Impact test is required for all carbon steel, at temperature of -5ºC. Acceptance criteria shall be
the greater of 27 J (20 ft-lb) average, 20 J (15 ft-lb) minimum or as required by the
design code or material specification, whichever is most restrictive.
100% MT shall be done for all machined butt welding ends.
Hydrostatic testing of 100% of finished pipes is required, with a test pressure according to
material standard.
All pipes shall be supplied with a plastic or metal cover at the ends for protection.
The supplier shall consider a protective coating of pipes, for rust prevention during
transportation.
Colour coding shall be in accordance with document 80080-MTO-0000-SP-004.
For all pipes, the supplier shall consider that all material shall comply with the requirement for
packaging, marking and shipping indicated in document 80080-GT-017-E.
Supplier shall consider that the delivery of the scope of supply could be separated in different
destination of different prefabrication shops, which may be located in other different countries of
Algeria.
4. ORDER OF PRECEDENCE
If any inconsistency or conflict exists between or within the attached and listed documents in
this material requisition, FEED documents, PROJECT documents, Industry Standards, Laws,
Codes, Drawings… it shall be the responsibility of the VENDOR to bring it to the attention of the
CONTRACTOR in writing as soon as it is detected. Until the resolution is officially made by
CONTRACTOR, the most stringent shall govern unless the CONTRACTOR pre-agreed written
waiver is provided.
6. INSPECTION AND MATERIAL CERTIFICATION
VENDOR shall conduct all necessary tests and/or inspections in accordance with the minimum
requirements established in the CONTRACT documents and PROJECT Specifications. Test
and Inspections to be carried out during the course of manufacturing shall be included in the
Inspection and Test Plan (ITP) that should be submitted for PURCHASER approval according
to the Vendor Drawing and Data Requirements (VDDR).
The proposed Inspection and Test Plan (ITP) shall be based on applicable data sheets,
specifications and standards.
VENDOR shall consider the following inspection requirements:
Notification of Inspection: 100%
Check of Material Test Certificates: 100%
PMI
Witnessed Hydrostatic Test: 10%
Final Inspection (Visual and Dimensional): 10%