BACK UP DATA

PEKERJAAN : PEMBANGUNAN JALAN LINGK. SABIA (MADRASAH)


ITEM
: PENYIAPAN BADAN JALAN
PEKERJAAN
LEBAR
LEBAR VOLUME
PANJANG RATA-RATA
NO. STA
(M) PANJANG X LEBAR X TEBAL
(M)
(M)

1 0 + 000 4.00
50.00 4.00 50 M1 X 4.00 M1 = 200.00 M2
2 0 + 050 4.00
26.00 3.75 26 M1 X 3.75 M1 = 97.50 M2
3 0 + 076 3.50
24.00 3.75 24 M1 X 3.75 M1 = 90.00 M2
4 0 + 0100 4.00
26.00 4.00 26 M1 X 4.00 M1 = 104.00 M2
5 0 + 0126 4.00
10.00 4.00 10 M1 X 4.00 M1 = 40.00 M2
6 0 + 0136 4.00

VOLUME 531.50 M3