors .
• Walls and partitions: Drywall, glass partitions, movable walls, and wall finishes.
• Electrical and data systems: Power outlets, wiring, networking, and communication
systems including all related accessories, necessary cabling & DBs.
• HVAC systems: Air conditioning, heating, extraction, and ventilation systems.
• Plumbing: Cubicles, Sinks, toilets, urinals, and other plumbing fixtures.
• Window treatments: Curtains, blinds, or other types of window coverings.
• Signage: Wayfinding signs, company logos, and branding elements.
• Decorative elements: Artwork, plants, decorative objects, and other design features.
• Kitchen and breakroom equipment: Refrigerators, microwaves, coffee machines,
and other appliances.
• Audiovisual systems: TVs, projectors, screens, and audio systems.
• Security systems: Turnstiles, Cameras, access control systems, and alarms

Finishing:
• The contractor shall apply all finishes, including but not limited to paint, wallpaper,
flooring, and window treatments, as per the design requirements and specs.

7. Summary of Costs :
Fixed Lumpsum Price : AED 10,000,000.00

8. Cost Break-down :

Sl. Deliverables Description Cost (AED)


No.
Preliminaries,
Demolition ,
Mobilization
insurances etc

Design Design ( concept & detailed ) and build Fit-out works to the Premises as

Page 2|4
Scope of Works

March 03, 2024


required by DCT in this Scope of Works namely (not limited to):
Design
a) Plans, sections, elevations
b) Rendering.
c) 3D.
d) Submittals.
e) Samples.

a) Preliminary works (e.g. re-design of all systems in compliance with new


layout, indication of
changes to as-built data, dismantling works, cleaning, waste management etc.);
b) Interior construction and finishing works: floors, ceilings, partitions,
doors, fixtures, fittings,
etc;
c)Life and safety Mechanical: HVAC, water supply, sewerage, and other
works.
d) Electrical: lighting, power, and other works.
e) IT, server & GSM cabling and infra structure …etc
f) Obtain all necessary permits, NOCs, licenses, insurance, etc. necessary for the
execution of the works.
g) Snagging, testing and hand over. closeout package submission.
h) Integration with current base built.

DESIGN
Final Design Documentation (with shop drawings):
- Architecture,
- Electrical & Small Current/Data Network,
- Mechanical (HVAC, water, sewerage, FF, FA),
-Security

PARTITIONS
Gypsum Partitions
Glass Partitions
Acoustic if required.

CEILINGS & FLOORS


Suspended Ceiling
Raised Floor System
Carpet or any approved finishing materials.

HVAC
ELECTRICAL
SANITARY &
PLUMBING IT
INFRASTRUCTURE
PAINT WORKS
DOORS
SKIRTING & PROFILE
AV
Coordination drawings
Civil Works Partitioning
Works Wall
Finishes Floor
Finishes Ceiling
Finishes Joinery
Doors
Curtains, blinds, or other types of window coverings.
MEP, fire. life 1st , 2nd & 3rd fix of : Electrical Works including cabling and distribution
& safety boards.
o SMDB &DBs
o Capacitor Bank

Page 3|4
Scope of Works

March 03, 2024


o UPS.
o Control Panel
o Lighting Control System
o Small power socket and switches
o Internal lighting
o CCTV system
o Public address system
o Access Control System
o SMATV system
o Audio Visual system
o Emergency Lighting
o Fire alarm system

Plumbing works
Fire Alarm & Fire Fighting works
HVAC Works including the Heat Load Calculations

FF&E White goods


Lights
Sanitary fittings
Loose Furniture

IT & Security AV, IT, CCTV & Security Access, server, GSM , telephone
Miscellaneous Signage: Wayfinding signs, company logos, and branding elements.

9. Additional Information :