DRY GAS SEAL REPLACEMENT PROCEDURE


MP COMPRESSOR 28-KA-3122A/B

Rev: 00 Date: 20/03/2016 Page: 1 of 20


Maintenance plan No: xxxxxxxxxx

1 PURPOSE
This procedure describes Dry Gas Seal Replacement to be carried out on the Thermodyne RB6B Centrifugal
Compressor 28-KA-3122A/B at OFP2.

2 SCOPE
This procedure is for use on OFON – OML102.

3 REVISION

00 20/03/2016 First draft issue


Revision Date Note

4 APPROVAL

Prepared by Reviewed by Verified by Authorized by

Aniefiok UMOH/
Tolulope JOHN/
Name Alfredo UZCATEGUI Jose-Aime
Julien AOUST
FERNANDEZ

Date

Signature

This document is the property of Total. It must not be stored reproduced or disclosed to others without written approval from the Company.
JVA Offshore OML102 INT-PRD-102-MTCM-XXXXX

DRY GAS SEAL REPLACEMENT PROCEDURE


MP COMPRESSOR 28-KA-3122A/B

Rev: 00 Date: 20/03/2016 Page: 2 of 20


Maintenance plan No: xxxxxxxxxx

5 CONTENTS

1 PURPOSE ................................................................................................................................................................... 1
2 SCOPE......................................................................................................................................................................... 1
3 REVISION .................................................................................................................................................................. 1
4 APPROVAL ................................................................................................................................................................ 1
5 CONTENTS ................................................................................................................................................................ 2
6 DEFINITIONS & ABREVIATIONS .......................................................................................................................... 3
7 RESPONSIBILITIES .................................................................................................................................................. 3
8 ASSOCIATE DOCUMENTS ..................................................................................................................................... 3
9 REQUIRED TOOLS/EQUIPMENTS ......................................................................................................................... 3
10 SAFETY & ENVIRONMENT .................................................................................................................................... 4
11 INTERVENTION ......................................................................................................................................................... 4
11.1 PREPARATION ........................................................................................................................................... 4
11.2 ISOLATION ................................................................................................................................................. 4
11.3 DRIVE SIDE (DE) DRY GAS SEAL REPLACEMENT ............................................................................ 5
11.4 NON DRIVE SIDE (NDE) DRY GAS SEAL REPLACEMENT .............................................................. 10
11.5 DE-ISOLATION ......................................................................................................................................... 15
12 RUNNING TEST AND OBSERVATION….…………………..…………………………………………………15
12.1 Run test & parameter recording .................................................................................................................. 15
12.2 Observations & remarks……………………………………………………………………………………15
12.3 Completion .................................................................................................................................................. 16

This document is the property of Total. It must not be stored reproduced or disclosed to others without written approval from the Company.
JVA Offshore OML102 INT-PRD-102-MTCM-XXXXX

DRY GAS SEAL REPLACEMENT PROCEDURE


MP COMPRESSOR 28-KA-3122A/B

Rev: 00 Date: 20/03/2016 Page: 3 of 20


Maintenance plan No: xxxxxxxxxx

6 DEFINITIONS & ABREVIATIONS


 ISO: International Organization for Standardization.
 P&ID: Piping & Instrumentation Diagram.
 SAP: Stands for Systems, Applications and Products.
 DE : Drive End Side
 NDE : Non Drive End Side
 DGS : Dry Gas Seal

7 RESPONSIBILITIES
Job Description: mechanical’s scope of work for DE & NDE Dry Gas Seal Replacement on the Thermodyne RB6B
Centrifugal Compressor 28-KA-3122A/B at OFP2
 Duration : 70 hours (7 days)
 Number of workers: 1 FSR GE + 2 MEC workers + 1 Instrument Technician (required partially)

8 ASSOCIATE DOCUMENTS
 P&ID Drawing No:
IPLSH021624 – Tandem Seal Gas P&ID MP Compressor 28-KA-3122A&B
NG 018 P2 HHI 109320 – MP Compressor Suction Cooler and Scrubber Train A
NG 018 P2 HHI 109321- MP Gas Compressor Train A
NG 018 P2 HHI 109324 - MP Compressor Suction Cooler and Scrubber Train A
NG 018 P2 HHI 109325 - MP Gas Compressor Train A
 Thermodyne RB6B Operation and Maintenance Manuals

9 REQUIRED TOOLS/EQUIPMENTS
 Common mechanical tools: brass hammer, spanner, wrench, torque wrench, dial gauge, inside micrometer,
outside micrometer, depth gauge, greasing equipment, paint brush, barricade tape, rags
 Special tools : as specified in Thermodyne RB6B special tools list in document no. NG-018-P2-TNS-700018
SPECIAL TOOLS LIST MP/HP Compressor Packages as below :

Drawing
Quantity Specific Tool / Device Intended Use
Nb/Refference
1 Pc C-Spanner for Coupling Hub Nut for MP To remove coupling hub CPD900026
1 Pc Eye Bolt (M12) for Bearing and Seals Housing for MP To lift bearing and seal housing N.A.
1 Pc Bearing Assembly Sleeve – Discharge/DE side for MP To dismantle the bearing CDD902467
1 Pc Bearing Assembly Sleeve – Inlet/NDE side for MP To dismantle the bearing CDD902467
1 SET Guiding rod for bearing housing MP To extract bearing housing F**90072
To dismantle the bearing
1 SET Jack screws (Screw H M12-150) for bearing housing for MP CDD901118
housing
1 SET Seal Puller for MP To remove Dry Gas Seal CDD900146
1 SET Stem (Stem M12-130) for cover of thrust side for MP To remove Thrust Housing CDD901168
1 SET Thrust collar puller for MP To remove Thrust Collar CDP900011
- SKF729101B is used to
Coupling hub puller and pusher which included :
remove/install hub coupling
- HP Hydraulic pump SKF729101B (2450 Bar) included
and thrust collar (as the
with PG, HP flexible hose and fitting connections
1 SET expander) IPLAC101450
- Hydraulic pump SKF 729124 (100 MPa) included with
- SKF 729124 is to install Hub
PG, flexible hose and fitting connections
Coupling only (as the pusher)
- Coupling hub puller/pusher assembly

This document is the property of Total. It must not be stored reproduced or disclosed to others without written approval from the Company.
JVA Offshore OML102 INT-PRD-102-MTCM-XXXXX

DRY GAS SEAL REPLACEMENT PROCEDURE


MP COMPRESSOR 28-KA-3122A/B

Rev: 00 Date: 20/03/2016 Page: 4 of 20


Maintenance plan No: xxxxxxxxxx

10 SAFETY & ENVIRONMENT


 Prepare a Work Permit included Process & Electrical Isolation Permit.
 Sign the Work Permit in accordance with the different authorities.
 Inform the Control Room at the commencement and at the completion of the planned work.
 Perform tool box talk to all team member about the job sequence, its hazard, compensatory measure and
precautions to be taken prior starting the job
 Ensure that all scaffolding to be used is authorized with a valid Scaff-Tag
 Comply with ISO 14001 policies
 Prior opening the piping of gas line or opening any parts on the compressor which expose with the gas, ensure
the pressure of the compressor have been completely depressurized to ‘ZERO’ Bar and gas test reading
indicated less than 5 % LEL
 There are three types of safety requirements in this procedure : WARNING, CAUTION and NOTE which are
intended to emphasize critical information.
WARNING : point out a procedure, practice, condition or precaution which, if not heeded, could result in
personal injury or loss of life
CAUTION : point out a precaution which, if not observed, could result in damage or destruction of equipment
NOTE : highlight information necessary to understand or follow a procedure, practice, conditions, or
description

11 INTERVENTION
11.1 PREPARATION
 Scaffolding to be erected to reach all of the required areas and to be requested min 48h prior intervention
 Read the procedure completely before starting the job for better planning and coordination
 Sign the opening of the Work Permit in the Control Room with the nominated operating authority
representative for the intervention
 Inform the Control Room before isolation and commencement of the job

11.2 ISOLATION
Location Task OK
Control Room Inform the Control Room before starting process isolation 
Electrical to perform an electrical isolation on the main electrical motor and auxiliaries as per Electrical
Isolation certificate

Production team to perform Process isolation as per Process/Mechanical Isolation Certificate which
In the Field
refer to Spading Plan and Process Isolation of related procedure under Production

Instrumentation/Automation to perform the necessary inhibitions 

This document is the property of Total. It must not be stored reproduced or disclosed to others without written approval from the Company.
JVA Offshore OML102 INT-PRD-102-MTCM-XXXXX

DRY GAS SEAL REPLACEMENT PROCEDURE


MP COMPRESSOR 28-KA-3122A/B

Rev: 00 Date: 20/03/2016 Page: 5 of 20


Maintenance plan No: xxxxxxxxxx

11.3 DRIVE SIDE (DE) DRY GAS SEAL REPLACEMENT

N HUB COUPLING REMOVAL Done Comment

NOTE :
1 Put the marking with the permanent marker for all assembly parts i.e. coupling, hub coupling etc. before dismantling 
these parts from its existing installation to make easier and ensure that all parts to be reinstalled to its original position

2 Remove the coupling guard with its related connected piping 


Disconnect the coupling HP-MP compressor and measure DBSE (Distance Between Shaft End) as below:

3 

Measure the distance between hub face to shaft end (A1) before installing the special tool for hub removal. This practice will
ensure us that we can re-install the hub coupling back to its original position.

4 

Install the dial gauge and check the shaft end play which should be of 0.35 to 0.45 mm.
5 NOTE : IF THE VALUE IS OUT OF 0.35 TO 0.45 MM, PERFORM ADJUSTMENT OF THE THRUST BEARING 
END CLEARANCE IF REQUIRED

This document is the property of Total. It must not be stored reproduced or disclosed to others without written approval from the Company.
JVA Offshore OML102 INT-PRD-102-MTCM-XXXXX

DRY GAS SEAL REPLACEMENT PROCEDURE


MP COMPRESSOR 28-KA-3122A/B

Rev: 00 Date: 20/03/2016 Page: 6 of 20


Maintenance plan No: xxxxxxxxxx

6 - Remove hub coupling with the special tools as below :

- Install the hub remover onto the shaft end, Tighten and release 1-2 turns.
- Install the hydraulic jack equipment (SKF72910B) included with its accessories and fitting connections
- Release any trapped air inside the hydraulic system

Pump the hydraulic to pressure 1500 Barg, wait for 5 minutes. If there is no movement increase pressure up to 1800 Barg, wait
7 for 5 minutes, if no movement increase the pressure up to 2000 Barg. ( max pressure 2450 Barg) 
Note : Impact sound will be heard if the coupling hub is already loosen out from the shaft
N REMOVAL AND DISASSEMBLY OF DE JOURNAL BEARING – Reff Drawing CDD300534 & CDD902466 Done Comment
1 CAUTION: Be careful with temperature cable sensor and don’t let any removed parts fall into lube oil drain port 
2 Remove all pipings to make it possible to withdraw the bearing housing 
3 Remove the baffle (17) – see CDD300534 
4 Remove all screws (42) and DE guard assembly (16) - see CDD300534 
5 Remove probes, bracket and RTD 
Remove all screws (43) and the bearing housing (15) using tools CDD902466 as below :

6 

NOTE:
- Item 3 (1 Pc) = sleeve CDD902488
- Item 4 (2 Pcs) = guiding rod F**90072 Nb.2
- Item 7 (2 Pcs) = screw M10x100x100
- Item 13 (1 Pc) = lifting lug M12
Remove all screws (36) and the baffle bearing (5) – see CDD300534
7 

This document is the property of Total. It must not be stored reproduced or disclosed to others without written approval from the Company.
JVA Offshore OML102 INT-PRD-102-MTCM-XXXXX

DRY GAS SEAL REPLACEMENT PROCEDURE


MP COMPRESSOR 28-KA-3122A/B

Rev: 00 Date: 20/03/2016 Page: 7 of 20


Maintenance plan No: xxxxxxxxxx

N INSPECTION OF DE JOURNAL BEARING Done Comment


Inspect the bearing pads and housing thoroughly. Check the bearing surface of each tilting pad for signs of wear or score marks.
1
Replace any pad that show excessive wear

2 Inspect all remaining parts for cleanliness or any other visual damage and repair, or replace it if necessary 
N REMOVAL OF DE DRY GAS SEAL (DGS) – Reff NG-018-P2-TNS-701530, NG-018-P2-TNS-700540 and CDD902469 Done Comment
On the cover NDE side - Lock the shaft in its running position. The key-groove of rotor with mark “O’ in front of anti rotation
pin in seal. Use the stud item 11 and the locking plate item 12 secured by nuts item 7

1 

NOTE :
if only to replace DE Dry Gas Seal, the shaft will be still hold by its thrust bearings therefore no need to install this shaft
locking tools at NDE side

Remove the ring item 32, split ring item 30 and the drive collar item 1.11 as per seals assembly drawing CDD500141 as below :

2 

Install the setting plates it. 34 and 36 of seal assembly drawing CDD500141 and ensure that the marks "T" of all parts of seal are
3
aligned.

4 Install the ring item 15 on the shaft 

This document is the property of Total. It must not be stored reproduced or disclosed to others without written approval from the Company.
JVA Offshore OML102 INT-PRD-102-MTCM-XXXXX

DRY GAS SEAL REPLACEMENT PROCEDURE


MP COMPRESSOR 28-KA-3122A/B

Rev: 00 Date: 20/03/2016 Page: 8 of 20


Maintenance plan No: xxxxxxxxxx

5 On the seal cartridge - Fix the support item 18 on setting plates item 16 with the 4 screws CHC item 19. Install the support item
17 secured screws H item 20

6 On the DE cover – Fix the guiding rod item 21 
7 On the shaft – Install sleeve of protection item 2 and the nut item 23 
8 On the shaft - Install items 1-4-5 with screws item 3 
On sleeve – Screw the screw item 4 to pull the seals cartridge and remove it with the support item 17

9 

WARNING : FULLY ATTENTION AND USE THE PROPER LIFTING DEVICE FOR HANDLING THE DRY GAS
SEAL TO AVOID THE DROP OBJECT WHICH COULD LEAD PEOPLE INJURY AND/OR MATERIAL DAMAGE
10 Remove the tools 
N INSPECTION OF DE DRY GAS SEAL Done Comment
Shaft and seal housing inspection: check to all surfaces to contacted by O-rings for any sharp angle, sharp surface, roughness
and rust spot to prevent O-ring damage during installation
1
NOTE : shaft and seal housing surface roughness shall not exceed 1.6 micron. All pitting and rust spots must be

removed, and any imperfection must be corrected before seal installation
2 Inspect ‘O’ rings for nicks, cuts or deterioration and replace as necessary 
3 Inspect all remaining parts for cracks, breaks excessive wear or any other damage and repair or replace as necessary 
INSTALLATION OF DE DRY GAS SEAL (DGS)
N Done Comment
Reff NG-018-P2-TNS-701530, NG-018-P2-TNS-700540 and CDD902469
On the NDE cover - Lock the shaft in its running position. The key-groove of rotor with mark "0" in front of anti-rotation pin in
seal. Use the stud item 11 and the locking plate of immobilization item 12 secured by nuts item 7 and 24 as below :

1 

NOTE :
if only to replace DE Dry Gas Seal, the shaft will be still hold by its thrust bearings therefore no need to install this shaft
locking tools at NDE side

This document is the property of Total. It must not be stored reproduced or disclosed to others without written approval from the Company.
JVA Offshore OML102 INT-PRD-102-MTCM-XXXXX

DRY GAS SEAL REPLACEMENT PROCEDURE


MP COMPRESSOR 28-KA-3122A/B

Rev: 00 Date: 20/03/2016 Page: 9 of 20


Maintenance plan No: xxxxxxxxxx

2 On the seal cartridge - Install the setting plates it. 34 and 36 of seal drwg assembly CDD500141 and ensure that the marks "T"
of all parts of seal are aligned (see as below) :

3 On the seal cartridge - Ensure the installation of “O” ring without damage, lightly grease. 
NOTE : job sequence from #4 until #11 refer to the picture as below

4 

5 On the shaft – Installation of ring item 15 on the shaft 


6 On the shaft – Install sleeve of protection item 2 and the adaptor item 8. Use the protection sleeve of tool CDD902469 
7 Fix the support item 18 on setting plates with the 4 screw item 19. Install the support item 17 and fix them with 2 screw item 20 
8 On DE cover – Fix the guiding rod item 21 on the cover 
9 Install the cartridge and ensure alignment of anti-rotation pin and “O” in upper part 

This document is the property of Total. It must not be stored reproduced or disclosed to others without written approval from the Company.
JVA Offshore OML102 INT-PRD-102-MTCM-XXXXX

DRY GAS SEAL REPLACEMENT PROCEDURE


MP COMPRESSOR 28-KA-3122A/B

Rev: 00 Date: 20/03/2016 Page: 10 of 20


Maintenance plan No: xxxxxxxxxx

10 On shaft - Fix the sleeve item 2 with the screws item 3 and install 6-14-13-9-10 as below :

11 Screw the nut item 7 (as above picture) to push the seal cartridge until its correct position 
12 Remove tool and setting plates it. 34 and 36 of seal drwg assembly CDD500141 
13 Measure dimension to determine the thickness of shims item 27 and install shims of seal drwg assembly CDD500141 
Check the rotating and statoring parts relative position given by the dimension of : 0±0,1 as below picture :

14 

15 Install the ring item 32, split ring item 30 and the drive collar item 1.11 of seal drwg assembly CDD500141 
N REASSEMBLY AND INSTALLATION OF DE JOURNAL BEARING Done Comment

Reassembly and installation of discharge journal bearing are accomplished in the reverse order of the “removal and
1 disassembly” procedure. Make certain all mating parts are in proper alignment prior to tightening any hardware. 
NOTE : Check for correct running clearance. Journal bearing clearance = 0.243~0.195 mm

N HUB COUPLING REINSTALLATION Done Comment


NOTE : the hub coupling reinstallation only will be done after all DGS replacement (either DGS replacement for 1 side
1 only or both sides) completed and also after the leak test by pressurizing of the compressor to 7~8 Bar to check the O- 
ring installation for any damage during seal installation completed

2 Install the hub coupling, push the hub coupling onto the shaft manually as far as possible and install the dial gauge 

This document is the property of Total. It must not be stored reproduced or disclosed to others without written approval from the Company.
JVA Offshore OML102 INT-PRD-102-MTCM-XXXXX

DRY GAS SEAL REPLACEMENT PROCEDURE


MP COMPRESSOR 28-KA-3122A/B

Rev: 00 Date: 20/03/2016 Page: 11 of 20


Maintenance plan No: xxxxxxxxxx

3 Measure the distance between hub face to shaft end (A0 as below picture) and compared with the previous measurement of A1
(before dismantling). The difference (A1-A0) will be the required movement of the hub coupling to its original position by using
the special hydraulic tools (to be monitored the movement by using the dial gauge).

- Install the hub coupling with the special tools as below :

4 

- Install the hydraulic jack equipment SKF72910B and SKF729124 and ensure the fitting connection s are already tightened
properly

CAUTIONS :
1 - Never exceed an oil pressure of 2450 bars, in order to preclude injury to personnel and tool damages. Do not forget
5 that the hub coupling placement itself, over the shaft cone, causes a pressure rise. 
2 - After having finally installed the hub coupling collar and reduced the oil pressure down to zero, wait for 2 hours
minimum before removing the tool, so that all oil will be drained off.

Pump the hydraulic oil to the special tool for coupling hub installer to pressure as follows :
- Expander side (center plug) : Max 2450 Barg (by using SKF72910B)
- Pusher side (outer connection): Max 100 MPa (by using SKF729124)
6 
WARNING : NEVER STAND UP IN FRONT OF THE SPECIAL TOOL FOR COUPLING HUB INSTALLER
WHILE IT IS UNDER HIGH HYDRAULIC PRESSURE
7 Hold the condition until 2-4 hours. 
Release the pressure at center socket (expander) gradually around one hour before release the pusher pressure. Check the hub
8
movement (if any) from the dial gauge when release the pusher pressure

Remove the special tools and measure again the distance between hub face to shaft end (A1) to ensure the hub has been installed
9
back to its original position and check again DBSE

10 Reinstall the coupling guard with its piping 

This document is the property of Total. It must not be stored reproduced or disclosed to others without written approval from the Company.
JVA Offshore OML102 INT-PRD-102-MTCM-XXXXX

DRY GAS SEAL REPLACEMENT PROCEDURE


MP COMPRESSOR 28-KA-3122A/B

Rev: 00 Date: 20/03/2016 Page: 12 of 20


Maintenance plan No: xxxxxxxxxx

11.4 NON DRIVE SIDE (NDE) DRY GAS SEAL REPLACEMENT

N REMOVAL OF NDE COVER AND OUTER THRUST BEARING – Reff Drawing CDD300534 Done Comment
1 Remove all pipings to make it possible to withdraw the guard assembly (4) 
2 CAUTION: Be careful with temperature cable sensor and don’t let any removed parts fall into lube oil drain port 
3 Remove all screws (40) and guard plug (12) 
4 Remove all screws (42) and dismantle upper half guard (4) 
5 Remove axial probes and instrumentation connections 
6 Remove upper half guard (4) 
7 On the cover - Install the lifting lug with the screws item 4 on outer thrust housing (active thrust bearing) 
8 On the shaft - Fix the sleeve item 7 at thrust side and fix then with a nut 
9 On the cover – Remove all screws (45) and remove the outer thrust housing 
N HYDRAULIC DISASSEMBLY OF THRUST COLLAR Done Comment
Drawing CDD101174 – Remove the nut (23), washer (22), spacer (21) and the thrust collar (20) using tool CPD900011#2 (as
below picture):

1 

2 Prepare a hydraulic pump fitted with a pressure gauge and a flexible hose 
WARNING :
1. Never exceed an oil pressure of 2400 Bar in order to avoid injury to personnel and tool damage. DO NOT forget that the
3
collar placement, itself, over the shaft cone causes a rise in pressure

2. The tool screws must be tightened slowly and evenly (use a torque wrench)
Install the disassembling tools
4 WARNING : NEVER TO DIASSEMBLE THE THRUST COLLAR WITHOUT THE DISASSEMBLING TOOL IN 
PLACE
5 Connect the pump to the compressor shaft using the flexible hose 
6 Vent the circuit of air 
7 Tighten the tool screws to a 4 mkg torque and build up the oil pressure to 500 Bar 
Wait 10 minutes for the oil to be well distributed, retighten the screws to 3 mkg, and build up pressure to 250 Bar. Repeat this step
8
until a leak appears (unstable pressure on the pressure gauge)

Admit oil quickly with help of the pump so as, in spite of the leakage, to increase the pressure, until the thrust collar gets separated
9
(characterized by a sharp snap)

NOTE :
10 DISASSEMBLING IS PERFORMED AT HIGHER PRESSURE THAN ASSEMBLING, COMPLIANCE WITH THE 
PRESSURIZING RATE IN PREVENTING SEIZURE MARKS ON EITHER COLLAR OF THE SHAFT

This document is the property of Total. It must not be stored reproduced or disclosed to others without written approval from the Company.
JVA Offshore OML102 INT-PRD-102-MTCM-XXXXX

DRY GAS SEAL REPLACEMENT PROCEDURE


MP COMPRESSOR 28-KA-3122A/B

Rev: 00 Date: 20/03/2016 Page: 13 of 20


Maintenance plan No: xxxxxxxxxx

N REMOVAL OF OUTER THRUST BEARING AND JOURNAL BEARING – Reff Drawing CDD300534 Done Comment
Fix the anchor point item 2 on the inner thrust housing (inactive thrust bearing) with the screws item 6 as below :

1 

2 On the cover - Install the lifting lug with the screws item 4 on thrust housing 
3 On shaft – remove the inner thrust housing from the compressor 
4 On shaft – Remove the tools 
On NDE cover - Screw the guiding rod at thrust side item 8 on the cover

5 

6 On shaft – Fix the sleeve item 7 at thrust side and fix then with a nut 
7 On shaft - Install the screw item 9 for extract the thrust housing 
8 Install the anchor point item 2 at thrust side on the inlet end bearing housing with the screw item 5 
9 On Anchor point – Fix the lifting lug item 1 on anchor point with the screws item 4 
10 On shaft - Remove the inlet end bearing housing on shaft 
11 Remove the tools and finish the dismantling of the inlet end bearing housing 
N INSPECTION OF NDE THRUST AND JOURNAL BEARING Done Comment
Clean all parts thoroughly, and inspect each thrust pad for signs of excessive wear or score marks. Replace any pad which is
1 unserviceable. Pads are serviceable as long as the seating surface is not worn through the babbit. Inspect the thrust collar for heat 
cracks and scoring
Inspect the seating surface of each journal bearing pad for signs of excessive wear or score marks. Replace any pads that indicate
2
excessive wear.

3 Inspect all remaining parts for nicks, breaks, damaged threads of any other damage and repair, or replace as necessary 

This document is the property of Total. It must not be stored reproduced or disclosed to others without written approval from the Company.
JVA Offshore OML102 INT-PRD-102-MTCM-XXXXX

DRY GAS SEAL REPLACEMENT PROCEDURE


MP COMPRESSOR 28-KA-3122A/B

Rev: 00 Date: 20/03/2016 Page: 14 of 20


Maintenance plan No: xxxxxxxxxx

N
REMOVAL OF NDE DRY GAS SEAL (DGS) – Reff NG-018-P2-TNS-701530, NG-018-P2-TNS-700540 and CDD902469 Done Comment
On the cover DE side - Lock the shaft in its running position. The key-groove of rotor with mark “O’ in front of anti rotation pin in
seal. Use the stud item 14 and the locking plate item 16 secured by nuts item 7

1 

Remove the ring item 32, split ring item 30 and the drive collar item 1.11 as per seals assembly drawing CDD500141 as below :

2 

Install the setting plates it. 34 and 36 of seal assembly drawing CDD500141 and ensure that the marks "T" of all parts of seal are
3
aligned.

4 Install the ring item 15 on the shaft 
On the seal cartridge - Fix the support item 18 on setting plates item 16 with the 4 screws CHC item 19. Install the support item 17
5
secured screws H item 20

6 On the NDE cover – Fix the guiding rod item 21 
7 On the shaft – Install sleeve of protection item 2 and the nut item 23 
8 On the shaft - Install items 1-4-5 with screws item 3 

This document is the property of Total. It must not be stored reproduced or disclosed to others without written approval from the Company.
JVA Offshore OML102 INT-PRD-102-MTCM-XXXXX

DRY GAS SEAL REPLACEMENT PROCEDURE


MP COMPRESSOR 28-KA-3122A/B

Rev: 00 Date: 20/03/2016 Page: 15 of 20


Maintenance plan No: xxxxxxxxxx

9 On sleeve – Screw the screw item 4 to pull the seals cartridge and remove it with the support item 17

WARNING : FULLY ATTENTION AND USE THE PROPER LIFTING DEVICE FOR HANDLING THE DRY GAS
SEAL TO AVOID THE DROP OBJECT WHICH COULD LEAD PEOPLE INJURY AND/OR MATERIAL DAMAGE
10 Remove the tools 
N INSPECTION OF NDE DRY GAS SEAL Done Comment
Shaft and seal housing inspection: check to all surfaces to contacted by O-rings for any sharp angle, sharp surface, roughness and
rust spot to prevent O-ring damage during installation
1
NOTE : shaft and seal housing surface roughness shall not exceed 1.6 micron. All pitting and rust spots must be removed,

and any imperfection must be corrected before seal installation

2 Inspect ‘O’ rings for nicks, cuts or deterioration and replace as necessary 
3 Inspect all remaining parts for cracks, breaks excessive wear or any other damage and repair or replace as necessary 
INSTALLATION OF NDE DRY GAS SEAL (DGS)
N Done Comment
Reff NG-018-P2-TNS-701530, NG-018-P2-TNS-700540 and CDD902469
On the NDE cover - Lock the shaft in its running position. The key-groove of rotor with mark "0" in front of anti-rotation pin in
seal. Use the stud item 11 and the locking plate of immobilization item 12 secured by nuts item 7 and 24 as below :

1 

This document is the property of Total. It must not be stored reproduced or disclosed to others without written approval from the Company.
JVA Offshore OML102 INT-PRD-102-MTCM-XXXXX

DRY GAS SEAL REPLACEMENT PROCEDURE


MP COMPRESSOR 28-KA-3122A/B

Rev: 00 Date: 20/03/2016 Page: 16 of 20


Maintenance plan No: xxxxxxxxxx

On the seal cartridge - Install the setting plates it. 34 and 36 of seal drwg assembly CDD500141 and ensure that the marks "T" of all
parts of seal are aligned (see as below) :

2 

3 On the seal cartridge - Ensure the installation of “O” ring without damage, lightly grease. 
NOTE : job sequence from #4 until #11 refer to the picture as below

5 On the shaft – Installation of ring item 15 on the shaft 


6 On the shaft – Install sleeve of protection item 2 and the adaptor item 8. Use the protection sleeve of tool CDD902469 
7 Fix the support item 18 on setting plates with the 4 screw item 19. Install the support item 17 and fix them with 2 screw item 20 
8 On NDE cover – Fix the guiding rod item 21 on the cover 
9 Install the cartridge and ensure alignment of anti-rotation pin and “O” in upper part 

This document is the property of Total. It must not be stored reproduced or disclosed to others without written approval from the Company.
JVA Offshore OML102 INT-PRD-102-MTCM-XXXXX

DRY GAS SEAL REPLACEMENT PROCEDURE


MP COMPRESSOR 28-KA-3122A/B

Rev: 00 Date: 20/03/2016 Page: 17 of 20


Maintenance plan No: xxxxxxxxxx

10 On shaft - Fix the sleeve item 2 with the screws item 3 and install 6-14-13-9-10 as below :

11 Screw the nut item 7 (as above picture) to push the seal cartridge until its correct position 
12 Remove tool and setting plates it. 34 and 36 of seal drwg assembly CDD500141 
13 Measure dimension to determine the thickness of shims item 27 and install shims of seal drwg assembly CDD500141 
Check the rotating and statoring parts relative position given by the dimension of : 0±0,1 as below picture :

14 

15 Install the ring item 32, split ring item 30 and the drive collar item 1.11 of seal drwg assembly CDD500141 
N REASSEMBLY AND INSTALLATION OF NDE THRUST AND JOURNAL BEARING Done Comment
1 CAUTION : make certain that the bearing pads reassembly and that all parts are free from dirt and foreign materials 
Reassembly and installation of the thrust and inlet journal bearing are accomplished in the reverse order of the ‘removal and
2 disassembly’ procedure. 
NOTE : for cover (3) reassembling use stems and nuts M12

NOTE : AFTER THE THRUST BEARING HAS BEEN REASSEMBLED AND INSTALLED, CHECK THE THRUST
4
BEARING END PLAY WHICH SHOULD BE OF 0.35 TO 0.45 MM

N HYDRAULIC ASSEMBLY OF THRUST COLLAR Done Comment


1 Rub the shaft cone with oil and assembled the collar (never forget the spacer) 

This document is the property of Total. It must not be stored reproduced or disclosed to others without written approval from the Company.
JVA Offshore OML102 INT-PRD-102-MTCM-XXXXX

DRY GAS SEAL REPLACEMENT PROCEDURE


MP COMPRESSOR 28-KA-3122A/B

Rev: 00 Date: 20/03/2016 Page: 18 of 20


Maintenance plan No: xxxxxxxxxx

2 Install the assembling tool using tool CPD900011 :

3 Connect the pump to the compressor shaft with the flexible hose 
4 Drain the circuit free of air 
Tighten the tool screws evenly, build up oil pressure (maxi 150 bar). The mounting is realized a several operations of about 0.5mm
5
until the collar comes into contact with the spacer.

WARNING :
1. Never exceed an oil pressure of 2400 Bar in order to avoid injury to personnel and tool damage. DO NOT forget that the
collar placement, itself, over the shaft cone causes a rise in pressure
6
2. The tool screws must be tightened slowly and evenly (use a torque wrench)

3. After having finally assembly of thrust collar, and reduced the oil pressure to zero, wait a minimum of 2 hours before
removing the assembling tool clear, so that all the oil will be drained
7 Reinstall the nut, washer and spacer 
8 Reinstall all screws and the cover with outer thrust. Use jack-screws 
N CHECK AND ADJUSMENT THE THRUST BEARING END CLEARANCE Done Comment
1 Push the compressor shaft in one direction until it is certain that the thrust pads are against the thrust collar 
2 Install a dial indicator against the compressor shaft end 
3 Pull the compressor shaft as far as possible in the opposite direction and note the dial indicator reading 
If the dial indicator reading shows and excessive end clearance, this indicates that the pads are worn or these is an incorrect number
4
of shims

If the dial indicator reading is less than the desired value, shims may be added to increase the end clearance, however, if an
5
excessive of shims is required, the thrust pads may be warped or out of place

N REMAINING REINSTATEMENT AND LEAK TEST Done Comment
1 Reinstall probes and RTD 
2 Reinstall all pipings 
Pressurize the compressor to 7~8 Bar to make sure that “O” rings have not been damaged during seal installation and observe the
3
reading of pressure for any decreasing. See NOTE as below if found any abnormality

NOTE :
After both seal cartridges, journal and thrust bearing are installed (and before coupling installation), it is suggested
to pressurize the compressor to 7~8 Bar to make sure that “O” rings have not been damaged during seal installation.
If an excessive leakage is observed, the shaft should be turned by hand in order to correct misalignment of faces. DO
NOT keep turning the shaft if the leakage remains excessive but determine the cause for such an excessive leakage.
When everything is found to be satisfactorily installed, proceed with coupling installation.

This document is the property of Total. It must not be stored reproduced or disclosed to others without written approval from the Company.
JVA Offshore OML102 INT-PRD-102-MTCM-XXXXX

DRY GAS SEAL REPLACEMENT PROCEDURE


MP COMPRESSOR 28-KA-3122A/B

Rev: 00 Date: 20/03/2016 Page: 19 of 20


Maintenance plan No: xxxxxxxxxx

11.5 DE-ISOLATION
Location Task OK
Control Room Inform the Control Room that a run test is to be performed and request for de-isolation 
De-Isolate discharge valve 
De-Isolate the suction valve 
Electrical to de-isolate the main electrical motor and auxiliaries 
In the Field
Operations to perform the necessary process de-isolations 
Instrumentation/Automation to remove the necessary inhibitions 
Inform the Control Room when ready to start MP compressor 28-KA-3122A/B 

12 RUNNING TEST AND OBSERVATION


12.1 RUNNING TEST & PARAMETER RECORDING
N 56-KB-573A/B Running Parameter Reading Unit Comments

1 Speed of the compressor RPM


2 Suction Gas Flow Rate KSM3/H
3 Suction Pressure Bar
o
4 Suction Temperature C
5 Discharge Pressure Bar
o
6 Discharge Temperature C
N Parameter of NDE Dry Gas Seal Reading Unit Comments

1 28PIT312281 NDE primary DGS failure indication (trip SP = 1.8 Barg) Bar
2 28PDIT312291 NDE DGS alarm failure indication (High SP = 0.51 Bar, Low SP = 0.035 Bar) Bar
3 28PDIT312293 NDE secondary DGS failure indication (Low Low SP = 0.025 Bar) mBar
N Parameter of DE Dry Gas Seal Reading Unit Comments

1 PIT312280 DE primary DGS failure indication (trip SP = 1.8 Barg) Bar


2 PDIT312290 DE DGS alarm failure indication (High SP = 0.51 Bar, Low SP = 0.035 Bar) Bar
3 PDIT312292 DE secondary DGS failure indication (Low Low SP = 0.025 Bar ) mBar

12.2 Observations & remarks

To be filled in if Intervention / Follow Up Action is Required


Work Permit number
Long term inhibition / isolation required YES NO Permit Number
Follow up action to be created in SAP YES NO WO Number

This document is the property of Total. It must not be stored reproduced or disclosed to others without written approval from the Company.
JVA Offshore OML102 INT-PRD-102-MTCM-XXXXX

DRY GAS SEAL REPLACEMENT PROCEDURE


MP COMPRESSOR 28-KA-3122A/B

Rev: 00 Date: 20/03/2016 Page: 20 of 20


Maintenance plan No: xxxxxxxxxx

12.3 Completion
 Housekeeping of the work area.
 Inform the control room at the end of job.
 Should it be safe to do so, remove all isolations and make the unit available for duty.
 Sign end of work on the WORK PERMIT and write your comments in SAP reporting.

Validation Performed by Mechanical supervisor

Name

Date

Signature