Cfolios Office - Electrical

Sr. No. Material Quantity Unit Issue Date Checked by Slip Remarks
1 4x4 plate 1 Nos 4/20/2017 Dhananjay Available
2 4 5 switch 4 Nos 4/20/2017 Dhananjay Available
3 Socket 5 Nos 4/20/2017 Dhananjay Available
4 8M plate 2 Nos 4/20/2017 Dhananjay Available
5 4x10 plate 1 Nos 4/20/2017 Dhananjay Available
6 Switch GM 5 Nos 4/20/2017 Dhananjay Available
7 Socket GM 1 Nos 4/20/2017 Dhananjay Available
8 CC Patti 5 Nos 4/20/2017 Dhananjay Available
9 8x12 GM Plate 1 Nos 4/20/2017 Dhananjay Available
10 4 Way MCB Box 1 Nos 4/20/2017 Dhananjay Available
11 Screw 1+15 3 Dozen 4/20/2017 Dhananjay Available
12 Grip box 1 Nos 4/20/2017 Dhananjay Available
13 Wall 20W CFL 3 Nos 4/20/2017 Dhananjay Available
14 Angle Holder 3 Nos 4/20/2017 Dhananjay Available
15 Round Plates 5 Nos 4/20/2017 Dhananjay Available
16 23W CFL 3 Nos 4/20/2017 Dhananjay Available
17 Fastner 3 Nos 4/20/2017 Dhananjay Available
18 GM 2 Way switch 2 Nos 4/20/2017 Dhananjay Available
19 Flexible pipe 3 Ft 4/20/2017 Dhananjay Available
20 4 Model SP Box 1 Nos 4/20/2017 Dhananjay Available
21 4 Model Plate 1 Nos 4/20/2017 Dhananjay Available
22 Switch Cap 7 Nos 4/20/2017 Dhananjay Available
23 Socket Cap 1 Nos 4/20/2017 Dhananjay Available
24 16Amp. Socket 1 Nos 4/20/2017 Dhananjay Available
25 10 mm wire 1 Nos 5/1/2017 Arun Available
26 Reel 36 Nos 5/1/2017 Arun Available
27 Break 2 Nos 5/1/2017 Arun Available
28 Binding wire 2 Nos 5/1/2017 Arun Available
29 GI wire 1 Kg 5/1/2017 Arun Available
30 Meter box 1 Nos 5/1/2017 Arun Available
31 CC patti 3 Nos 5/1/2017 Arun Available
32 1" Screw 36 Nos 5/1/2017 Arun Available
33 Grip box 1 Nos 5/1/2017 Arun Available
34 Tape 1 Nos 5/1/2017 Arun Available
35 1 way switch 1 Nos 5/1/2017 Arun Available
36 1 way gangbox 1 Nos 5/1/2017 Arun Available
37 reel 36 Nos 5/1/2017 Arun Available
38 Binding wire 2 Nos 5/1/2017 Arun Available
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
Cfolios Office & Pharma - Interior
Sr. No. Material Quantity Unit Issue Date Checked by Slip Remarks
1 Plywood 19mm thk (Tusker) 8 Nos 2/24/2017 Pavan
2 Laminates (White) 4 Nos 2/24/2017 Pavan
3 Flush Door with latch & screws (38 X 80) 1 Nos 2/24/2017 Pavan
4 Falco Fix Ebs 10 Kg 2/24/2017 Pavan
5 2" Nails 1 Kg 2/24/2017 Pavan
6 1*1/2" Nails 2 Kg 2/24/2017 Pavan
7 17 No 1" LH 0.5 Kg 2/24/2017 Pavan
8 17 No 3/4" LH 0.5 Kg 2/24/2017 Pavan
9 14 No 1*1/4" LH 1 Kg 2/24/2017 Pavan
10 3" Screw 1 Box 2/24/2017 Pavan
11 2*1/2 Screw 1 Box 2/24/2017 Pavan
12 20 No 1" Nails 1 Kg 2/24/2017 Pavan
13 Abro Tape 2 bundles 2/24/2017 Pavan
14 1" X 1/2" Goath Patti Burma Teak 100 Rft 2/24/2017 Pavan
15 16" Channel 6 Sets 2/28/2017 Ajinkya
16 Abro Tape 10 Nos 2/28/2017 Ajinkya
17 19mm Plywood 10 Nos 2/28/2017 Ajinkya
18 Nagin Pin 5 Dozen 2/28/2017 Ajinkya
19 Spray 2 Nos 2/28/2017 Ajinkya
20 S S Screw 1 Box 2/28/2017 Ajinkya
21 Frosty White 15 Nos 2/28/2017 Ajinkya Returned 14 sheets on 03-03-
17
22 SG Laminate 1029 2 Nos 3/3/2017 Dhananjay
23 SG Laminate 6001 4 Nos 3/3/2017 Dhananjay
24 Frosty White 10 Nos 3/3/2017 Dhananjay Returned 10 sheets on 03-03-
17
25 6mm plywood 8x4 20 Nos 3/3/2017 Dhananjay

26 Fevicol EBS 10 Kg 3/3/2017 Dhananjay

27 1" x17 nails 1 Kg 3/3/2017 Dhananjay


28 Fevicol EBS 10 Kg 3/7/2017 Pavan
29 Nails 1 Kg 3/7/2017 Pavan
30 1 x 17 1H 1 Kg 3/7/2017 Pavan
31 38/6 SS screw 10 Dozen 3/7/2017 Pavan
32 2 1/2" Elbow 2 Nos 3/8/2017 Dhananjay For Vikram KAKA's Home
33 3 1/2" Pipe 10' 1 Nos 3/8/2017 Dhananjay For Vikram KAKA's Home
34 W/C 1 Nos 3/8/2017 Dhananjay For Vikram KAKA's Home
35 Flush Tank 1 Nos 3/8/2017 Dhananjay For Vikram KAKA's Home
36 Seat Cover 1 Nos 3/8/2017 Dhananjay For Vikram KAKA's Home
37 Health Faucet 1 Nos 3/8/2017 Dhananjay For Vikram KAKA's Home
38 P Tap 1 Nos 3/8/2017 Dhananjay For Vikram KAKA's Home
39 Angle Cock 1 Nos 3/8/2017 Dhananjay For Vikram KAKA's Home
40 Connection pipes 3 Nos 3/8/2017 Dhananjay For Vikram KAKA's Home
41 1 1/2" T 1 Nos 3/8/2017 Dhananjay For Vikram KAKA's Home
42 1 1/4" Elbow 1 Nos 3/8/2017 Dhananjay For Vikram KAKA's Home
43 1 1/2" MTA 1 Nos 3/8/2017 Dhananjay For Vikram KAKA's Home
44 1 1/2" to 1 1/4" reducer 1 Nos 3/8/2017 Dhananjay For Vikram KAKA's Home
45 1 1/4" MTA 1 Nos 3/8/2017 Dhananjay For Vikram KAKA's Home
46 2 1/4" Cap 1 Nos 3/8/2017 Dhananjay For Vikram KAKA's Home
47 Flange 4 Nos 3/8/2017 Dhananjay For Vikram KAKA's Home
48 Tephlon Tape 2 Nos 3/8/2017 Dhananjay For Vikram KAKA's Home
49 Nails 8x38 3 Dozen 3/9/2017 Dhananjaya
50 Plywood 19mm thk (Tusker) 4 Nos 3/14/2017 Ajinkya
51 Plywood 6mm thk (Tusker) 2 Nos 3/14/2017 Ajinkya
52 Laminates (White) 7 Nos 3/14/2017 Ajinkya
53 Laminates (Red) 2 Nos 3/14/2017 Ajinkya
54 Fevicol EBS 20 Kg 3/16/2017 Ajinkya Available
55 nails 1 Kg 3/16/2017 Ajinkya Available
56 Hinges 2 Sets 3/16/2017 Ajinkya Available
57 Channels 22" 2 Sets 3/16/2017 Ajinkya Available
58 Abrotape 1 bundles 3/17/2017 Ajinkya Available
59 Spray 3m 2 Nos 3/17/2017 Ajinkya Available
60 3M Spray 3 Nos 3/21/2017 Ajinkya Available
61 Abrotape 2 Rolls 3/21/2017 Ajinkya Available
62 2" Nails 0.5 Kg 3/21/2017 Ajinkya Available
63 Fevicol EBS 20 kg 3/25/2017 Dhananjay Available
64 16" Drawer channels 1 Sets 4/1/2017 Ajinkya Available
65 1" nails 0.5 Kg 4/1/2017 Ajinkya Available
66 2" Nails 0.5 Kg 4/1/2017 Ajinkya Available
67 5" SSF Brass hinges 4 Nos 4/1/2017 Ajinkya Available
68 Abrotape 2 Rolls 4/2/2017 Ajinkya Available
69 SS Screw 32/8 4 Dozen 4/2/2017 Ajinkya Available
70 Falco Fix Ebs 10 Kg 4/2/2017 Ajinkya Available
71 Round plate 8 Nos 4/2/2017 Arun Available
72 Batten Holder 8 Nos 4/2/2017 Arun Available
73 2" Screw 2 Dozen 4/2/2017 Arun Available
74 1 1/2" Screw 3 Dozen 4/2/2017 Arun Available
75 Sole 1 1/2 x 1/2 edge guard 24 ft 4/3/2017 Vikram Available
76 Sofa legs (Wenga) 4 Nos 4/3/2017 Vikram Available
77 (Qubu) Patch Fitting Top 2 Nos 4/4/2017 Vikram Available
78 (Qubu) Patch Fitting Bottom 2 Nos 4/4/2017 Vikram Available
79 Floor Spring Quba 2 Nos 4/4/2017 Vikram Available
80 Glass Door Handles 2 Nos 4/4/2017 Vikram Available
81 Glass Door Handles -Royale 1 Sets 4/4/2017 Vikram Available
82 Godrej Door Closer. 1 Sets 4/5/2017 Ajinkya Available
83 Quba Deadlock 1 Nos 4/5/2017 Ajinkya Available
84 Pin Cylinder 1 Nos 4/5/2017 Ajinkya Available
85 Europia Drawer lock 5 Nos 4/5/2017 Ajinkya Available
86 Silver Matt laminate 1 Nos 4/5/2017 Ajinkya Available
87 9156 SPSF Laminate 2 Nos 4/5/2017 Ajinkya Available
88 Soft Board 2 Nos 4/5/2017 Ajinkya Available
89 Edge Bind 1" 80 ft 4/5/2017 Ajinkya Available
90 Edge Bind 2" 60 ft 4/5/2017 Ajinkya Available
91 Fevicol ProBond 1 Kg 4/5/2017 Ajinkya Available
92 14" Channel 2 Nos 4/6/2017 Vikram Available
93 16" Channel 1 Nos 4/6/2017 Vikram Available
94 2x1 stud 6 Nos 4/6/2017 Vikram Available
95 SS m. Catch 1 Nos 4/6/2017 Vikram Available
96 6" SS stopper 1 Nos 4/6/2017 Vikram Available
97 M clutch 4 Nos 4/6/2017 Vikram Available
98 0145 6" Handles 6 Nos 4/6/2017 Vikram Available
99 M screw 12 Nos 4/6/2017 Vikram Available
100 4X3/4X19mm 2 Nos 4/6/2017 Vikram Available
101 Double screw Self pin 16 Nos 4/6/2017 Vikram Available
102 SS Screw 32/8 2 Dozen 4/6/2017 Vikram Available
103 SS Screw 13/4 1 Dozen 4/6/2017 Vikram Available
104 014 6" Handlies 4 Nos 4/6/2017 Vikram Available
105 M-Screw 8 Nos 4/6/2017 Vikram Available
106 Taken 120 gm 4/6/2017 Vikram Available
107 SG 6001 Laminate 2 Sets 4/8/2017 Ajinkya Available
108 08 Brusty White 2 Sets 4/8/2017 Ajinkya Available
109 Falcofine 5 Kg 4/8/2017 Ajinkya Available
110 3M Spray 1 Nos 4/8/2017 Ajinkya Available
111 20" Drawer Channel 3 Set 4/11/2017 Ajinkya Available
112 19/6 SS 10 Dozen 4/11/2017 Ajinkya Available
113 Abrotape roll 1 Bundle 4/11/2017 Ajinkya Available
114 Ghod Patti 1 1/2 X 1/2 21 Ft 4/11/2017 Ajinkya Available
115 4 x 15 x 20 Perforated trolly 1 Nos 4/11/2017 Ajinkya Available
116 6 x 15 x 20 Plain trolly 1 Nos 4/11/2017 Ajinkya Available
117 8 x 15 x 20 Thali trolly 1 Nos 4/11/2017 Ajinkya Available
118 Stud 4 Nos 4/13/2017 Ajinkya Available
119 Edge Binder 40 Ft 4/13/2017 Ajinkya Available
120 Handle black Premium 2 Nos 4/14/2017 Arun Available
121 SS Handle 2 Nos 4/14/2017 Arun Available
122 Magulu 2 Nos 4/14/2017 Arun Available
123 1/2 Buffer 9 ft 4/14/2017 Arun Available
124 1/2" X 1/2" Buffer 10 ft 4/14/2017 Arun Available Not received
125 4x15 R H - - 4/18/2017 Sachin Available
126 Europ D Locker 1 Nos 4/18/2017 Ajinkya Available
127 Cable Manager 10 Nos 4/18/2017 Ajinkya Available Returned 23-4-17
128 Self Dully 25/6 screws 1 Box 4/20/2017 Dhananjay Available Returned 23-4-17
129 Star Screws 25/6 1 Box 4/20/2017 Dhananjay Available Returned 23-4-17
130 H link, F bracket 3 Nos 4/22/2017 Sachin Available
131 8m Door Kt 8 Nos 4/26/2017 Sachin Available
132 19/6 1 Dozen 4/26/2017 Sachin Available
133 25/6 1.5 Dozen 4/26/2017 Sachin Available
134 Gvp 1.5 Dozen 4/26/2017 Sachin Available
135 2" Stud 4 Nos - - Available
136
137 SSF Cable Manager 8 Nos 4/28/2017 Ajinkya Available
138
139
140
Cfolios Office & Pharma - Paint
Sr. No. Material Quantity Unit Issue Date Checked by Slip Remarks
1 Wall care putty 20 Kg 3/1/2017 Dhananjay
2 POP 1 Kg 3/1/2017 Dhananjay
3 TE Wall 4 ltrs 3/4/2017 Ajinkya Available Slip was missing entered on 17-3
4 Wall care putty 1 Bag 40 kg 3/9/2017 Dhananjay/Pavan Available
5 External Primer 40 ltrs 3/9/2017 Dhananjay/Pavan Available
6 Scrapper 2 Nos 3/9/2017 Dhananjay/Pavan Available
7 External Roller Brush 2 Nos 3/9/2017 Dhananjay/Pavan Available One roller returned on 17-03 (9")
8 4" Brush 1 Nos 3/9/2017 Dhananjay/Pavan Available
9 Brown Paper 1mtr 18 Nos 3/9/2017 Dhananjay/Pavan Available
10 150 Number 12 Nos 3/9/2017 Dhananjay/Pavan Available
11 Wall care putty 40 kg 3/10/2017 Vikram
12 Metallic grey Enamel Paint 3 ltrs 3/10/2017 Vikram
13 1" Brush 2 Nos 3/17/2017 Ajinkya Available
14 2" Brush 1 Nos 3/17/2017 Ajinkya Available
15 Roller 1 Nos 3/17/2017 Ajinkya Available
16 2in 1 roller 1 Nos 3/17/2017 Ajinkya Available
17 PrimaXX Xterior 80 ltrs 3/23/2017 Vikram 7600 Rs paid for paint
18 Rumsena 1 Pack 3/26/2017 Arun Available For Kaka's Home
19 Bumsena 1 Pack 3/26/2017 Arun Available For Kaka's Home
20 Ambar 1 Pack 3/26/2017 Arun Available For Kaka's Home
21 Kali 2 Packs 3/26/2017 Arun Available For Kaka's Home
22 Whitening 1 Kg 3/26/2017 Arun Available For Kaka's Home
23 Polish 2 ltrs 3/26/2017 Arun Available For Kaka's Home
24 Sukha Paper 6 nos 3/26/2017 Arun Available For Kaka's Home
25 Brown Paper 1mtr 1 Nos 3/26/2017 Arun Available For Kaka's Home
26 NC thinner 2 ltrs 3/27/2017 Dhananjaya Available For Kaka's Home
27 Brush 12" 1 Nos 3/27/2017 Dhananjaya Available For Kaka's Home
28 Flat 8 1 Nos 3/27/2017 Dhananjaya Available For Kaka's Home
29 8780 RB 6 ltrs 3/27/2017 Arun Available
30 7969 RB 2 ltrs 3/27/2017 Arun Available
31 BW White 6 ltrs 3/27/2017 Arun Available
32 7502 RB 2 ltrs 3/27/2017 Arun Available
33 L105 rb 6 ltrs 3/27/2017 Arun Available
34 8260 RB 6 ltrs 3/27/2017 Arun Available
35 7934 RB 1 ltrs 3/27/2017 Arun Available
36 PU Glossy Ext. 1 ltrs 3/27/2017 Arun Available
37 4" Brush 1 Nos 3/27/2017 Arun Available
38 Whiting 2 Kg 3/29/2017 Ajinkya Available For Kaka's Home
39 3" Brush 1 Nos 3/29/2017 Ajinkya Available For Kaka's Home
40 Enamel Wall 0.5 ltrs 3/29/2017 Ajinkya Available For Kaka's Home
41 Royale 7969 1 ltrs 3/30/2017 Ajinkya Available For Kaka's Home
42 Pae white 1 ltrs 3/30/2017 Ajinkya Available For Kaka's Home
43 1" Brush 1 Nos 3/30/2017 Ajinkya Available For Kaka's Home
44 BW White 5 ltrs 3/31/2017 Ajinkya Available For Kaka's Home
45 4" Roller 1 Nos 3/31/2017 Ajinkya Available For Kaka's Home
46 Royale Play 1 Nos 3/31/2017 Ajinkya Available For Kaka's Home (Item Not used-
Contact painter)
47 Royale 8260 2 ltrs 4/1/2017 Ajinkya Available For Kaka's Home
48 Royale 3203 4 ltrs 4/3/2017 Vikram Available For Kaka's Home
49 Royale 8236 2 ltrs 4/3/2017 Vikram Available For Kaka's Home
50 Royale White 1 ltrs 4/4/2017 Vikram Available For Kaka's Home
51 Apex 8296 2 ltrs 4/6/2017 Vikram Available
52 PGE 8296 6 ltrs 4/6/2017 Vikram Available
53 Thinner 2 ltrs 4/6/2017 Vikram Available
54 3" Brush 1 Nos 4/6/2017 Vikram Available
55 TE 8300 10 ltrs 4/9/2017 Arun Available
56 Mseal 2 Nos 4/9/2017 Arun Available
57 TE Wall 10 ltrs 4/11/2017 Arun Available
58 Enamel 8294 2 ltrs 4/11/2017 Arun Available
59 RB 154 8 ltrs 4/13/2017 Arun Available
60 Pae Wall 3 ltrs 4/13/2017 Arun Available
61 Thinner 2 ltrs 4/13/2017 Arun Available
62 Enamel Brown 0.5 ltrs 4/14/2017 Arun Available
63 Enamel Black 50 ml 4/14/2017 Arun Available
64 Enamel Red 100 ml 4/14/2017 Arun Available
65 Royal 154 4 ltrs 4/22/2017 Arun Available
66 X120 200 ml 4/26/2017 Arun Available
67 POP 1 Kg 4/26/2017 Arun Available
68 2" Brush 1 Nos 4/26/2017 Arun Available
69 Indocon Signal red ext 1 ltrs 4/26/2017 Arun Available
70 SR 1/2 x 4 pq Heatex - - 4/26/2017 Arun Available
71 PGE Metal Grey 1 ltrs 4/27/2017 Arun Available
72 TE White 1 ltrs 4/28/2017 Arun Available
73 TE 8300 1 ltrs 4/29/2017 Arun Available
74 Thinner 0.5 ltrs 4/30/2017 Arun Available
75 PGE Black 100 ml 5/1/2017 Arun Available
76
77
78
79
80
81
82
Project: Gangadhar Residence
Sr. No Material Quantity Unit Issue Date Checked by Slip Remarks
1 PGE Black 4 Ltrs 3/20/2017 Vikram Available
2 4" Roller 2 Nos 3/20/2017 Vikram Available
3 2" Brush 2 Nos 3/20/2017 Vikram Available
4 12 No. Flat brush 2 Nos 3/20/2017 Vikram Available
5 3" Brush 2 Nos 3/20/2017 Vikram Available
6 Ace White 40 Ltrs 3/20/2017 Vikram Available
7 Premium Emulsion 8292 6 Ltrs 3/20/2017 Vikram Available
8 Premium Emulsion 9250 6 Ltrs 3/20/2017 Vikram Available
9 Premium Emulsion 8747 4 Ltrs 3/20/2017 Vikram Available
10 Tracter Emulsion-White 8 Ltrs 3/20/2017 Vikram Available
11 Stainer Voilet 100 ml 3/20/2017 Vikram Available
12 Ace 8328 2 Ltrs 3/20/2017 Vikram Available
13 Royale 8561 2 Ltrs 3/20/2017 Vikram Available
14 Rayale 8563 8 Ltrs 3/20/2017 Vikram Available
15 PGE Oilpaint - Sandlewood 5 Ltrs 3/20/2017 Vikram Available
16 Thinner 5 Ltrs 3/20/2017 Vikram Available
17
18
19
20
Murthi Residence - Paint
Sr. No. Material Quantity Unit Issue Date Checked by Supplier Slip
1 POP 5 kg 5/3/2017 sachin Swastik hardware Available
2 crack seal 1 kg 5/3/2017 sachin Swastik hardware Available
3 primer 20 litre 5/3/2017 sachin Swastik hardware Available
4 wall care putty 120 kg 5/3/2017 sachin Swastik hardware Available
5 blade 8" 8 Nos 5/3/2017 sachin Swastik hardware Available
6 blade 4" 2 Nos 5/3/2017 sachin Swastik hardware Available
7 scrapper 2 Nos 5/3/2017 sachin Swastik hardware Available
8 sand paper 60no 5 mtr 5/3/2017 sachin Swastik hardware Available
9 sand paper150no 50 piece 5/3/2017 sachin Swastik hardware Available
10 roller brush 4 Nos 5/3/2017 sachin Swastik hardware Available
11 brush 4" 3 nos 5/3/2017 sachin Swastik hardware Available
12 outside 4" brush 3 Nos 5/3/2017 sachin Swastik hardware Available
13 TE-white 10 ltr 5/6/2017 sachin Swastik hardware Available
14 violet stainer 100 ml 5/6/2017 sachin Swastik hardware Available
15 wall putty 5 kg 5/6/2017 sachin Swastik hardware Available
16 abro tape 3 nos 5/6/2017 sachin Swastik hardware Available
17 crack seal 1 kg 5/6/2017 sachin Swastik hardware Available
18 2" blade 2 nos 5/6/2017 sachin Swastik hardware Available
19 paint samples-0684,8016,7502,l- 1 ltr each 5/6/2017 sachin Swastik hardware Available
105,8443,8780
20 TE-emulsion 8780 20 ltr 5/7/2017 sachin Swastik hardware Available
21 steel lambi 4 kg 5/7/2017 sachin Swastik hardware Available
22 carpech 2 kg 5/7/2017 sachin Swastik hardware Available
23 thinner 5 ltr 5/7/2017 sachin Swastik hardware Available
24 TE 8300 Sample 1 ltr 5/8/2017 sachin Swastik hardware Available
25 TE 8300 10 ltr 5/8/2017 sachin Swastik hardware Available
26 TE -WHTE 4 ltr 5/9/2017 sachin Swastik hardware Available
27 pop 2 kg 5/10/2017 sachin Swastik hardware Available
28 wall putty 5 kg 5/10/2017 sachin Swastik hardware Available
29 royale 8016 1 ltr 5/10/2017 sachin Swastik hardware Available
30 royale 7502 1 ltr 5/10/2017 sachin Swastik hardware Available
31 royale L105 8 ltr 5/10/2017 sachin Swastik hardware Available
32 TE white base 1 ltr 5/11/2017 sachin Swastik hardware Available
33 TE 5155 1 ltr 5/11/2017 sachin Swastik hardware Available
34 TE 9263 1 ltr 5/11/2017 sachin Swastik hardware Available
35 black paint for grill/gate 2 ltr 5/11/2017 sachin Swastik hardware Available
36 thinner 1 ltr 5/11/2017 sachin Swastik hardware Available
37 TE L105 8 ltr 5/11/2017 sachin Swastik hardware Available
38 TE 9263 1 ltr 5/11/2017 sachin Swastik hardware Available
39 polish 5 ltr 5/13/2017 sachin Swastik hardware Available
40 whiting powder 3 kg 5/13/2017 sachin Swastik hardware Available
41 roshan powder 3 kg 5/13/2017 sachin Swastik hardware Available
42 polish colour all colour mix 100 gm 5/13/2017 sachin Swastik hardware Available
43 2" brush 2 nos 5/13/2017 sachin Swastik hardware Available
44 flat brush 12no 2 nos 5/13/2017 sachin Swastik hardware Available
45 touch wood 3 ltr 5/13/2017 sachin Swastik hardware Available
46 nc thinner 3 ltr 5/13/2017 sachin Swastik hardware Available
47 golden brown 4 ltr 5/16/2017 sachin Swastik hardware Available
48 2" brush 2 nos 5/16/2017 sachin Swastik hardware Available
49 royale L105 2 ltr 5/16/2017 sachin Swastik hardware Available
50 TE L105 8 ltr 5/17/2017 sachin Swastik hardware Available
51 TE WHITE BASE 10 ltr 5/17/2017 sachin Swastik hardware Available
52 TE 8780 4 ltr 5/17/2017 sachin Swastik hardware Available
53 violet stainer 100 ml 5/17/2017 sachin Swastik hardware Available
54 POP 3 kg 5/17/2017 sachin Swastik hardware Available
55 3" BRUSH 2 nos 5/17/2017 sachin Swastik hardware Available
56 #150 3mm paper 30 nos 5/17/2017 sachin Swastik hardware Available
57 black oil paint 2 ltr 5/17/2017 sachin Swastik hardware Available
58 daon oil paint 4 ltr 5/17/2017 sachin Swastik hardware Available
59 TE L105 10 ltr 5/17/2017 sachin Swastik hardware Available
60 cotton roller 6" 2 nos 5/17/2017 sachin Swastik hardware Available
61 TE 9263 1 ltr 5/19/2017 sachin Swastik hardware Available
62 TE L105 8 ltr 5/19/2017 sachin Swastik hardware Available
63 Dawn enamel 2 ltr 5/29/2017 sachin Swastik hardware Available
64 thinner 2 ltr 5/29/2017 sachin Swastik hardware Available
65 colourless polish 2 ltr 5/30/2017 sachin Swastik hardware Available
66
Remarks
Murthi Residence - Tiles
Sr. No. Material Quantity Unit Issue Date Checked by Supplier Slip Remarks
1 J N 8 x 12 white 6 Boxes 4/13/2017 Sachin Parekh Tiles Available Amount to be paid (3500)
2 16 x 16 grey 5 Boxes 4/13/2017 Sachin Parekh Tiles Available
3 Grout grey 1 Kg 4/13/2017 Sachin Parekh Tiles Available
4 Pegvin Tiles 15x10 18 Boxes 4/18/2017 Dhananjay Parekh Tiles Available
5 Kovel Tiles 12x12 7 Boxes 4/18/2017 Dhananjay Parekh Tiles Available
6 pearl Black Granite 60x24 1 Nos 4/18/2017 Dhananjay Parekh Tiles Available
1 Zpearl Black Granite 20x20 2 Nos 4/18/2017 Dhananjay Parekh Tiles Available
2 Mangalore Roof Tiles (15 Each set) 30 Sets 4/18/2017 Dhananjay Parekh Tiles Available
3 Mangalore Roof Tiles (15 Each set) 8 Boxes 4/29/2017 Sachin Parekh Tiles Available Rs. 1500 to be paid
4 Mangalore Tiles Topi 14 Pcs 4/29/2017 Sachin Parekh Tiles Available Rs. 350 to be paid
5 Bags - - 4/29/2017 Sachin Parekh Tiles Available Rs. 200 to be paid
6 Mangalore Tiles Topi 6 Pcs 4/29/2017 Sachin Parekh Tiles Available Rs. 150 to be paid
7 Tab Botton Tiles (40 x 30) 40 Boxes 5/5/2017 Sachin Mahadev Tiles Available To be paid 12000
8 pearl Black Granite 100 sq ft 5/5/2017 Sachin kulkarni granite to be paid
9 pearl black granite 21 sq ft 5/9/2017 Sachin kulkarni granite to be paid
10 dolpuri ivory 2*2 2 nos 5/13/2017 Sachin Parekh Tiles available
11 dolpuri ivory 2*2 1 nos 5/9/2017 Sachin Parekh Tiles available
12 dado tiles 16 Box 5/15/2017 Sachin mahalaxmi tiles
13 floor tiles 3 box 5/15/2017 Sachin mahalaxmi tiles
14 white care 2 ltr 6/6/2017 Sachin deogiri
15 roff 1 ltr 6/6/2017 Sachin deogiri
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Item Nos L B D QTY Unit Net Qty Rate/unit Amount
RCC
excavation for footing 12 1.50 1.50 1.50 40.50 cum 40.50 350 14175.00
pcc for footing 12 1.50 1.50 0.10 2.70 cum 2.70 3600 9720.00
footing concrete 12 1.30 1.30 0.45 9.13 cum 9.13 4200 38329.20
column concrete upto plinth 12 0.23 0.38 1.95 2.05 cum 2.05 4200 8589.67
ucrm excavation 1 37.20 0.60 0.60 13.39 cum 13.39 350 4687.20
pcc for ucrm 1 37.20 0.60 0.10 2.23 cum 2.23 3600 8035.20
ucrm constuction 1 37.20 0.45 1.25 20.93 cum 20.93 3000 62775.00
murrum filling upto plinth bottom 1.25 7.50 7.50 0.75 52.73 cum 52.73 225 11865.23
1.25 3.90 3.90 0.75 14.26 cum 14.26 225 3208.36
plinth concrete 1 62.00 0.23 0.38 5.42 cum 5.42 4200 22758.96
pcc/bed for flooring 1 7.50 7.50 0.10 5.63 cum 5.63 3600 20250.00
1 3.90 3.90 0.10 1.52 cum 1.52 3600 5475.60

column concrete upto beam


bottom 12 0.23 0.38 3.00 3.15 cum 3.15 4200 13214.88
beam concrete 1 62.00 0.23 0.38 5.42 cum 5.42 4200 22758.96
slab concrete 1 10.50 7.50 0.15 11.81 cum 11.81 4200 49612.50
lintel concrete 1 62.00 0.23 0.15 2.14 cum 2.14 4200 8983.80
chajja concrete 1 32.00 0.45 0.09 1.22 cum 1.22 4200 5140.80
slab shuttering 1 7.50 10.50 10.76 847.35 sqft 1460.00 150 219000.00
steel 1 1.00 1.00 1.00 2542.05 kg 2542.05 53 134728.65

BBM
9" 1 38.25 1.00 2.85 109.01 sqmtr 105.62 1050 110905.83
4" 1 6.50 1.00 3.00 19.50 sqmtr 4.77 575 2742.75

deductions
9" 1 1.20 1.00 1.40 1.68 sqmtr
1 1.20 1.00 1.80 2.16 sqmtr
1 1.50 1.00 1.80 2.70 sqmtr
1 0.60 1.00 1.50 0.90 sqmtr
1 0.90 1.00 1.50 1.35 sqmtr
1 2.10 1.00 1.80 3.78 sqmtr
1 1.20 1.00 1.50 1.80 sqmtr
1 0.60 1.00 0.60 0.36 sqmtr
14.73 sqmtr

PLASTERING
ceiling 1 7.50 10.50 1.00 78.75 sqmtr 78.75 225 17718.75
Inside Plastering 1 56.40 1.00 3.15 177.66 sqmtr 177.66 225 39973.50
external 1 36.20 1.00 3.90 141.18 sqmtr 141.18 225 31765.50
WINDOWS
ms grill 1 158.49 2.60 1.00 412.09 kg 412.09 70 28846.05
aluminium 1 1.00 1.00 158.49 158.49 sqft 158.49 210 33283.91
DOORS
MD Teak wood frame 1 7.20 0.15 0.10 0.11 cum 0.11 194200 20973.60
MD teak wood shutter 1 1.00 0.90 2.10 1.89 sqmtr 1.89 9500 17955.00
flush doors prelaminated 2 1.00 1.00 1.00 2.00 nos 2.00 11000 22000.00
pvc doors for toilet 1 1.00 1.00 1.00 1.00 nos 1.00 5000 5000.00

FLOORING
vitrified 1 1.00 1.00 480.50 480.50 sqft 480.50 85 40842.50
vitified skirting 1 1.00 1.00 115.00 115.00 rft 115.00 25 2875.00
anti skid 1 7.50 4.00 1.00 30.00 sqft 30.00 65 1950.00
glazed dado 1 1.00 20.00 7.00 140.00 sqft 140.00 85 11900.00
kichen paltform 1 16.00 2.25 1.00 36.00 sqft 36.00 300 10800.00
kitchen dado 1 16.00 1.00 2.00 32.00 sqft 32.00 85 2720.00
granite jambs for toilets 1 17.50 1.00 1.00 17.50 rft 17.50 200 3500.00
jambs moulding - full 1 17.50 1.00 1.00 17.50 rft 17.50 45 787.50
granite on window sills 1 141.00 1.00 1.00 141.00 rft 141.00 200 28200.00
sills moulding - full 1 141.00 2.00 1.00 282.00 rft 282.00 45 12690.00
granite for MD steps 1 8.00 5.00 1.00 40.00 sqft 40.00 170 6800.00
moulding -full 4 5.00 1.00 1.00 20.00 rft 20.00 45 900.00
parking tiles 1 1.00 413.50 1.00 413.50 sqft 413.50 60 24810.00
parking skirting 1 1.00 1.00 75.00 75.00 rft 75.00 30 2250.00

PAINTING
ceiling with putty 1 1.00 840.00 1.00 840.00 sqft 840.00 18 15120.00
1 1.00 840.00 1.00 840.00 sqft 840.00 9 7560.00
Inside Painting 1 190.00 1.00 10.00 1900.00 sqft 1900.00 18 34200.00
MD Polish 1 2.00 3.00 7.50 45.00 sqft 45.00 100 4500.00
external painting 1 118.00 13.00 1.00 1534.00 sqft 1534.00 10 15340.00

RCC STAIR
Concrete 20 1.00 0.30 0.15 0.90 cum 0.90 4200 3780.00
2 1.80 0.90 0.15 0.49 cum 0.49 4200 2041.20
steel 1 1.00 1.00 150.00 150.00 kg 150.00 40 6000.00
shuttering 1 13.00 5.50 1.00 71.50 sqft 71.50 100 7150.00
ms railing 2 6.50 3.00 3.00 117.00 kg 117.00 85 9945.00
plastering 1 13.00 5.50 1.50 107.25 sqft 107.25 225 24131.25
tandoor for stair 1 1.00 25.00 10.76 269.00 sqft 269.00 55 14795.00
tandoor moulding 1 26.00 5.50 1.00 143.00 rft 143.00 45 6435.00
painting 1 13.00 5.50 1.50 107.25 sqft 107.25 9 965.25

COMPOUND WALL
excavation for ucrm 1 45.00 0.45 0.60 12.15 cum 12.15 500 6075.00
pcc for ucrm 1 45.00 0.45 0.10 2.03 cum 2.03 4200 8505.00
ucrm construction 1 45.00 0.45 1.50 30.38 cum 30.38 3000 91125.00
bbm 4" 1 45.00 1.00 1.40 63.00 sqmtr 63.00 550 34650.00
coping for bbm 1 45.00 0.10 0.08 0.34 cum 0.34 4200 1417.50
plastering 1 45.00 2.00 1.48 132.75 sqmtr 132.75 225 29868.75
shahbad flooring 1 45.00 3.00 1.00 135.00 sqft 135.00 30 4050.00
1 25.00 3.00 1.00 75.00 sqft 75.00 30 2250.00
painting 1 150.00 1.00 12.00 1800.00 sqft 1800.00 9 16200.00
MS Gate 1 13.00 5.00 5.00 325.00 kg 325.00 85 27625.00
Septic tank RCC 1 8000.00 litres 8000.00 9 72000.00

1591227.86
Plumbing 7.5% And Electric 7.5% 238684.18
1829912.04
Contractors profit 182991.20
Sub Total 2012903.24
Miscelleneous -332903.24
Grand Total 1680000.00

2000.00
Item Qty
Ex 66.04 500 33021
Pcc 14.44 4200 60650.1
Rcc 41.72 4200 175209.972
Ucrm 51.30 3000 153900
Murrum 66.99 225 15073.5938
Shuttering 1531.50 130 199095
Steel 2542.05 42 106766.1
BBM9" 105.62 1050 110905.83
6" 67.77 575 38967.75
Door 65928.60
Window 62129.96
IN. Plaster 256.41 57692.25

out.Plaster 141.18 31765.50


Floor 151025.00
Vitrified 595.50 43717.50
Granite RFT 158.50 45177.50
Granite SFT 40.00 6800.00
Anti Skid 443.50 26760.00
Tandoor 21230.00
0
Painting 0
Inside 61380.00
Outside 15340.00
Grill 4945.04
Items Nos L B D QTY Unit Deductions
column concrete upto
beam bottom 12 0.23 0.38 3.00 3.15 cum
beam concrete 1 72.00 0.23 0.38 6.29 cum
slab concrete 1 7.50 10.50 0.15 11.81 cum
lintel concrete 1 62.00 0.23 0.15 2.14 cum
1 5.00 0.15 0.15 0.11 cum
chajja concrete 1 42.00 0.45 0.09 1.61 cum
Pardi 1 4.00 4.50 0.09 1.62 cum
1 3.00 4.00 0.09 1.08 cum
slab shuttering 1 7.50 10.50 10.76 847.35 sqft
steel 1 1.00 1.00 2372.58 2372.58 kg
Loft
BBM
9" 1 62.00 1.00 3.00 186.00 sqmtr 186.00
4" 1 6.00 1.00 3.30 19.80 sqmtr 19.80

deductions
9" W1 4 1.00 1.20 1.80 8.64 sqmtr
W4 1 1.00 0.90 1.50 1.35 sqmtr
V 2 1.00 0.60 0.60 0.72 sqmtr
SD 1 1.00 3.20 2.20 7.04 sqmtr
17.75 sqmtr

PLASTERING
ceiling 1 7.50 10.50 1.00 78.75 sqmtr
Inside 1 65.00 1.00 3.00 195.00 sqmtr

external 1 65.00 1.00 3.00 195.00 sqmtr

WINDOWS
ms grill 1 17.75 21.00 1.00 372.75 kg
aluminium 1 17.75 10.76 1.00 190.99 sqft

DOORS
flush doors prelaminated 3 1.00 1.00 2.10 3.00 nos
pvc doors for toilet 2 0.75 1.00 2.10 2.00 nos
FLOORING
vitrified 1 1.00 1.00 492.00 492.00 sqft
vitified skirting 1 1.00 1.00 158.00 158.00 rft
anti skid attach 1 1.00 171.00 1.00 171.00 sqft
Glazed tilesbathroom 1 1.00 40.00 7.00 280.00 sqft
granite jambs for toilets 2 17.50 1.00 1.00 35.00 rft
jambs moulding - full 2 17.50 1.00 1.00 35.00 rft
granite on window sills 1 104.00 1.00 1.00 104.00 rft

PAINTING
ceiling with putty 1 24.00 35.00 1.00 840.00 sqft
Inside 1 212.00 1.00 10.00 2120.00 sqft
external painting 1 120.00 10.00 1.00 1200.00 sqft

RCC STAIR
Concrete 20 1.00 0.30 0.15 0.90 cum
1 1.80 0.90 0.15 0.24 cum
steel 1 1.00 1.00 137.16 137.16 kg
shuttering 1 23.00 3.00 1.00 69.00 sqft
ms railing 1 1.00 1.00 204.00 204.00 kg
plastering 1 13.00 5.50 1.50 107.25 sqft
Steps 22 3.00 1.00 1.00 66.00 sqft
moulding 20 3.00 1.00 1.00 60.00 rft
painting 1 23.00 3.00 1.00 69.00 sqft
Railing Paint 1 104.00 2.00 1.00 208.00 sqft

Electric 7.5%
Plumbing 7.5%
Sub total=
Total=
Contractors profit
Total=
Miscelleneous
Grand total=
rate/unit Amount

4200 13214.88
4200 26429.76
4200 49612.50
4200 8983.80
4200 472.50
4200 6747.30
4200 6804.00
4200 4536.00
150 127102.50
53 125746.74

1050 195300.00 Lifting 206685.00 51671.25


575 11385.00

235 18506.25
235 45825.00

235 45825.00 Lifting 110156.25 27539.06

70 26092.50
210 40107.90

11000 33000.00
5000 10000.00
85 41820.00
25 3950.00 Lifting 110060.00 27515
65 11115.00
85 23800.00
200 7000.00
45 1575.00
200 20800.00

18 15120.00
18 38160.00
9 10800.00

4200 3780.00
4200 1020.60
53 7269.48
130 8970.00
85 17340.00
225 24131.25
55 3630.00
45 2700.00
9 621.00
9 1872.00

1041165.96
78087.45
78087.45
Sub total= 1197340.85
Total= 1197340.85
119734.09
Total= 1317074.94
Miscelleneous 12925.06
Grand total= 1330000
Items Nos L B D QTY Unit Deductions
column concrete upto
beam bottom
4 0.23 0.38 1.20 0.42 cum
2 0.23 0.38 2.10 0.37 cum
beam concrete 1 20.00 0.23 0.38 1.75 cum
slab concrete 1 4.00 2.00 0.15 1.20 cum
Sloped roof 1 8.50 1.00 0.15 1.28 cum
lintel concrete 1 12.00 0.23 0.15 0.41 cum
slab shuttering 1 4.00 2.00 10.76 86.08 sqft
1 4.00 4.00 10.76 172.16 sqft
steel 1 1.00 1.00 710.16 710.16 kg
BBM
9" 1 27.13 1.00 2.00 54.26 sqmtr 53.29

deductions
9" v1 1 3.20 0.45 0.23 0.33 sqmtr
v2 2 3.10 0.45 0.23 0.64 sqmtr
. 0.97 sqmtr

PARAPET
bbm 4" 1 36.00 1.00 1.00 36.00 sqmtr
coping for bbm 1 36.00 0.23 0.08 0.62 cum
plastering 1 25.00 1.00 2.03 50.75 sqmtr
Railing 1 9.00 1.00 21.00 189.00 Kgs

PLASTERING
ceiling 1 4.00 2.00 1.00 8.00 sqmtr
1 8.50 1.00 1.00 8.50 sqmtr
Inside 1 27.00 1.00 2.40 64.80 sqmtr
external beautification 1 200.00 1.00 1.00 200.00 sqmtr
external 1 32.00 1.00 2.40 76.80 sqmtr

WINDOWS
ms grill 1 4.23 21.00 1.00 88.83 kg
aluminium 1 4.23 10.76 1.00 45.51 sqft

DOORS

flush doors prelaminated 2 1.00 1.00 2.10 2.00 nos

FLOORING
vitrified 1 4.00 4.00 16.00 256.00 sqft
vitified skirting 1 1.00 1.00 51.00 51.00 rft
V1 1 73.50 1.00 1.00 73.50 rft
Cladding 1 1.00 16.00 12.00 192.00 sqft
1 1.00 17.00 12.00 204.00 sqft
PAINTING
ceiling with putty 1 10.76 16.50 1.00 177.54 sqft
Inside 1 64.80 1.00 10.76 697.25 sqft
external painting 1 142.00 10.00 1.00 1420.00 sqft
Parapet 1 36.00 10.76 2.03 786.34 sqft

Electric 5%
Sub total=
Total=
Contractors profit
Total=
Miscelleneous
Grand total=

GF 1680000.0
FF 1330000.0
SF 465000.0
Total= 3475000.0 1900
1828.947
rate/unit Amount

4200 1761.98
4200 1541.74
4200 7341.60
4200 5040.00
4200 5355.00
4200 1738.80
150 12912.00 Lifting 12912.00 3228
150 25824.00
53 37638.48

1050 55951.45 Lifting #REF! #REF!

1030 37080.00
4900 3042.90 Lifting 51541.65 18039.58
225 11418.75
85 16065.00

235 1880.00 Item GF.Amount


235 1997.50
225 14580.00 Excavaton & Rcc 663309.02
50 10000.00 BBM 113648.58
225 17280.00 Lifting 45737.50 16008.12 Plastering 89457.75
Windows 62129.96
Doors 65928.60
85 7550.55 Flooring 151025.00
210 9558.11 Painting 76720.00
Rcc Stair 75242.70
Compound 221766.25

10000 20000.00 Lifting


Head Room
Water tank
85 21760.00 Total= 1519227.86
25 1275.00
200 14700.00
85 16320.00
85 17340.00

9 1597.86
9 6275.23
9 12780.00
9 7077.07

404683.02
20234.15
Sub total= 424917.17
Total= 424917.17
42491.72
Total= 467408.89
Miscelleneous -2408.89
Grand total= 465000
FF.Amount SF.Amount

369649.98 99153.60
206685.00 206685.00
110156.25 110156.25
66200.40 66200.40
43000.00 43000.00
110060.00 110060.00
64080.00 64080.00
71334.33 71334.33
- -

Err:509 #REF!
#REF!
#REF!
Err:509 #REF!
Item Quantity Unit Rate Amount

Excavation
Excavation for footing 40.50 Cum 500.00 20250.00
Excavation for Plinth 13.39 Cum 500.00 6696.00
RCC
Ground Floor
First Floor
Second Floor
Head Room

BBM
9"
4"

PLASTERING
ceiling
Inside Plastering
external
Columns

WINDOWS
ms grill
aluminium

DOORS
MD Teak wood frame
MD teak wood shutter
flush doors prelaminated
pvc doors for toilet

FLOORING
vitrified
vitified skirting
anti skid
glazed dado
kichen paltform
kitchen dado
granite jambs for toilets
jambs moulding - full
granite on window sills
sills moulding - full
granite for MD steps
moulding -full
parking tiles
parking skirting

PAINTING
ceiling with putty
Inside Painting
MD Polish
external painting

RCC STAIR
Concrete
steel
shuttering
ms railing
plastering
tandoor for stair
tandoor moulding
painting

COMPOUND WALL
excavation for ucrm
pcc for ucrm
ucrm construction
bbm 4"
coping for bbm
plastering
shahbad flooring

painting
MS Gate
sump tank RCC

Plumbing And Electric

Contractors profit
Slno Item No L B D Qty Unit Rate Amount Remark
1 Brick work
Balcony to dressing 1 3 2.1 1 6.3 Sqm 1100 6930.00

2 Plaster 2 3 2.1 1 12.6 Sqm 225 2835.00

3 Paint 12.6 Sqm 120 1512.00

4 Ladder 1 1.5 8 2 24 L/s 85 2040.00

5 Commod 3 1 1 1 3 nos 3500 10500.00

6 UPS gate 1 4 3 2 24 L/s 85 2040.00

7 Partition glass 1 2 4 1 8 L/s 550 4400.00

8 Kitchen platfrom 1 6 - - 6 Rft 900 5400.00

9 Bath reno. 1 L/s 5000 5000.00

Total= 40657
Slno Item No L B D Qty Unit Rate Amount Remark

1 Excavation 1 12 0.75 0.45 4.05 Cum 150 607.50

2 UCRM 1 12 0.45 0.9 4.86 Cum 3200 15552.00

4 BBM 1 12 1 1.35 16.2 Sqm 500 8100.00

5 Plaster 1 12 3.23 1 38.76 nos 180 6976.80

Total= 31236.3