SITUATION:
It was reported with snapping of one main conductor at the point of armouring string. The
conductor had been found with broken and fallen to ground.
a. During time of initial stringing of the line conductor, it was suspected that there
had been issue of the damage of few stands of the line conductor.
b. The workmen without the knowledge of the ground engineer have put the
armouring string upon this damage part.
c. The line had also been charged and allowed for current flow for few years with
this connection.
d. Subsequent load flow and due to less strength at the start point of this junction,
the tension of the larger Part of the span, resulted further damage of the
conductor. The steel part of the ACSR conductor was supporting the strength
due to partial and subsequent total breakage of few strands around this portion.
e. The effect of steel portion was within the ACSR armouring portion. But due to
lesser support from other strands, finally the steel conductor could not manage
to hold and resulted final damage.
f. The portion was repaired by the use of mid-span joint and the line was again
strung. The line was allowed for the current flow.
.