Competition Workshop ECLIPSE 300

By: Víctor Huerta Quiñones


Grid Model: Initial Gas Saturation

Swi =15%
Pr = 3350 psia @ 6100ft
GWC = 6900ft
Compositional Model Initialization
FGIP 17,189 BCF
Yield Promedio 62,14 STB/MMSCF
FOIP 1,1 MMSTB
Tutorial E300: RUNSPEC Section
RUNSPEC keyword
Title (TITLE)
MODELO EOR
Phases present
OIL WATER GAS ISGAS
Number of grid cells (DIMENS)
(NX) 20 (NY) 1 (NZ) 5
Tutorial E300: RUNSPEC Section
Choice of units
FIELD (METRIC) (LAB)
Specifies the number of components to be used in
the simulation.
COMPS
13 /
Tutorial E300: RUNSPEC Section
Maximum number of relative permeability tables
and PVT tables (TABDIMS)
(The number of saturation tables) 1
(The number of PVT tables) 1
(The max number of saturation nodes in any saturation
table) 40
(The max number of pressure nodes in any PVT table)
40
Tutorial E300: RUNSPEC Section

Maximum number of wells, connections & groups


(WELLDIMS)
(max wells) 1* (max connections/well) 10
(max groups) 2 (max wells/group) 1*

Start date (START)


1 Jan 2012
Tutorial E300: GRID Section
Defines the geometry of the simulation
grid and the various rock properties:
geometry
– size and location of each grid block
rock properties
– porosity and absolute permeability
Tutorial E300: GRID Section

Starts with GRID keyword


Model will use block centred geometry
Data for each grid block can be
specified in either of two ways:
1 Defining values for each cell, one at
a time
2 Defining a value for a box which
contains a group of cells
Tutorial E300: SECTION GRID
Example:
INIT (create an .INIT file)
DXV (specify grid block dimensions in
the x direction)
20*200 /
DYV (specify grid block dimensions in
the y direction)
1*1000 /
Tutorial E300: SECTION GRID
Specify cell thicknesses ( DZ ), horiz.
permeabilities ( PERMX ), porosities ( PORO )
for each layer of the grid and also cell top
depths ( TOPS )
Tutorial E300: SECTION GRID

RPTGRID (The keyword should be followed by


a string of mnemonics to request output of grid
data to the print file)
DX DY DZ PERMX PERMY PERMZ PORO NTG TOPS MIDS /
Tutorial E300: PROPS Section
Starts with PROPS keyword
For a compositional, only the water density
(DENSITY)
Include relative permeability and capillary pressure
tables
– INCLUDE
– 'RELPFLD.DAT‘ / (create an .data file)
Oil PVT properties (Equation of state)
– INCLUDE
– 'PVT1.PVO' / (create an .PVO file)
Tutorial E300: PROPS Section
Water PVT functions PVTW
– reference pressure (Pref) : 3350psia
– water FVF @ ref. pressure, Bw(Pref) :
1.00528 RB/STB
– water compressibility : 5x10-6
– water viscosity @ ref. pressure μw (Pref) :
0.55730 cp
– water viscosibility : 5.89998x10-6
Rock compressibility (ROCK)
Tutorial E300: PROPS Section
Tutorial E300: SOLUTION
Section
Initial reservoir conditions are set by one of:
1 EQUILIBRATION - Define pressure at
datum depth to allow internal pressure vs.
depth tables to be calculated.
2 RESTART - Load pressures and
saturations for each grid cell from a
previous run.
3 ENUMERATION - Specify pressures and
saturations for each cell explicitly.
Tutorial E300: SOLUTION
Section
Starts with SOLUTION keyword

Use Equilibration data (EQUIL)


– pressure at datum depth
– WOC
– GOC
Tutorial E300: SOLUTION
Section
Introduces a field separator, used to
define separator oil and gas in place.
FIELDSEP
– The stage index.
– The field separator stage temperature.
– The field separator stage pressure.
Tutorial E300: SOLUTION
Section
Tutorial E300: SCHEDULE
Section
Drives the simulator by defining:
Well locations and completions
Production and injection rates and
pressures
Time steps
– for calculations
– for reports
Tutorial E300: SCHEDULE
Section
Starts with SCHEDULE keyword
WELSPECS and COMPDAT to specify
– Vertical oil & gas production well
(.prod)
– Vertical water injection well (.inj)
Tutorial E300: SCHEDULE
Section
WCONPROD – P1
– produce 3000 Mscf/day of oil
– minimum BHP limit of 500 psia
WCONPROD – P2
– produce 3000 Mscf/day of oil
– minimum BHP limit of 500 psia
TSTEP gives each t (each 0.1 days)
Tutorial E300: SCHEDULE
Section
Tutorial E300: SCHEDULE
Section
DATES list of dates at which
reports are required. Each date
must be on a separate line
terminated by a slash (/).
Run for 20 years max
Tutorial E300: SUMMARY
Section

Keywords usually have four letters


1st letter F Field
R Region
W Well
C Completion
B Block
Tutorial E300: SUMMARY
Section

2nd letter O Oil (@ surface)


W Water (@ surface)
G Gas (@ surface)
L Liquid (oil + water @ surface)
V Volume (in reservoir)
3rd letter P Production
I Injection
Tutorial E300: SUMMARY
Section

4th letter R Rate


T Total (or cumulative)

Examples:
FOPR Field Oil Production Rate
WWIT Well Water Injection Total
Tutorial E300: SUMMARY
Section

Some exceptions
WWCT Well Water Cut
WBHP Well Bottom Hole Pressure
FPR Field Average Pressure
CPR Connection Pressure
FGOR Field Gas Oil Ratio

You might also like